Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Vallejo Marina A Dock Removal - 2025, (Lake or Streambed Alteration Agreement No. EPIMS-SOL-55710-R3)

Forecast
EPIMS-SOL-55710-R3State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-SOL-55710-R3 with the City of Vallejo for the removal of the Vallejo Marina A Dock. Located on the Napa River in Napa and Solano Counties, the project requires the removal of approximately 13,110 square feet of deteriorated timber floating docks and 104 timber piles, each 14 inches in diameter. This action is necessary to comply with the conditions of BCDC permit no. 1986.001 and is conducted pursuant to Section 1602 of the Fish and Game Code. The project will be executed entirely from the water via barge to avoid the use of land-side staging areas. Contractors must use a vibratory hammer attachment or crane to extract piles to minimize siltation, with any unbreakable piles cut one foot below the mudline. The project will temporarily impact approximately 13,222 square feet of tidally influenced aquatic habitat, which will be monitored following the removal process to ensure proper recovery. The project is classified as exempt under California Code of Regulations title 14, section 15301, Class 1, as it involves minor alterations to existing structures. Key points of contact include Oscar Alcantar of the City of Vallejo and Nicholas Magnuson of the California Department of Fish and Wildlife.

General Info

City of Vallejo to remove 13K sq ft of docks and 104 piles from Napa River under state environmental exemption.

Agency

California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Office AddressN/A

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-SOL-55710-R3, pursuant to Section 1602 of the Fish and Game Code to City of Vallejo as represented by Oscar Alcantar. The Project is limited to the removal of approximately 13,110 square feet of deteriorated timber floating docks and approximately 104, 14-inch diameter timber piles occupying approximately 112 square feet that make up the Vallejo Marina A Dock. The removal of the A Dock is required by the Bay Conservation and Development Commission (BCDC) to comply with the conditions of BCDC permit no. 1986.001 and will not be applied to any other projects for the purposes of mitigation or restoration credit. The removal of the docks and piles will be performed from the water via barge. No land-side staging areas will be used. The piles will be removed with the aid of a vibratory hammer attachment wherever feasible and directly pulled out via crane to minimize siltation and avoid damaging the piles during removal. If a pile cannot be extracted or breaks during the removal process, the contractor will cut the pile one (1) foot below mudline. No piles will be installed in the Project area, and the vibratory hammer will only be used to loosen the piles for removal by vibrating them. The Project will result in temporary impacts to approximately 13,222 square feet of tidally influenced aquatic habitat which will then be allowed to recover. After dock and pile removal concludes, the site will be monitored to ensure recovery proceeds without inadvertent impacts or complications from Project activities. No additional area will be impacted or restored as part of the Project.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 21 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

1 day ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS