Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Bel Marin Keys Community Services District Lock and Flood Gate Maintenance Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Bel Marin Keys Community Services District Lock and Flood Gate Maintenance Project involves the repair and in-kind replacement of operational mechanisms, seals, and linkages at the North and South Lagoon Navigation Locks and the North Flood Gates located in Novato, California. Work is structured into three sequential annual phases—Phase A for the South Lock, Phase B for the North Lock, and Phase C for the North Flood Gates—with each phase conducted exclusively between September 1 and January 31 to align with seasonal restrictions designed to protect sensitive habitats and species, particularly the California Ridgway’s rail and aquatic life in Novato Creek. All activities are performed using existing infrastructure, dewatering via stoplogs and floating platforms, with no new fill or structural modifications permitted. The project is administratively exempt from full environmental review under CEQA Section 15301 as an existing facility maintenance action, and a Notice of Exemption has been filed, alongside a certified exemption finding. No federal contract clauses, funding, or accounting codes apply; the district serves as the lead agency with no designation of a formal contracting officer, COR, or COTR. The sole point of contact is Lisa Lue, District Manager, and all work is overseen by the district with inspection and acceptance occurring on-site. No contract value, pricing, or evaluation factors are disclosed, and the procurement type is listed as a forecast with no formal solicitation number. Payment details are limited to a $50 fee paid via cash or check for environmental filing, with no invoicing methods or remittance instructions specified. Attachments include the Notice of Exemption and certified exemption documents, but no packaging, marking, delivery, or electronic submission protocols are outlined, indicating a locally administered, environmentally constrained, and phasal maintenance effort without standard federal procurement structure.

General Info

Annual phasal maintenance of locks and flood gates in Novato, CA, with seasonal work to protect habitats, no federal oversight, exempt under CEQA.

Agency

California → Bel Marin Keys Community Services District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

327 Montego Key, Novato, CA, 94949

Set-Aside

NONE

Documents

(2)

Bel Marin Keys Navigation Locks Maintenance Project Overview

PDFother

Bel Marin Keys Community Services District Lock and Flood Gate Maintenance Project Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Bel Marin Keys Community Services District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Bel Marin Keys Community Services District
Office AddressN/A
Contacts
Lisa LueDistrict Manager

Full Description

Show more
Maintenance and repairs on the lagoon navigation locks, flood gates and adjacent seawalls. Repairs are proposed at the North and South Locks and flood gates. The lock gate operational mechanisms, seals, and linkages at the North and South Locks will be repaired and replaced in-kind.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details