10 Sylvan Ln Creek Bank Erosion Protection Project (Notification of Lake or Streambed Alteration, No. EPIMS-MAN-59504-R3

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 10 Sylvan Ln Creek Bank Erosion Protection Project, identified by notification number EPIMS-MAN-59504-R3, is a biotechnical repair initiative located in Ross, California, along Corte Madera Creek. Managed by the California Department of Fish and Wildlife and categorized under NAICS code 237990, the project aims to stabilize 155 feet of bank behind a single-family residence. The scope of work includes dewatering the site, utilizing a mid-sized excavator to create a temporary access ramp, excavating a keyway for buried rock, and installing one-ton and two-ton boulder riprap. To complete the biotechnical structure, the project will incorporate boulder-anchored logs, log rootwads, and the planting of live willow cuttings. The project requires the removal of seven riparian trees, including five California bay, one bigleaf maple, and one non-native ficus. Environmental impacts include 2,283 square feet of temporary impact from construction and staging, and 1,184 square feet of permanent impact from the planted riprap. Conversely, the project will provide 959 square feet of habitat enhancement through riparian plantings and the placement of large woody debris. This project is approved under a Notice of Exemption dated August 11, 2025, as it qualifies as small facility construction with minor modifications under California Code of Regulations title 14, section 15303, Class 3.

General Info

Biotechnical erosion control along 155 feet of creek with riprap, logs, willow cuttings, and tree removal for habitat enhancement.

Agency

California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Ross, CA

Set-Aside

NONE

Documents

(1)

EPIMS-MAN-59504-R3 Notice of Exemption for 10 Sylvan Ln Creek Bank Erosion Protection Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Office AddressN/A
Contacts
Jordan BeatonEnvironmental Scientist
David BaylorPerson or Public Agency Carrying Out Project

Full Description

Show more
The Project is limited to bank erosion protection involving biotechnical repairs. The Project will stabilize 155 feet of bank along Corte Madera Creek behind a single-family residence. The Project will dewater the work site. A mid-sized excavator will be used from the top of bank to create a temporary access ramp to a gravel bar at the toe of the bank, in the channel. The excavator will work along the length of the in-channel work area to excavate a keyway to install the buried rock, place two-ton and one-ton boulder RSP, and place boulder-anchored logs and log rootwads. Once the bank erosion protection has been installed, the Project will plant live willow (Salix sp.) cuttings within the RSP on the bank, creating a biotechnical bank erosion protection structure. The Project will remove seven riparian trees, including five California bay (Umbellularia californica) trees, one bigleaf maple (Acer macrophyllum) tree, and one non-native ficus (Ficus sp.) tree. The Project will result in a total of 2,283 square feet (140 linear feet) of temporary impacts associated with staging, access, and construction. The Project will result in 1,184 square feet (134 linear feet) of permanent impacts associated with planted RSP. The Project will result in a total of 959 square feet (134 linear feet) of habitat enhancement comprised of riparian plantings, buried live willow tree plantings, and placement of large woody debris.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 6 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 18 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS