Lohr Napa River Bank Repair, (Lake or Streambed Alteration Agreement No. EPIMS-NAP-57553-R3)

Forecast
EPIMS-NAP-57553-R3State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS-NAP-57553-R3 with Streamline Engineering, represented by Eric Austensen, for the Lohr Napa River Bank Repair project in St. Helena, California. The project is designed to stabilize approximately 100 feet of the Napa River bank adjacent to a water storage pond and address a ten-foot head cut where a roadside ditch from Pratte Avenue meets the river. To achieve this, the contractor will construct a live vegetated rock revetment using 1 to 3-ton boulders filled with a gravel and rock growing medium, and plant approximately 380 willow cuttings. Additional work includes the removal and legal disposal of a fallen concrete headwall and the removal of six riparian trees, including various oak and eucalyptus species. The project will result in 0.063 acres of permanent and 0.164 acres of temporary impacts to stream and riparian habitats. Construction involves using a wheeled front-end loader and a tracked excavator, with a temporary access route extending 580 feet downstream. This project is executed pursuant to Section 1602 of the Fish and Game Code and is exempt under California Code of Regulations title 14, section 15302, Class 2, as it involves the replacement or reconstruction of existing structures on the same site for the same purpose. Administrative oversight is provided by Environmental Scientist Nicholas Magnuson of the Fish and Wildlife Region 3 Bay Delta office.

General Info

Streamline Engineering to stabilize 100 linear feet of eroded riverbank with rock revetment and willow plantings in St. Helena.

Agency

California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield

Place of Performance

St. Helena, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Office AddressN/A

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-NAP-57553-R3, pursuant to Section 1602 of the Fish and Game Code, to Streamline Engineering as represented by Eric Austensen. The Project is limited to stabilizing approximately 100 feet of the Napa River bank adjacent to a water storage pond. The Project area includes a ten-foot head cut occurring where a roadside ditch draining from Pratte Avenue joins the river. The Project will construct a live vegetated rock revetment to achieve the primary purpose of preventing loss of the pond via erosion of the embankment and to stabilize the head cut. The vegetated rock revetment will be constructed by placing large (1 to 3-ton) boulders and filling the rock interstices with a growing medium consisting of gravel and 4-inch to 9-inch rock. Rock will be transported to the revetment area using a wheeled front-end loader along an access route of dry stream bed, with an entry point approximately 580 feet downstream from the revetment area. Placed rock will not extend into the channel beyond the previous position of the eroded bank. One tracked excavator will be used below top of bank for the construction of the revetment and stored above top of bank when not in use. The revetment will be planted with approximately 380 willow (Salix spp.) cuttings. An existing fallen concrete headwall will be hauled offsite and disposed of in accordance with local and state regulations. The Project will result in 0.063 acres (2,700 square feet) and 100 linear feet of permanent impacts to stream and riparian habitat resulting from the rock revetment, and 0.164 acres (7,140 square feet) and 185 linear feet of temporary impacts to stream and riparian habitat resulting from the revetment worksite and equipment access point downstream. The 580-foot-long temporary access route will be used by the front-end loader and up to three round-trip passes of the excavator. The project will remove six riparian trees including three oak trees (Quercus ssp.) with diameter at breast height (DBH) of 10 inches each, one four-inch DBH oak tree, one 30-inch DBH Eucalyptus tree (Eucalyptus spp.), and one 12-inch DBH Eucalyptus tree.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 21 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

1 day ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS