Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has issued Lake and Streambed Alteration Agreement EPIMS-SON-50608-R3 to the Sonoma Valley County Sanitation District to authorize permanent repairs to sanitary sewer pipelines crossing Kohler and Sonoma Creeks in Sonoma County. The work involves stabilizing pipeline crossings using rock slope protection, fabric-reinforced fill structures with biodegradable materials, log rootwad revetments, brush mattresses, and native vegetation, along with armor plating the Sonoma Creek crossing using large boulders. Mitigation efforts include revegetation with native plants and installation of aquatic habitat enhancements, particularly for the endangered California freshwater shrimp, whose habitat overlaps with 210 linear feet of the project’s 305 linear feet of temporary riparian impact. The project will result in a permanent impact of 20 linear feet and temporary impacts totaling 290 linear feet to open water and 305 linear feet to riparian habitat, with the removal of two riparian trees. Access and staging will utilize existing driveways and residential parking to limit new disturbances. Compliance with the California Endangered Species Act Incidental Take Permit 2081-2024-026-03 and the Mitigated Negative Declaration is required, with oversight and acceptance responsibilities shared between the Sonoma Valley County Sanitation District and the California Department of Fish and Wildlife, which serves as the lead regulatory agency. The project is not a traditional procurement contract but a regulatory authorization issued under Fish and Game Code Section 1602, with no identified pricing, contract type, or formal acquisition data. Point of contact for environmental compliance is James Hansen of CDFW, and Dave Cook of the Sonoma County Water Agency serves as the lead agency representative. No formal contract clauses, payment terms, invoicing procedures, packaging requirements, or evaluation factors are specified in the available documentation, as the instrument functions primarily as an environmental permit with attached mitigation and monitoring obligations rather than a commercial procurement instrument.

General Info

Authorization for permanent sewer repairs in creeks with habitat mitigation for endangered shrimp and native vegetation.

Agency

California → Sonoma County Water Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Determination EPIMS-SON-50608-R3

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sonoma County Water Agency
Contacts2 people available
OfficeN/A
Organization / Agency
California → Sonoma County Water Agency
Office AddressN/A
Contacts
James HansenEnvironmental Scientist
Dave CookLead Agency Contact

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-SON-50608-R3), pursuant to Fish and Game Code section 1602, to the project Applicant, Sonoma Valley County Sanitation District. The project is limited to permanent repairs along Kohler and Sonoma creeks to protect Sonoma Valley County Sanitation District (SVCSD) sanitary sewer pipelines that cross Kohler and Sonoma Creeks, using a combination of rock slope protection, fabric reinforced fill structures (FREFs) built with biodegradable fabrics, log rootwad revetments, brush mattresses, and native vegetation. In addition, the pipeline across Sonoma Creek will be armored in its current location with large boulders. The Project will also include revegetation with native plants and installation of habitat improvement elements for aquatic species in Sonoma Creek. In total, the project will result in approximately 20 linear feet (0.01 acres) of permanent impact and approximately 290 linear feet (0.35 acres) of temporary impact to open water habitat, as well as approximately 305 linear feet (0.09 acres) of temporary impact to riparian habitat. Of the 305 linear feet (0.09 acres), 210 linear feet (0.04 acres) includes California freshwater shrimp (Syncaris pacifica) habitat above the wetted potion of Sonoma Creek. The project will also result in the removal of two riparian trees. Access and staging will occur via an existing developed driveway and residential parking area.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Town of Chelsea Accessibility Ramp RFP
Solicitation # 75037
The Town of Chelsea is seeking qualified contractors to remove and replace an accessibility ramp at Town Hall with a new structure that fully complies with current ADA standards while maintaining visual harmony with the building’s historic character. The preferred design enables direct access from the main sidewalk and requires detailed proposals specifying material choices such as composite or pressure-treated lumber, along with the style of posts and balusters. Contractors must evaluate the condition of existing foundations and footings, replacing any that are structurally inadequate, and are responsible for all field measurements, demolition, and proper disposal of the old ramp. Site preparation is essential, including modifying the ground as needed to ensure stable installation, and all work must be performed with care to protect adjacent buildings, landscaping, and utilities from damage during construction. Bids must be submitted by August 28, 2026, under solicitation number 75037, with all technical and compliance details clearly outlined in the proposal. The project is administered by the Vermont Department of Economic Development, and inquiries should be directed to Grants@chelseavt.us or 802-625-2023. While the solicitation is open to all eligible contractors, there is no set-aside designation, and the place of performance is in Chelsea, Vermont. Proposals will be evaluated based on adherence to accessibility requirements, design compatibility with the historic structure, thoroughness of the scope, and the quality of material and construction plans presented.
Department of Economic Development

POSTED

about 10 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237990
New
Columbia Canal Embankment Repair Services
Solicitation # columbia-canal-embankment-repair-services
The City of Columbia is seeking contractors for the repair of the Columbia Canal embankment in Richland County, South Carolina, under solicitation number CIPDR 4241. This effort is targeted at restoring and stabilizing critical infrastructure along the canal, with work to be performed at the designated site in Columbia. The solicitation is set aside exclusively for small business concerns, including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone firms, Veteran-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses, ensuring opportunities for historically underrepresented and certified small entities. The North American Industry Classification System code for this project is 237990, indicating it falls under other heavy and civil engineering construction. Interested parties must submit responses by August 26, 2026, with inquiries directed to Chandler Worley of Phillips Heavy, Inc., the designated point of contact. The project has been posted through the U.S. Small Business Administration’s contracting portal and is administered under the agency’s efforts to promote equitable access to federal and municipal construction opportunities. While specific technical requirements are not detailed here, contractors are expected to have proven experience in civil earthwork, erosion control, and embankment stabilization to meet the structural and safety demands of the canal infrastructure. Further details and application instructions are available via the provided public link.
Phillips Heavy, Inc

POSTED

about 10 hours ago

DEADLINE

in 18 days
View Details