Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Eisele Vineyard Reservoir Maintenance Project, (Lake or Streambed Alteration Agreement No. EPIMS-NAP-30845-R3)

Forecast
EPIMS-NAP-30845-R3State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Eisele Vineyard Reservoir Maintenance Project, executed under Lake and Streambed Alteration Agreement EPIMS-NAP-30845-R3 by the California Department of Fish and Wildlife, involves comprehensive repairs to Araujo Reservoir No. 1 in Calistoga, Napa County. The scope of work includes the excavation and removal of the downstream dam embankment, the establishment of a seepage barrier cutoff trench, and the installation of internal drainage features. The dam embankment will be reconstructed with additional height to ensure adequate freeboard. Key technical requirements include approximately 30,000 cubic yards of excavation, the placement of 41,000 cubic yards of compacted soil, and the use of 800 cubic yards of imported sand and gravel for drainage. Additionally, the project entails replacing the embankment drain, outfall, and outlet conduit, including the installation of a 30-inch diameter cast-in-place outfall pipe and a new concrete drop outfall structure. To facilitate construction, water will be transferred from Araujo Reservoir No. 1 to Araujo Reservoir No. 2 via the existing irrigation system. The project will result in permanent impacts of 301 square feet to the reservoir and 0.1 acres to a nearby seasonal wetland, along with minor impacts to an unnamed ephemeral stream. Temporary impacts include 1.05 acres of the reservoir for equipment access and material staging. No riparian trees will be removed. The project has been granted a Notice of Exemption dated August 13, 2025, as it qualifies as repair and maintenance with negligible expansion of use under California Code of Regulations. Primary administrative contact for the project is Environmental Scientist Nicholas Magnuson of the California Department of Fish and Wildlife.

General Info

Kerwin Estates to repair Araujo Reservoir No. 1 dam with excavation, cutoff trench, new concrete pipe, and soil reconstruction under state environmental exemption.

Agency

California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield

Place of Performance

Calistoga, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Office AddressN/A

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-NAP-30845-R3, pursuant to Section 1602 of the Fish and Game Code, to Kerwin Estates as represented by Helene Mingot. The Project is limited to Araujo Reservoir No. 1, a reservoir receiving inputs from three upstream ephemeral streams; and dam embankment and infrastructure repairs consisting of excavation and removal of the downstream portion of the existing dam embankment; excavation and establishment of a seepage barrier (cutoff trench) within the embankment; installation of internal drainage features to collect and convey seepage through and away from the dam; and reconstruction of the dam embankment with additional height to provide adequate freeboard. Estimated quantities of Project components include approximately 30,000 cubic yards (cy) of excavation, installation of about 800 cy of internal drainage materials (imported sand and gravel), and placement of approximately 41,000 cy of compacted soil embankment. Approximately 8,000 cy of earth embankment material will be hauled in from an offsite source and staged in an inactive vineyard field approximately 0.25 miles northwest of the dam. Transport of soil from the staging area to the Project Area will occur over existing vineyard access roads, with soil material intermittently stockpiled in the emptied reservoir basin. The existing embankment drain and outfall, and the existing outlet conduit will be removed and replaced. A new concrete drop outfall structure will be installed, entailing the removal of approximately 16 cy of concrete covering 430 square feet (sq. ft.). A 60-foot-long, 4-foot-wide, 3-foot-deep temporary trench will be excavated to construct a 30-inch diameter cast in place outfall pipe. Approximately 50 cy covering 500 sq. ft. of castin-place concrete will be used to construct the new outfall. At the northeast corner of the reservoir, the spillway discharge conduit outlet pipe will also be replaced, which discharges flow from the reservoir into an unnamed intermittent stream. This spillway discharge will tie into existing drainage infrastructure and will not impact the intermittent stream or riparian habitat. Existing rip rap will be removed and replaced to facilitate the spillway work outside of stream and riparian habitat. No rip rap or hardscape rock armoring will be placed in the reservoir or intermittent stream or riparian. To facilitate dewatering during construction, water will be transferred from Araujo Reservoir No. 1 to Araujo Reservoir No. 2, which is another operational irrigation storage facility on the property approximately 950 feet northwest of Araujo Reservoir 1. Water drained from Reservoir 1 will be conveyed to Reservoir 2 through the existing irrigation system. Project activities will result in approximately 301 square feet of permanent impacts to the reservoir from the construction of a new concrete conduit casing structure, and 45,816 square feet (1.05 acres) of temporary impacts to the reservoir from dewatering, equipment access, and earthen embankment material staging. The Project will also result in permanent impacts to 4,285 square feet (0.1 acres) of a seasonal wetland located near the base of the dam embankment; and permanent impacts to 14 square feet and 8 linear feet, and temporary impacts to 15 square feet, of an unnamed ephemeral stream immediately below the dam embankment due to drainage outfall and conduit improvements and access. No riparian trees will be removed by Project activities.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 21 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

1 day ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS