Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

San Joaquin Field Division Liner Raise and Instrumentation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California Water Resources, Department of

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Twissleman Road, Lost Hills Road, Bakersfield, CA

Set-Aside

NONE

Documents

(1)

SJFD Liner Raise and Instrumentation Project MND Addendum No. 1

PDFaddendum

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
Contacts
Jesse DillonProgram Manager - California Aqueduct Subsidence Program

Full Description

Show more
The California Department of Water Resources (DWR) evaluated the potential environmental impacts of the San Joaquin Field Division (SJFD) Liner Raise and Instrumentation Project (Approved Project) in a Mitigated Negative Declaration (MND), certified in 2020 (Approved Project MND). The Approved Project included raising portions of the California Aqueduct (Aqueduct) concrete liner of Pools 24 and 25, on each side, for approximately 1.65 miles and installation of water level monitoring in Pools 22 and 25. Since the certification of the Approved MND, DWR, in addition to raising the concrete liner of Pools 24 and 25 and installation of water level monitoring in Pools 22 and 25, has expanded the length of the Approved Project from 1.65 miles to 12.6 miles (Revised Project). This expansion warrants preparation of an addendum to the Approved Project MND (Addendum) pursuant to the California Environmental Quality Act (CEQA) Section 15164. This Addendum, together with the 2020 Approved Project MND, will be used by DWR when considering approval of the Revised Project.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for a firm-fixed-price contract to perform maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The scope of work includes the dredging and ocean disposal of approximately 4,260 cubic yards of material, vegetation clearance, and stone rework for the revetted mole. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for HUBZone Small Businesses, who are eligible for a price evaluation preference. Bidders must submit physical sealed envelopes by the deadline, as electronic submissions are prohibited. Required documentation includes SF 1442, the CLIN schedule, representations and certifications, and a bid guarantee. The contractor must provide key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Performance will be measured through pre- and post-dredge multi-beam surveys conducted by a third-party surveyor, and the contract includes liquidated damages of 2,297 dollars per calendar day of delay. Compliance with the Davis-Bacon Act and strict environmental and safety standards is required throughout the execution of the work.
Healy Tibbitts Builders, Inc.

POSTED

about 3 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the Lake Pontchartrain and Vicinity (LPV) Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm fixed-price construction contract, identified by solicitation number W912P826BA009 and NAICS code 237990, has an estimated magnitude between $25 million and $100 million. The scope of work involves repairing existing foreshore protection and embankments across Reaches 1, 2, 3, and 4. Key activities include demolition, clearing and grubbing, excavation, placing embankment, installing separator geotextiles, placing graded stone, and turf establishment and maintenance. Bids are due by October 19, 2026, at 10:00 a.m., with a question cutoff of October 2, 2026. Award will be made as a whole to a single bidder based on unit prices, provided they are reasonable and balanced. The contractor must adhere to EM 385-1-1 safety standards and the Davis-Bacon Act for prevailing wages. Performance requirements include submitting a preliminary project schedule within 15 days and an initial schedule within 42 days of the Notice to Proceed. The contract includes liquidated damages of $4,295.00 per calendar day of delay and requires the use of approved testing laboratories for quality control. A project labor agreement is not required for this acquisition.
W07V Endist New Orleans

POSTED

about 7 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237990
New
Federal
Kalispel Tribe Dike Repair- Pend Oreille County, Washington
Solicitation # 12FPC326B0016
The USDA NRCS is soliciting proposals for the repair of the Kalispel Tribe Dike in Pend Oreille County, Washington, under solicitation 12FPC326B0016. This total small business set-aside project has an estimated magnitude between $250,000 and $500,000. The scope of work includes site dewatering, erosion control, excavating and stockpiling dike soil, and the removal and resetting of a 36-inch diameter dike culvert and anti-seep collars. If the existing culvert and collars are found to be unsalvageable, the contractor must install new replacements. Final restoration involves placing nonwoven geotextile and riprap around the culvert outlet, followed by backfilling and compacting the dike to specification. The period of performance is scheduled from October 12, 2026, to November 1, 2027. Bids are due by September 21, 2026, and must be submitted via email with all required signatures and a bid guarantee. Award will be made to the responsible bidder whose proposal is most advantageous to the government, based on price and previous experience with similar projects over the last five years. The project is subject to Davis-Bacon Act prevailing wage rates and requires compliance with NRCS construction and material specifications. All work is subject to government inspection, and the contractor must maintain a rigorous quality control system, submitting inspection records within one working day of completion.
Fpac Bus Cntr-Acq Division

POSTED

about 7 hours ago

DEADLINE

in about 2 hours
View Details
NAICS: 237990
New
SLED
Entrada Way Culvert Slip-out Bank Stabilization ProjectThe County of San Mateo Department of Public Works is implementing the Entrada Way Culvert Slip-out Bank Stabilization Project to repair progressive bank failure along La Honda Creek in the unincorporated community of La Honda, California. The project aims to protect critical infrastructure, including the Entrada Way roadway, stormwater systems, and utility poles, while improving water quality and enhancing riparian habitat. The scope of work involves a biotechnical approach featuring the construction of an engineered log structure cribwall along the lower bank and vegetated soil lifts on the upper slopes. Additional technical requirements include extending the existing culvert headwall by approximately 22 linear feet, realigning the creek thalweg to its original pre-erosional position, realigning a storm drain pipe, and performing minor roadway improvements and site revegetation. The project is subject to comprehensive environmental compliance under the California Environmental Quality Act, with a Mitigated Negative Declaration filed in June 2026. Key regulatory requirements include coordination with Caltrans for transportation permits and ADA compliance, as well as adherence to California Department of Fish and Wildlife regulations regarding the Native Plant Protection Act and Lake and Streambed Alteration. Specific operational mandates include the relocation of aquatic wildlife prior to dewatering, strict concrete washout protocols to prevent stream contamination, and the maintenance of bicycle and pedestrian access throughout construction. The project area encompasses approximately 2.0 acres and is managed by the Natural Resource Manager, Julie Casagrande.
California San Mateo County Department of Public Works

POSTED

about 12 hours ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS