Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Georgiana Slough Erosion Control and Habitat Enhancement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Georgiana Slough Erosion Control and Habitat Enhancement Project is a civil construction initiative led by the Brannan-Andrus Levee Maintenance District to address critical erosion and undercutting issues along the right bank of Georgiana Slough on Lower Andrus Island, California. The project involves the placement of quarry stone riprap at the levee toe to form a foundation for a berm bench extending along the entire length of the site, with additional work including material import and export, hauling operations, and phased construction activities such as mobilization and site preparation. Minor modifications made since the August 2024 approval of the Initial Study/Mitigated Negative Declaration now affect the sequencing of construction, the sourcing and handling of materials, and the compaction methodology for fill, which must achieve a minimum of 95% relative compaction in 4 to 6-inch layers using a sheepsfoot roller or equivalent, in accordance with ASTM D1557-91. The project is tied to air quality compliance under the Sacramento Metropolitan Air Quality Management District’s thresholds, with revised emissions modeling reflecting increased greenhouse gas emissions and diesel particulate matter due to additional hauling trips and equipment use, as documented in the attached Air Quality and Greenhouse Gas Technical Memorandum dated June 2025. Although the project is posted as a forecast with a solicitation number referencing an IS/MND addendum, no formal contract type, pricing structure, or procurement mechanism including CLINs or contract value is provided, and no bid solicitation details, evaluation factors, award basis, or contract administration data such as payment office, COR/COTR, or invoicing method are available. The performance location is identified as Isleton, California, with a posted date of August 22, 2025, and primary contact information is provided through the District Engineer, Emily Pappalardo, but no formal offeror certifications, size status, UEI/CAGE codes, or representation requirements are included. The effort is technically and environmentally focused, with contractual and procurement elements largely absent, suggesting this is a planning, reporting, and environmental compliance update rather than a formal solicitation or award document.

General Info

Riprap installation and erosion control on Georgiana Slough with revised material handling, compaction, and air quality compliance.

Agency

California → Brannan-Andrus Levee Maintenance District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Sacramento County, Right bank of Georgiana Slough 1/4 mile upstream of Mokelumne River, Isleton, CA, 95690

Set-Aside

NONE

Documents

(1)

Georgiana Slough IS Addendum 07222025

PDFaddendum

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Brannan-Andrus Levee Maintenance District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Brannan-Andrus Levee Maintenance District
Office AddressN/A
Contacts
Emily PappalardoDistrict Engineer

Interested Companies (1)

Show more
Brannan-Andrus Levee Maintenance District
Walnut Grove, CA

Full Description

Show more
An Initial Study / Mitigated Negative Declaration (IS/MND) was previously prepared for the Georgiana Slough Erosion Control and Habitat Enhancement Project (Proposed Project) to assess the construction of erosion control methods along the right bank levee of Georgiana Slough, on Lower Andrus Island, including the placement of quarry stone riprap (rock slope protection [RSP]) at the levee toe, which wouldserve as the foundation for a ha t bench to be constructed along the entire length of the Project Site. The Proposed Project would resolve upper slope erosion problems and a major lower slope undercutting issue along the right bank of the levee. Since the approval of the IS/MND by the Brannan-Andrus Levee Maintenance District (BALMD; Lead Agency) in August 2024, minor modifications have been made to the project description, including how construction activities are sequenced and how some materials are sourced, handled, placed, and compacted (Project Modifications). The Project Modifications also include additional material import and export, along with associated hauling trips required during construction.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
(Resolicitation) Reclamation Construction for Sowbelly Gulch Project
Solicitation # JH27-1-1
The State of Utah, through the Division of Purchasing and the Division of Oil, Gas and Mining, is soliciting bids for the Reclamation Construction Sowbelly Gulch Project in Carbon County, Utah, with a focus on closing one abandoned mine in Trash Canyon, maintaining four previously closed mine openings in Spring Canyon, and revegetating disturbed areas at abandoned coal mines. The project, identified by solicitation number JH27-1-1, has a response deadline of August 20, 2026, and all work must be completed by August 31, 2026, with possible extensions for weather-related delays. A mandatory site visit is required, with coordinates provided for the pre-bid meeting, and vendors must attend to be eligible. The contract will be awarded to the lowest responsible and responsive bidder based on the total bid price, considering both lump sum amounts and unit prices for all work items, with award contingent upon reasonableness and alignment with the owner’s interests. The estimated value is $45,000, though no official ceiling is specified. The contractor must furnish all labor, materials, and equipment meeting detailed specifications including mine closure methods such as block wall maintenance, native stone wall construction, backfilling, and concrete or urea silicate foam applications, all governed by General Technical Specifications and site-specific requirements under Section 0300. Payment terms include monthly progress submissions, with 5% of total contract cost withheld as retainage and an additional 40% withheld on mobilization until full completion and acceptance. Payment is strictly for work accepted by the owner, with final acceptance requiring complete operability of all systems. The contractor must provide a 100% performance bond and 100% payment bond, along with $1 million in combined single limit general and automobile liability insurance, and workers’ compensation coverage. Compliance with the Davis-Bacon Act, Build America Buy America Act, and Surface Mining Control and Reclamation Act is mandatory, including eligibility verification through the Applicant/Violator System. The contractor must also certify compliance with federal and state non-discrimination, anti-lobbying, anti-boycott, and E-verify requirements, and agree to indemnify the State of Utah. Liquidated damages of $781 per day apply for delays, and violations may lead to termination with ten days’ notice, or thirty days’ notice if federal funds are withheld. All documentation, including bid schedules, technical specifications, and attachments,
Utah

POSTED

about 19 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237990
New
SLED
DIRECTIONAL BORE AND EXCAVATION
Solicitation # 2026-10
Springville City Power is soliciting bids for directional bore and excavation services to be performed under a contract covering fiscal year 2027, with the agreement running from the date of award through June 30, 2027, and potentially extending for an additional year by mutual agreement. The scope of work includes trenching and directional boring services for utility installations, requiring the contractor to provide all necessary equipment, staff, and materials while adhering strictly to Springville City Public Works standards and the City Power Department’s technical specifications, including bore depths between five and seven feet unless otherwise approved. Contractors must complete projects with precision, restore all disturbed surfaces to their original condition, clean work sites nightly, obtain required permits, and submit as-built drawings to designated city email addresses. All work must comply with industry-standard safety practices and the specific requirements set by Springville City’s insurance carrier, with contractors held fully liable for any damages or injuries arising from their operations and obligated to indemnify the City and its representatives against all claims. The contract is capped at an estimated value of $50,000, with firm pricing submitted via Appendix A determining service costs for standardized items such as rigid elbows, couplers, trenching, backfilling, and directional boring with rock additives. Evaluation of proposals will be based on a weighted scoring system: 40 points for experience and qualifications, including demonstrated history with similar projects and team expertise; 40 points for cost reasonableness and overall value; 10 points for contractor references, which may be verified by City staff; and 10 points for adherence to additional contract conditions. The award will be made based on the best interest of the City, with the lowest bid explicitly not guaranteed selection, and timeliness of project completion considered critical. Proposers must submit a detailed Statement of Qualifications, a letter of introduction signed by an authorized representative, proof of insurance with primary coverage, names of the City as additional insured with waiver of subrogation, and evidence of bonding capability. Insurance requirements include worker’s compensation per Utah state law, $1 million commercial auto liability, $2 million per occurrence and $4 million aggregate commercial general liability including contractual coverage, and completed operations coverage maintained for six years post-completion. All responses must be uploaded electronically through the Euna Supplier Network by 2:15 p.m. MDT on August 26, 2026; no emailed, faxed, or hard-copy submissions will be accepted. Inquiries may be
Utah

POSTED

about 21 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237990
New
SLED
Xpress Bus Wash Rehabilitation
Solicitation # 27-001
The Georgia Transportation Efficiency Authority is soliciting Design-Build proposals to rehabilitate and modernize the bus wash operation at the Xpress South Operations maintenance facility located at 5250 Frontage Road, Forest Park, Georgia. The project requires a comprehensive design and construction effort to expand the existing facility, separate engine steam-cleaning from body washing by constructing a new bay, replace the current system with a commercial-grade water reclamation setup that maximizes runoff capture and recycling, and install new bus wash equipment, engine steam-cleaning systems, bus lift equipment capable of handling 78,000 pounds at 69 inches in under a minute and a half, and supporting civil, structural, mechanical, electrical, and architectural improvements. The entire scope must meet strict performance metrics including washing at least fifty buses per day with a cycle time under six minutes per bus, and adhering to ADA accessibility, fire life safety codes, NEMA and UL standards, Buy America requirements, and sustainability best practices. The contract mandates compliance with federal transit regulations under FTA Circular 4220.1F and 2 CFR § 200, Georgia DOT construction standards, and incorporates a full suite of federal, state, and contractual clauses related to Davis-Bacon wages, DBE participation, drug-free workplace, sexual harassment prevention, and environmental standards for clean air and water. Proposals are due by September 24, 2026, and must be submitted in physical form with five copies and a USB drive containing the full electronic proposal, all marked for the attention of Procurement Manager Charnele Dobbins. Offerors must complete seventeen mandatory certifications including E-Verify compliance, suspension and debarment status, lobbying and anti-boycott affirmations, sales and use tax compliance, and Buy America certification. The selection will be based on a 100-point evaluation weighting proposed lump sum price at 20%, proposed equipment at 20%, experience of the architect/engineer at 15%, design-builder references and capabilities at 10% each, key personnel qualifications at 20%, and project management plan at 5%. The contract includes a $200,000 construction contingency allowance but no set ceiling, with all other line items subject to bid pricing. The contractor must provide 100% performance and payment bonds from Treasury-listed sureties with an A- rating or better, carry comprehensive insurance including workers’ compensation, employers’ liability, and a 2
Georgia Transportation Efficiency Authority

POSTED

about 21 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
SLED
Skytop Lodge Sewage Treatment Plant Improvements Project – Contract : 2026-01- Project Number 005153.0436
Solicitation # Skytop Lodge, Inc., Monroe County
Skytop Lodge, Inc. is seeking bids for the Skytop Lodge Sewage Treatment Plant Improvements Project under Contract 2026-01, with a scheduled bid opening on Friday, September 18, 2026, at 10:00 AM local time via PennBid. The project involves significant upgrades to the existing sewage treatment facility, including the installation of an Influent Screening System, Equalization Tank, Chemical Feed System, two Clarifier Tanks, a Post Aeration Tank, and a UV Disinfection System, along with all associated work detailed in the Contract Documents. Bidding documents are exclusively available through the PennBid website, and all official updates, including addenda, will be posted there; bidders are solely responsible for obtaining current information from this source. A pre-bid conference is scheduled for August 25, 2026, at the site in Canadensis, PA, and while attendance is encouraged, it is not mandatory. All bids must include a bid security of at least 10% of the total bid amount in the form of a certified check or bid bond, and questions regarding the documents must be submitted exclusively through PennBid—telephone inquiries will not be accepted. Bidders are required to comply with state antibid-rigging laws and must submit a non-collusion affidavit with their bid. The project is subject to Act 141 of 2022, mandating the use of E-Verify for all employees performing work, and requires submission of a Public Works Employment Verification Form as a condition for award. The Pennsylvania Prevailing Wage Act applies due to the project’s estimated cost exceeding $25,000. Bids must remain irrevocable for 60 days after opening, extendable to 120 days if award is delayed by external approvals, bond sales, or grant awards. The project is partially funded by a grant from the Commonwealth Financing Authority, and bidders are assured equal opportunity without discrimination on the basis of gender, race, color, creed, sex, age, physical disability, or national origin, with the same protections extended to all workers involved in contract performance.
Monroe County

POSTED

about 22 hours ago

DEADLINE

in about 1 month
View Details