Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Lohr Napa River Bank Repair, (Lake or Streambed Alteration Agreement No. EPIMS-NAP-57553-R3)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS-NAP-57553-R3 with Streamline Engineering, represented by Eric Austensen, for the Lohr Napa River Bank Repair project in St. Helena, California. The project is designed to stabilize approximately 100 feet of the Napa River bank adjacent to a water storage pond and address a ten-foot head cut where a roadside ditch from Pratte Avenue meets the river. To achieve this, the contractor will construct a live vegetated rock revetment using 1 to 3-ton boulders filled with a gravel and rock growing medium, and plant approximately 380 willow cuttings. Additional work includes the removal and legal disposal of a fallen concrete headwall and the removal of six riparian trees, including various oak and eucalyptus species. The project will result in 0.063 acres of permanent and 0.164 acres of temporary impacts to stream and riparian habitats. Construction involves using a wheeled front-end loader and a tracked excavator, with a temporary access route extending 580 feet downstream. This project is executed pursuant to Section 1602 of the Fish and Game Code and is exempt under California Code of Regulations title 14, section 15302, Class 2, as it involves the replacement or reconstruction of existing structures on the same site for the same purpose. Administrative oversight is provided by Environmental Scientist Nicholas Magnuson of the Fish and Wildlife Region 3 Bay Delta office.

General Info

Streamline Engineering to stabilize 100 linear feet of eroded riverbank with rock revetment and willow plantings in St. Helena.

Agency

California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

St. Helena, CA

Set-Aside

NONE

Documents

(1)

EPIMS-NAP-57553-R3 Notice of Exemption for Napa River Bank Repair

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Office AddressN/A
Contacts
Nicholas MagnusonEnvironmental Scientist
Eric AustensenBusiness Owner

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-NAP-57553-R3, pursuant to Section 1602 of the Fish and Game Code, to Streamline Engineering as represented by Eric Austensen. The Project is limited to stabilizing approximately 100 feet of the Napa River bank adjacent to a water storage pond. The Project area includes a ten-foot head cut occurring where a roadside ditch draining from Pratte Avenue joins the river. The Project will construct a live vegetated rock revetment to achieve the primary purpose of preventing loss of the pond via erosion of the embankment and to stabilize the head cut. The vegetated rock revetment will be constructed by placing large (1 to 3-ton) boulders and filling the rock interstices with a growing medium consisting of gravel and 4-inch to 9-inch rock. Rock will be transported to the revetment area using a wheeled front-end loader along an access route of dry stream bed, with an entry point approximately 580 feet downstream from the revetment area. Placed rock will not extend into the channel beyond the previous position of the eroded bank. One tracked excavator will be used below top of bank for the construction of the revetment and stored above top of bank when not in use. The revetment will be planted with approximately 380 willow (Salix spp.) cuttings. An existing fallen concrete headwall will be hauled offsite and disposed of in accordance with local and state regulations. The Project will result in 0.063 acres (2,700 square feet) and 100 linear feet of permanent impacts to stream and riparian habitat resulting from the rock revetment, and 0.164 acres (7,140 square feet) and 185 linear feet of temporary impacts to stream and riparian habitat resulting from the revetment worksite and equipment access point downstream. The 580-foot-long temporary access route will be used by the front-end loader and up to three round-trip passes of the excavator. The project will remove six riparian trees including three oak trees (Quercus ssp.) with diameter at breast height (DBH) of 10 inches each, one four-inch DBH oak tree, one 30-inch DBH Eucalyptus tree (Eucalyptus spp.), and one 12-inch DBH Eucalyptus tree.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 10 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
Mayo Park - Pond Creek Bank Improvements
Solicitation # 26-058
The Mayo Park Pond Creek Bank Improvements project is a construction effort by Santa Rosa County, Florida, designed to remedy severe creek bank erosion and enhance storm resiliency. The scope of work involves the excavation of unsuitable materials and the stabilization of approximately 100 linear feet of streambank using natural materials, including logs, tree limbs, stone, select fill, and native plantings. The project also includes an optional component, Bid Alternate A, which covers the repair of a damaged seawall along the western shore of the creek. All work must adhere to Santa Rosa County and FDOT standards, with technical oversight provided by Mott MacDonald. The contract is structured as a lump sum agreement with a substantial completion deadline of 120 calendar days and final completion within 150 calendar days from the notice to proceed. Financial terms include a 5% retainage on payments and liquidated damages of 1,685 dollars per day for delays. Bidders must provide a bid guarantee of 5% of the total price, and performance and payment bonds are required for contracts exceeding 200,000 dollars. The project is subject to various federal and state regulations, including the Build America, Buy America Act, the Davis-Bacon Act for prevailing wages, and Florida Statutes Chapter 119 regarding public records. A reimbursement agreement with the Florida Fish and Wildlife Conservation Commission provides a maximum compensation limit of 375,000 dollars for the stabilization efforts.
Engineering

POSTED

about 13 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the Lake Pontchartrain and Vicinity (LPV) Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm fixed-price contract, identified by solicitation number W912P826BA009 and NAICS code 237990, has an estimated construction magnitude between $25 million and $100 million. The scope of work involves repairing existing foreshore protection and embankments across Reaches 1, 2, 3, and 4. Key activities include site access construction, demolition, clearing and grubbing, excavation, and the placement of embankment, geotextiles, and stone, as well as turf establishment and maintenance. Bids are due by 10:00 a.m. on October 19, 2026, with a question cutoff of October 2, 2026. Award will be made as a whole to a single bidder based on the provided unit prices, provided the bid is reasonable and balanced. The contractor must adhere to USACE EM 385-1-1 (2024) safety standards and FHWA MUTCD guidelines. Notable contract requirements include the use of approved testing laboratories, compliance with the Davis-Bacon Act, and the provision of performance and payment bonds. Liquidated damages for delays are set at $4,295.00 per calendar day. Performance begins following the approval of an Accident Prevention Plan and Contractor Quality Control Plan, with a preliminary project schedule due within 15 days of the Notice to Proceed.
W07V Endist New Orleans

POSTED

about 14 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS