Pleasure Cove Marina II Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The California Department of Fish and Wildlife approved the Pleasure Cove Marina II Project under Lake and Streambed Alteration Agreement EPIMS-NAP-56500-R3, authorizing Berryessa SMI dba Pleasure Cove Marina to construct a new marina facility on Lake Berryessa in Napa County. The project includes the installation of floating docks, a breakwater structure, covered boat slips, pedestrian gangways, and sanitary pump-out stations, occupying approximately 130,000 square feet of lake surface and permanently impacting 300 square feet of shoreline and 2,700 square feet of lake bottom. The floating structures are built with galvanized steel frames, polyethylene floats, and composite decking, anchored to the lakebed using 108 concrete dead-weight blocks, each with a five-foot-by-five-foot footprint and four embedded steel spikes for stabilization. A 400-foot ADA-compliant zigzag ramp connects the shore to the docks without requiring lakebed anchors. Construction will occur in an existing paved staging area of 30,000 square feet, with no temporary impacts to the lake. The project complies with Fish and Game Code Section 1602 and CEQA guidelines, including a Mitigated Negative Declaration. The Regional Water Quality Control Board, Region 5 – Sacramento, serves as the lead agency, with the California Department of Fish and Wildlife acting as the enforcing entity for mitigation and regulatory compliance. Jenna Yang is listed as the Lead Agency Contact and Nicholas Magnuson as the Environmental Scientist for oversight. No federal acquisition regulations, contract clauses, pricing data, evaluation criteria, or procurement terms are present, as this is a state environmental permit rather than a federal procurement contract. The agreement does not reference contractual payment terms, invoicing methods, contracting officer details, or offeror certifications such as UEI, CAGE codes, or small business status. The approval date was July 29, 2025, with the solicitation posted on August 25, 2025, but no formal period of performance, delivery schedule, or contract value has been specified. The project is subject to inspection and acceptance at the site by CDFW upon verification of compliance with approved environmental conditions, with no alternative delivery or performance terms outlined.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
