Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Lower Putah Creek and Tributaries, and Peterson Ranch Maintenance Project 2025-29 (Notification of Lake or Streambed Alteration, No. EPIMS-SOL-57335-R3

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has authorized the Solano County Water Agency to conduct routine maintenance activities along Lower Putah Creek, its tributaries, and Peterson Ranch from 2025 through 2029 under Lake and Streambed Alteration Agreement EPIMS-SOL-57335-R3. This authorization, issued pursuant to Section 1602 of the Fish and Game Code, permits periodic, recurring tasks essential to preserving water conveyance capacity, structural integrity of infrastructure, and ecological function. Authorized activities include sediment and debris removal, salmon spawning gravel augmentation, maintenance and repair of culverts, crossings, roads, trails, and water flow measurement devices, bank stabilization using biotechnical methods, invasive species control, and native plant revegetation. All work is limited to existing infrastructure and must comply with California Code of Regulations Title 14 Section 15301, which categorizes the project as a routine maintenance exemption under CEQA. The work will occur at specific locations including Putah Creek between Monticello Dam and the Toe Drain confluence, tributaries such as Thompson Canyon Creek and Dry Creek, and Peterson Ranch near Lindsey Slough, including Miller Canyon Creek and the Big Ditch. The agreement does not constitute a traditional federal contract and therefore contains no FAR clauses, pricing details, payment information, or evaluation criteria. Performance is not bound by a fixed schedule but is expected to occur on an as-needed basis within the five-year period. The Solano County Water Agency, represented by Max Stevenson, is responsible for execution, while the California Department of Fish and Wildlife provides oversight through Environmental Scientist Jordan Beaton and Environmental Program Manager Craig Weightman. Electronic submission through the EPIMS system was required for notification, and no additional attachments, packaging requirements, or cost-related data are included. The project is designed to sustain aquatic habitats, prevent erosion, and maintain infrastructure without expanding existing uses.

General Info

Solano County Water Agency may conduct routine maintenance along Lower Putah Creek and tributaries from 2025 to 2029 under state authorization.

Agency

California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

EPIMS-SOL-57335-R3 Lower Putah Creek Maintenance Project Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Office AddressN/A
Contacts
Jordan BeatonEnvironmental Scientist
Max StevensonPerson or Public Agency Carrying Out Project

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-SOL-57335-R3, pursuant to Section 1602 of the Fish and Game Code, to Solano County Water Agency as represented by Max Stevenson. This Project is limited to "routine maintenance activities," generally defined as periodic, recurring activities necessary to maintain the water transport capacity of stream channels, maintain structural and functional integrity of existing facilities (culverts, crossings, trails, etc.), bank stabilization for erosion prevention, stream flow monitoring and management, watercourse restoration, and habitat enhancement. Routine maintenance activities authorized under this Agreement include: salmon spawning gravel maintenance and augmentation; sediment removal; trash, vegetation, and debris removal; maintenance and repair of water and flow measurement devices; maintenance and repair of existing culverts, ford crossings, roads and trails; maintenance of existing bank protection; bank stabilization using biotechnical stabilization techniques; temporary access routes; invasive terrestrial and aquatic plant management; and native plant revegetation/restoration.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Town of Chelsea Accessibility Ramp RFP
Solicitation # 75037
The Town of Chelsea is seeking qualified contractors to remove and replace an accessibility ramp at Town Hall with a new structure that fully complies with current ADA standards while maintaining visual harmony with the building’s historic character. The preferred design enables direct access from the main sidewalk and requires detailed proposals specifying material choices such as composite or pressure-treated lumber, along with the style of posts and balusters. Contractors must evaluate the condition of existing foundations and footings, replacing any that are structurally inadequate, and are responsible for all field measurements, demolition, and proper disposal of the old ramp. Site preparation is essential, including modifying the ground as needed to ensure stable installation, and all work must be performed with care to protect adjacent buildings, landscaping, and utilities from damage during construction. Bids must be submitted by August 28, 2026, under solicitation number 75037, with all technical and compliance details clearly outlined in the proposal. The project is administered by the Vermont Department of Economic Development, and inquiries should be directed to Grants@chelseavt.us or 802-625-2023. While the solicitation is open to all eligible contractors, there is no set-aside designation, and the place of performance is in Chelsea, Vermont. Proposals will be evaluated based on adherence to accessibility requirements, design compatibility with the historic structure, thoroughness of the scope, and the quality of material and construction plans presented.
Department of Economic Development

POSTED

about 10 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237990
New
Columbia Canal Embankment Repair Services
Solicitation # columbia-canal-embankment-repair-services
The City of Columbia is seeking contractors for the repair of the Columbia Canal embankment in Richland County, South Carolina, under solicitation number CIPDR 4241. This effort is targeted at restoring and stabilizing critical infrastructure along the canal, with work to be performed at the designated site in Columbia. The solicitation is set aside exclusively for small business concerns, including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone firms, Veteran-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses, ensuring opportunities for historically underrepresented and certified small entities. The North American Industry Classification System code for this project is 237990, indicating it falls under other heavy and civil engineering construction. Interested parties must submit responses by August 26, 2026, with inquiries directed to Chandler Worley of Phillips Heavy, Inc., the designated point of contact. The project has been posted through the U.S. Small Business Administration’s contracting portal and is administered under the agency’s efforts to promote equitable access to federal and municipal construction opportunities. While specific technical requirements are not detailed here, contractors are expected to have proven experience in civil earthwork, erosion control, and embankment stabilization to meet the structural and safety demands of the canal infrastructure. Further details and application instructions are available via the provided public link.
Phillips Heavy, Inc

POSTED

about 10 hours ago

DEADLINE

in 18 days
View Details