Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Flume 48 Utility and Infrastructure Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The El Dorado Irrigation District is implementing the Flume 48 Utility and Infrastructure Replacement Project in El Dorado County, California, to enhance the reliability of the El Dorado Hydroelectric Project. The project involves replacing approximately 448 linear feet of an existing wooden flume, which is highly susceptible to wildfires and natural hazards, with a durable, ignition-resistant cast-in-place reinforced concrete U-shaped canal built on a Mechanically Stabilized Earth bench. The scope of work includes the demolition and disposal of the wooden flume, spillway, substructure, and a historic rock wall, as well as site preparation, vegetation clearing, and the installation of metal walkways and handrails. Construction is scheduled to be completed over two annual maintenance outages, typically occurring from October through December, with work suspended during the regular operational period from mid-December through September. The project has undergone a comprehensive environmental review under the California Environmental Quality Act, resulting in a Final Environmental Impact Report and a Notice of Determination confirming that the project will not have a significant effect on the environment. Key compliance requirements include the implementation of dust and emissions control, erosion prevention via SWPPP, and fire safety plans. Additionally, the contractor must provide specialized training for staff regarding biological, cultural, and tribal resources, with mandatory yearly recertification for personnel.

General Info

El Dorado Irrigation District replacing wooden flume with concrete canal in California.

Agency

California → El Dorado Irrigation District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Highway 50 east of Pollock Pines and west of Fresh Pond, CA, 95726

Set-Aside

NONE

Documents

(7)

SCH Summary Form for Flume 48 Utility and Infrastructure Replacement Project

PDFenvironmental-summary

Flume 48 Utility and Infrastructure Replacement Project Draft Environmental Impact Report

PDFenvironmental-impact-report

Notice of Determination for Flume 48 Utility and Infrastructure Replacement Project

PDFnotice-of-determination

Notice of Availability for Flume 48 DEIR

PDFspecial-notice

SCH 2024120943 Flume 48 Utility and Infrastructure Replacement Project Notice of Completion

PDFnotice-of-completion

SCH 2024120943 Notice of Completion for Flume 48 Utility and Infrastructure Replacement Project

PDFnotice-of-completion

Final Environmental Impact Report for Flume 48 Utility and Infrastructure Replacement Project

PDFfinal-environmental-impact-report

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → El Dorado Irrigation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → El Dorado Irrigation District
Office AddressN/A
Contacts
Michael C. BaronEnvironmental Review Analyst

Full Description

Show more
The District owns and operates the El Dorado Hydroelectric Project, which is licensed by the Federal Energy Regulatory Commission (FERC) as Project 184. Project 184 includes various conveyance structures (e.g., flumes, canals, tunnels, siphons) to convey approximately 1/3 of the District’s total drinking water supply to over 125,000 residents in El Dorado County, California, and also provides clean renewable energy through a 21-megawatt hydroelectric generation facility. Flume 48 is a component of this critical water conveyance system. The Project would replace approximately 448 linear feet of an existing wooden flume (i.e., Flume 48), which is highly susceptible to damage from wildfire and other natural hazards, with a more durable ignition resistant concrete conveyance structure (i.e., U-shaped concrete canal). The Project requires the removal and replacement of approximately 448 linear feet of wooden flume, spillway, wooden substructure, and a historic hand-stacked rock wall. Construction of a new water conveyance structure that involves construction of a rock wall with a cast-in-place reinforced concrete U-shaped canal built on a Mechanically Stabilized Earth bench. Construction of the Project is scheduled to occur during the District’s annual canal maintenance outage, which typically occurs annually from October through December. The Project would be completed over the course of two annual outages, with construction being suspended during the regular operational period of the canal (mid-December through September).

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 11 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
Mayo Park - Pond Creek Bank Improvements
Solicitation # 26-058
The Mayo Park Pond Creek Bank Improvements project is a construction effort by Santa Rosa County, Florida, designed to remedy severe creek bank erosion and enhance storm resiliency. The scope of work involves the excavation of unsuitable materials and the stabilization of approximately 100 linear feet of streambank using natural materials, including logs, tree limbs, stone, select fill, and native plantings. The project also includes an optional component, Bid Alternate A, which covers the repair of a damaged seawall along the western shore of the creek. All work must adhere to Santa Rosa County and FDOT standards, with technical oversight provided by Mott MacDonald. The contract is structured as a lump sum agreement with a substantial completion deadline of 120 calendar days and final completion within 150 calendar days from the notice to proceed. Financial terms include a 5% retainage on payments and liquidated damages of 1,685 dollars per day for delays. Bidders must provide a bid guarantee of 5% of the total price, and performance and payment bonds are required for contracts exceeding 200,000 dollars. The project is subject to various federal and state regulations, including the Build America, Buy America Act, the Davis-Bacon Act for prevailing wages, and Florida Statutes Chapter 119 regarding public records. A reimbursement agreement with the Florida Fish and Wildlife Conservation Commission provides a maximum compensation limit of 375,000 dollars for the stabilization efforts.
Engineering

POSTED

about 14 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the Lake Pontchartrain and Vicinity (LPV) Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm fixed-price contract, identified by solicitation number W912P826BA009 and NAICS code 237990, has an estimated construction magnitude between $25 million and $100 million. The scope of work involves repairing existing foreshore protection and embankments across Reaches 1, 2, 3, and 4. Key activities include site access construction, demolition, clearing and grubbing, excavation, and the placement of embankment, geotextiles, and stone, as well as turf establishment and maintenance. Bids are due by 10:00 a.m. on October 19, 2026, with a question cutoff of October 2, 2026. Award will be made as a whole to a single bidder based on the provided unit prices, provided the bid is reasonable and balanced. The contractor must adhere to USACE EM 385-1-1 (2024) safety standards and FHWA MUTCD guidelines. Notable contract requirements include the use of approved testing laboratories, compliance with the Davis-Bacon Act, and the provision of performance and payment bonds. Liquidated damages for delays are set at $4,295.00 per calendar day. Performance begins following the approval of an Accident Prevention Plan and Contractor Quality Control Plan, with a preliminary project schedule due within 15 days of the Notice to Proceed.
W07V Endist New Orleans

POSTED

about 15 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS