Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Award Notice opportunity from California was posted on August 22, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Laguna Creek Restoration and Flood Control Project

Awarded
EPIMS-CCA-49733-R3State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 21 hours ago

DEADLINE

N/A
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

1 day ago

DEADLINE

in 29 days

AI Contract Overview

Show more

The Laguna Creek Restoration and Flood Control Project, identified by Lake and Streambed Alteration Agreement EPIMS-CCA-49733-R3, is an environmental initiative executed by the California Department of Fish and Wildlife pursuant to Fish and Game Code section 1602. Led by the City of Moraga and applicant Deidre Castillo, the project focuses on restoring a reach of Laguna Creek in Contra Costa County to create a natural stream and enhance habitats for the California red-legged frog. The scope of work includes the removal of 243 linear feet of corrugated metal pipe to be replaced by an arch culvert, the demolition of a concrete spillway to be replaced with a natural material weir, and the relocation of an 18-inch sewer line. Additional project activities involve clearing approximately 2.60 acres of vegetation, removing 39 riparian trees, and constructing a low-flow channel and floodplain. Technical execution includes water diversion, excavation and grading for the new channel, the installation of boulders and planted rock slope protection, and the planting of native riparian trees. The project is located at coordinates Latitude 37.85219 and Longitude -122.12592 under Assessor's Parcel Number 255-190-010-9. A Notice of Determination dated July 25, 2025, confirms that the project will not have a significant environmental effect within the jurisdiction of the California Department of Fish and Wildlife, provided that specific mitigation measures are followed.

General Info

Restore Laguna Creek habitat for red-legged frog with natural culvert, weir, and replanting, regulated by CDFW and City of Moraga.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

forecast

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-CCA-49733-R3), pursuant to Fish and Game Code section 1602, the project Applicant, Deidre Castillo. The project proposes to restore the reach of Laguna Creek at the Project Location with a natural stream and habitat enhancements for California red-legged frog. To accomplish this, the project proposes to remove 243 linear feet of an existing corrugated metal pipe and install an arch culvert in its place, demolish an existing concrete spillway within the project area and replace it with a weir or similar structure composed of natural materials, relocate an 18-inch sewer line, and construct a low-flow channel and floodplain. Project activities are limited to clearing of approximately 2.60 acres of vegetation; removal of 39 riparian trees; diversion of water around the work area; excavation and removal of the existing culvert; excavation and removal of an existing sewer pipeline or filling of the pipeline with cement slurry to abandon it in place; installation of a sewer pipeline along a new alignment within the project site; demolition of the existing spillway and replacement with natural materials; excavation and grading to construct the new channel; installation of planted rock slope protection and boulders within the channel; installation of a new arch culvert; and on-site restoration, including installation of native riparian tree plantings.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS