Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Mallard Pointe 1951 LLC Residential Redevelopment Project (Notification of Lake or Streambed Alteration, No. EPIMS-MAN-55725-R3

Forecast
EPIMS-MAN-55725-R3State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS-MAN-55725-R3 with Marlon Just-Vargus of Mallard Pointe 1951 LLC for a residential redevelopment project in Belvedere Lagoon, Marin County. Pursuant to Section 1602 of the Fish and Game Code, the project is authorized for the removal and reconstruction of a shoreline bulkhead and the modification of dock facilities. The bulkhead work involves replacing existing rip rap and redwood timbers with vinyl sheet piles, resulting in a net reduction of permanent impacts by 0.186 acres. The dock work includes the repair of four docks, reconfiguration of 12 docks, splitting of two docks, removal of one dock, and the construction of one new dock. This process involves replacing 191 PVC-wrapped timber and concrete piers with 160 new PVC-wrapped timber piers, leading to a total dock area of 2,803 square feet and a net reduction of permanent lake impacts by approximately 0.17 acres. The project is designated as a Class 2 categorical exemption under California Code of Regulations, title 14, section 15302, as it involves the replacement of existing structures on the same site with substantially the same purpose and capacity. All work must be performed using excavators stationed on the land side of the bulkhead, with installation utilizing vibratory shaker heads or by pushing sheets into the mud. Administrative oversight is managed by Jordan Beaton, an Environmental Scientist with the California Department of Fish and Wildlife, Region 3.

General Info

Mallard Pointe replaces bulkhead and docks at Belvedere Lagoon, reducing lake impact by 0.17 acres under state permit.

Agency

California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield

Place of Performance

Belvedere, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Office AddressN/A

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-MAN-55725-R3, pursuant to Section 1602 of the Fish and Game Code to Marlon Just-Vargus, Mallard Pointe 1951 LLC. The Project is limited to the removal and reconstruction of existing bulkhead along the Lake shoreline, and the removal, repair, or rebuild of 19 existing docks and the construction of one new dock, as specifically outlined below. 1. Bulkhead work: The existing bulkhead consists of rip rap and redwood timbers which will be removed and replaced with vinyl sheet piles. The removal of rip rap will be done with an excavator stationed on the land side of the bulkhead. Placement of the new vinyl sheets will be done with the excavator via pushing the sheets into the mud, or use of a vibratory shaker head. The removal of the 250 cubic yards (cy) of rip rap will result in 0.207 acres of temporary impact, and the placement of new vinyl sheets will result in 10 cy of fill and 0.021 acres (900 LF) of permanent impact, for a net reduction of 0.186 acres of permanent impacts (8,102 square feet). 2. Dock work: In the current configuration the total area of all existing docks is 2,452 square feet. Four docks will be repaired within the same footprint, 12 docks will be reconfigured, two docks will be split into two separate docks, one dock will be removed, and one new dock will be constructed. The removal of docks and piers will be done with an excavator stationed on the land side of the bulkhead. Placement of the new piers will be done with the excavator via pushing the sheets into the mud, or use of a vibratory shaker head. The dock work involves two different types of activities and impacts to the Project area, including fill and shade. The existing docks composed of 191 polyvinyl chloride (PVC)-wrapped timber and concrete piers will be removed, resulting in a temporary impact of 22.92 cy of fill removal and 104.78 square feet (sq ft) of pier removal. Placement of 160 PVC-wrapped timber new piers will result in permanent impacts of 19.2 cy of fill and 87.78 sq ft of piers. The new configuration of docks will total 2,803 square feet resulting in 351 square feet of increased permanent shade impacts to the Lake. There will be a total net reduction of permanent impacts of approximately 0.17 acres (7,751 square feet) to the Lake.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 21 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

1 day ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS