Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Ralston Afterbay Sediment Removal and Trash Rack Installation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Ralston Afterbay Sediment Removal and Trash Rack Installation Project addresses the accumulation of approximately 40,000 cubic yards of sediment in the Ralston Afterbay following the 2022 Mosquito Fire, which has compromised the safe operation of the Low Level Outlet at the Ralston Afterbay Dam and the water delivery to the Oxbow Powerhouse via the Ralston-Oxbow Tunnel Intake. The project involves mechanical dredging using a crane-deployed excavator on barges to remove the sediment, with dewatering occurring on-site before the material is transported by truck approximately ten miles to the EBRL Sediment Disposal Area. Concurrently, the existing steel trash rack at the Low Level Outlet will be replaced with a new structural trash rack designed to maintain functionality even under future sedimentation events. The work is being conducted on U.S. Forest Service lands in Placer County, California, near Foresthill, and is classified under CEQA categorical exemptions for minor alterations and routine maintenance, eliminating the need for a full environmental impact report. The Placer County Water Agency is the lead agency responsible for executing and overseeing the project, with Heather Trejo, Environmental Scientist, serving as the primary point of contact and Jon Boland, Associate Engineer, as the technical liaison. No contract value, pricing details, or formal solicitation number are provided, and the project appears to be administered under a special-notice procurement without standard FAR clauses, evaluation factors, or detailed contract administration provisions such as COR/COTR assignments, invoicing protocols, or payment office information. The absence of formal clause references, bid submission instructions, or socioeconomic requirements suggests a streamlined approach consistent with state-level exempt public works activities.

General Info

Dredge 40,000 cubic yards of sediment and install new trash rack at Ralston Afterbay Dam on U.S. Forest Service land.

Agency

California → Placer County Water Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Forest Road 23, located on U.S. Forest Service lands within the Tahoe National Forest, CA

Set-Aside

NONE

Documents

(1)

Ralston Afterbay Sediment Removal and Trash Rack Installation Project NOE

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Placer County Water Agency
Contacts1 person available
OfficeN/A
Organization / Agency
California → Placer County Water Agency
Office AddressN/A
Contacts
Heather TrejoEnvironmental Scientist

Full Description

Show more
In 2022, the Mosquito fire burned nearly all the surrounding forest around Ralston Afterbay, resulting in accumulation of sediment in front of the Ralston Afterbay Dam, as well as the Ralston-Oxbow Tunnel Intake. This sediment affects the safe operation of the Ralston Afterbay Dam low level outlet (LLO), and operation of Oxbow Powerhouse, which requires water delivery from the Ralston-Oxbow Tunnel Intake. The project includes physical removal (mechanical dredging) of approximately 40,000 cubic yards of accumulated sediment from Ralston Afterbay in the vicinity of the Ralston Afterbay Dam's Low Level Outlet and the Ralston-Oxbow Tunnel Intake structure. A crane would place 3-5 barges into the Ralston Afterbay and an excavator would be loaded onto one of the barges. Sediment would be placed on remaining barges to allow water to drain off. Removed sediment will be trucked off site to an approved receiving area (EBRL Sediment Disposal Area approximately IO miles away). Once sediment is removed, the existing steel trash rack will be replaced with a new structural trash rack on the Ralston Afterbay Dam LLO to allow required operation/cycling of the LLO, even with future sedimentation.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
(Resolicitation) Reclamation Construction for Sowbelly Gulch Project
Solicitation # JH27-1-1
The State of Utah, through the Division of Purchasing and the Division of Oil, Gas and Mining, is soliciting bids for the Reclamation Construction Sowbelly Gulch Project in Carbon County, Utah, with a focus on closing one abandoned mine in Trash Canyon, maintaining four previously closed mine openings in Spring Canyon, and revegetating disturbed areas at abandoned coal mines. The project, identified by solicitation number JH27-1-1, has a response deadline of August 20, 2026, and all work must be completed by August 31, 2026, with possible extensions for weather-related delays. A mandatory site visit is required, with coordinates provided for the pre-bid meeting, and vendors must attend to be eligible. The contract will be awarded to the lowest responsible and responsive bidder based on the total bid price, considering both lump sum amounts and unit prices for all work items, with award contingent upon reasonableness and alignment with the owner’s interests. The estimated value is $45,000, though no official ceiling is specified. The contractor must furnish all labor, materials, and equipment meeting detailed specifications including mine closure methods such as block wall maintenance, native stone wall construction, backfilling, and concrete or urea silicate foam applications, all governed by General Technical Specifications and site-specific requirements under Section 0300. Payment terms include monthly progress submissions, with 5% of total contract cost withheld as retainage and an additional 40% withheld on mobilization until full completion and acceptance. Payment is strictly for work accepted by the owner, with final acceptance requiring complete operability of all systems. The contractor must provide a 100% performance bond and 100% payment bond, along with $1 million in combined single limit general and automobile liability insurance, and workers’ compensation coverage. Compliance with the Davis-Bacon Act, Build America Buy America Act, and Surface Mining Control and Reclamation Act is mandatory, including eligibility verification through the Applicant/Violator System. The contractor must also certify compliance with federal and state non-discrimination, anti-lobbying, anti-boycott, and E-verify requirements, and agree to indemnify the State of Utah. Liquidated damages of $781 per day apply for delays, and violations may lead to termination with ten days’ notice, or thirty days’ notice if federal funds are withheld. All documentation, including bid schedules, technical specifications, and attachments,
Utah

POSTED

about 17 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237990
New
SLED
Xpress Bus Wash Rehabilitation
Solicitation # 27-001
The Georgia Transportation Efficiency Authority is soliciting Design-Build proposals to rehabilitate and modernize the bus wash operation at the Xpress South Operations maintenance facility located at 5250 Frontage Road, Forest Park, Georgia. The project requires a comprehensive design and construction effort to expand the existing facility, separate engine steam-cleaning from body washing by constructing a new bay, replace the current system with a commercial-grade water reclamation setup that maximizes runoff capture and recycling, and install new bus wash equipment, engine steam-cleaning systems, bus lift equipment capable of handling 78,000 pounds at 69 inches in under a minute and a half, and supporting civil, structural, mechanical, electrical, and architectural improvements. The entire scope must meet strict performance metrics including washing at least fifty buses per day with a cycle time under six minutes per bus, and adhering to ADA accessibility, fire life safety codes, NEMA and UL standards, Buy America requirements, and sustainability best practices. The contract mandates compliance with federal transit regulations under FTA Circular 4220.1F and 2 CFR § 200, Georgia DOT construction standards, and incorporates a full suite of federal, state, and contractual clauses related to Davis-Bacon wages, DBE participation, drug-free workplace, sexual harassment prevention, and environmental standards for clean air and water. Proposals are due by September 24, 2026, and must be submitted in physical form with five copies and a USB drive containing the full electronic proposal, all marked for the attention of Procurement Manager Charnele Dobbins. Offerors must complete seventeen mandatory certifications including E-Verify compliance, suspension and debarment status, lobbying and anti-boycott affirmations, sales and use tax compliance, and Buy America certification. The selection will be based on a 100-point evaluation weighting proposed lump sum price at 20%, proposed equipment at 20%, experience of the architect/engineer at 15%, design-builder references and capabilities at 10% each, key personnel qualifications at 20%, and project management plan at 5%. The contract includes a $200,000 construction contingency allowance but no set ceiling, with all other line items subject to bid pricing. The contractor must provide 100% performance and payment bonds from Treasury-listed sureties with an A- rating or better, carry comprehensive insurance including workers’ compensation, employers’ liability, and a 2
Georgia Transportation Efficiency Authority

POSTED

about 19 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
SLED
Skytop Lodge Sewage Treatment Plant Improvements Project – Contract : 2026-01- Project Number 005153.0436
Solicitation # Skytop Lodge, Inc., Monroe County
Skytop Lodge, Inc. is seeking bids for the Skytop Lodge Sewage Treatment Plant Improvements Project under Contract 2026-01, with a scheduled bid opening on Friday, September 18, 2026, at 10:00 AM local time via PennBid. The project involves significant upgrades to the existing sewage treatment facility, including the installation of an Influent Screening System, Equalization Tank, Chemical Feed System, two Clarifier Tanks, a Post Aeration Tank, and a UV Disinfection System, along with all associated work detailed in the Contract Documents. Bidding documents are exclusively available through the PennBid website, and all official updates, including addenda, will be posted there; bidders are solely responsible for obtaining current information from this source. A pre-bid conference is scheduled for August 25, 2026, at the site in Canadensis, PA, and while attendance is encouraged, it is not mandatory. All bids must include a bid security of at least 10% of the total bid amount in the form of a certified check or bid bond, and questions regarding the documents must be submitted exclusively through PennBid—telephone inquiries will not be accepted. Bidders are required to comply with state antibid-rigging laws and must submit a non-collusion affidavit with their bid. The project is subject to Act 141 of 2022, mandating the use of E-Verify for all employees performing work, and requires submission of a Public Works Employment Verification Form as a condition for award. The Pennsylvania Prevailing Wage Act applies due to the project’s estimated cost exceeding $25,000. Bids must remain irrevocable for 60 days after opening, extendable to 120 days if award is delayed by external approvals, bond sales, or grant awards. The project is partially funded by a grant from the Commonwealth Financing Authority, and bidders are assured equal opportunity without discrimination on the basis of gender, race, color, creed, sex, age, physical disability, or national origin, with the same protections extended to all workers involved in contract performance.
Monroe County

POSTED

about 20 hours ago

DEADLINE

in about 1 month
View Details