Middle-Mile Broadband Network Hub Shelter No. 5

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Transportation, District 3 – Marysville/Sacramento, is advancing the construction of a single middle-mile broadband network hub shelter on State Route 3 between post miles 26.8 and 26.9 in Siskiyou County, near Fort Jones, to enhance broadband signal transmission and amplification across the region. This initiative is being executed in coordination with the California Department of Technology and is statutorily exempt from environmental review under Public Resources Code Section 21080.51, which applies to broadband infrastructure projects. The project requires submission of a certified exemption finding and a Notice of Exemption, both of which must be physically mailed to the Office of Planning and Research in Sacramento. No formal contract value, pricing details, or financial terms have been disclosed, indicating the current stage is a forecast with no solicitation issued. The primary point of contact is Dotrik Wilson, Branch Chief, reachable via phone and email, though his role as a formal contracting officer, representative, or technical coordinator has not been officially designated. Performance is expected to occur entirely at the designated site in Siskiyou County, with no specified delivery schedule, period of performance, or FOB terms outlined. There are no identified technical specifications, quality standards, inspection protocols, or acceptance criteria beyond the project's environmental exemption status, and no federal acquisition regulation clauses, certification requirements, socioeconomic criteria, or invoicing procedures have been included in the available documentation. The procurement is administrative in nature, relying on statutory exemption compliance rather than competitive bidding or detailed technical evaluation factors, and all submissions must be in hard copy form with no electronic submission option provided.

General Info

California DOT to build broadband hub on SR-3 in Siskiyou County under statutory environmental exemption.

Agency

California → Caltrans, District 3 - Marysville/Sacramento

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Fort Jones, CA

Set-Aside

NONE

Documents

(1)

02-4J001 Notice of Exemption for Broadband Network Hub Shelter No. 5

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 3 - Marysville/Sacramento
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 3 - Marysville/Sacramento
Office AddressN/A
Contacts
Dotrik WilsonBranch Chief

Full Description

Show more
The California Department of Transportation (Caltrans), in coordination with the California Department of Technology, proposes to construct one middle-mile broadband network hub shelter to provide transmission and amplification of broadband signals. Network hub shelter no. 5 is located on SR 3 between PM 26.8 and PM 26.9 in Siskiyou County.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details