Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Laguna Creek Restoration and Flood Control Project (Lake or Streambed Alteration Agreement No. EPIMS-CCA-49733-R3)

Forecast
EPIMS-CCA-49733-R3State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Laguna Creek Restoration and Flood Control Project, identified by Lake or Streambed Alteration Agreement No. EPIMS-CCA-49733-R3, is an environmental initiative executed by the California Department of Fish and Wildlife pursuant to Fish and Game Code section 1602. Led by the City of Moraga and applicant Deidre Castillo, the project is located in Contra Costa County, California. The primary objective is to restore a reach of Laguna Creek to create a natural stream and enhance habitat for the California red-legged frog. A Notice of Determination dated July 25, 2025, confirms that the project will not have a significant environmental effect within the jurisdiction of the California Department of Fish and Wildlife. The scope of work includes the removal of 243 linear feet of corrugated metal pipe to be replaced by an arch culvert, the demolition of a concrete spillway to be replaced with a natural material weir, and the relocation of an 18-inch sewer line. Additional activities involve clearing 2.60 acres of vegetation, removing 39 riparian trees, diverting water, and constructing a low-flow channel and floodplain. Technical specifications include excavation and grading for the new channel, the installation of boulders and planted rock slope protection, and on-site restoration through the planting of native riparian trees. Coordination is managed by Mark Summers of the City of Moraga and Torrey Soland of the Department of Fish and Wildlife.

General Info

Authorize habitat restoration and flood control along Laguna Creek, replacing pipe with arch culvert, replanting native trees, and protecting red-legged frog habitat.

Agency

California → City of Moraga

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Moraga
Contacts2 people available
OfficeN/A

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-CCA-49733-R3), pursuant to Fish and Game Code section 1602, the project Applicant, Deidre Castillo. The project proposes to restore the reach of Laguna Creek at the Project Location with a natural stream and habitat enhancements for California red-legged frog. To accomplish this, the project proposes to remove 243 linear feet of an existing corrugated metal pipe and install an arch culvert in its place, demolish an existing concrete spillway within the project area and replace it with a weir or similar structure composed of natural materials, relocate an 18-inch sewer line, and construct a low-flow channel and floodplain. Project activities are limited to clearing of approximately 2.60 acres of vegetation; removal of 39 riparian trees; diversion of water around the work area; excavation and removal of the existing culvert; excavation and removal of an existing sewer pipeline or filling of the pipeline with cement slurry to abandon it in place; installation of a sewer pipeline along a new alignment within the project site; demolition of the existing spillway and replacement with natural materials; excavation and grading to construct the new channel; installation of planted rock slope protection and boulders within the channel; installation of a new arch culvert; and on-site restoration, including installation of native riparian tree plantings.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 21 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

about 24 hours ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS