Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Award Notice opportunity from California was posted on August 21, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CUP 98-0022 Mesquite Mine Expansion

Awarded
EPIMS-IMP-31209-R6State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 21 hours ago

DEADLINE

N/A
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

1 day ago

DEADLINE

in 29 days

AI Contract Overview

Show more

The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement EPIMS-IMP-31209-R6 for the Mesquite Leach Pad Optimization Project in eastern Imperial County, California. This regulatory agreement, issued pursuant to Section 1602 of the Fish and Game Code, authorizes the construction of Leach Pad 8 at the Western Mesquite Mine. The project covers 87.28 acres and involves integrating new infrastructure into the existing mine site, specifically focusing on impacts to streams associated with the expansion. Technical specifications for the project require the leach pad to be constructed on at least 12 inches of low-permeability or compacted soil, overlain by an 80-mil linear low-density polyethylene liner and a protective layer of crushed rock or gravel. A critical component of the design is the installation of a leak detection system beneath the primary solution collection pipes. To ensure environmental protection, all activities must occur within an existing fenced area designed to exclude desert tortoises. The CDFW has determined that the project will not have a significant environmental effect within its jurisdiction, provided that the adopted mitigation measures and monitoring plans are followed.

General Info

CDFW authorizes Leach Pad 8 construction at Western Mesquite Mine in Imperial County.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

forecast

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 6 - Inland Deserts, Ontario
Contacts2 people available
OfficeN/A

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMSIMP-31209-R6, pursuant to Section 1602 of the Fish and Game Code to County of Imperial, Planning Commission. The Project is limited to impacts to streams associated with the construction of Leach Pad 8 on the remaining eastern area of Section 16 along the eastern side of Pad 6 of the existing Western Mesquite Mine. The area of Leach Pad 8 covers 87.28 acres. The Leach Pad 8 design will be tied into existing leach pad and processing infrastructure. Pad 8 will generally be constructed on at least 12 inches of low permeability or compacted native or imported soil and overlain with an 80-mil linear low-density polyethylene. A layer of crushed rock/gravel will be put on top of the liner to protect the liner and provide a drainage layer. A leak detection system will be included in the design and construction underneath the primary solutions collection pipes. All Project the activities will occur within an area inside an existing fence designed to exclude desert tortoise from the Mine site.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS