Pleasure Cove Marina II Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife approved the Pleasure Cove Marina II Project under Lake and Streambed Alteration Agreement EPIMS-NAP-56500-R3, authorizing Berryessa SMI dba Pleasure Cove Marina to construct a new marina facility on Lake Berryessa in Napa County. The project includes the installation of floating docks, a breakwater structure, covered boat slips, pedestrian gangways, and sanitary pump-out stations, occupying approximately 130,000 square feet of lake surface and permanently impacting 300 square feet of shoreline and 2,700 square feet of lake bottom. The floating structures are built with galvanized steel frames, polyethylene floats, and composite decking, anchored to the lakebed using 108 concrete dead-weight blocks, each with a five-foot-by-five-foot footprint and four embedded steel spikes for stabilization. A 400-foot ADA-compliant zigzag ramp connects the shore to the docks without requiring lakebed anchors. Construction will occur in an existing paved staging area of 30,000 square feet, with no temporary impacts to the lake. The project complies with Fish and Game Code Section 1602 and CEQA guidelines, including a Mitigated Negative Declaration. The Regional Water Quality Control Board, Region 5 – Sacramento, serves as the lead agency, with the California Department of Fish and Wildlife acting as the enforcing entity for mitigation and regulatory compliance. Jenna Yang is listed as the Lead Agency Contact and Nicholas Magnuson as the Environmental Scientist for oversight. No federal acquisition regulations, contract clauses, pricing data, evaluation criteria, or procurement terms are present, as this is a state environmental permit rather than a federal procurement contract. The agreement does not reference contractual payment terms, invoicing methods, contracting officer details, or offeror certifications such as UEI, CAGE codes, or small business status. The approval date was July 29, 2025, with the solicitation posted on August 25, 2025, but no formal period of performance, delivery schedule, or contract value has been specified. The project is subject to inspection and acceptance at the site by CDFW upon verification of compliance with approved environmental conditions, with no alternative delivery or performance terms outlined.

General Info

California approves Pleasure Cove Marina II construction on Lake Berryessa with floating docks, breakwater, and compliant ramp under state environmental permit.

Agency

California → Regional Water Quality Control Board, Region 5 - Sacramento

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

EPIMS-NAP-56500-R3 Notice of Determination for Pleasure Cove Marina II Addition Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 5 - Sacramento
Contacts2 people available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 5 - Sacramento
Office AddressN/A
Contacts
Nicholas MagnusonEnvironmental Scientist
Jenna YangLead Agency Contact

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-NAP-56500-R3), pursuant to Fish and Game Code section 1602, to the Project Applicant, Berryessa SMI dba Pleasure Cove Marina as represented by Amber Garcia. The Project is limited to adding a new marina to Lake Berryessa, including the installation of floating boat docks, floating breakwater structure, cover boat slips, anchors, pedestrian access ramps (i.e., gangways), and sanitary pump-out facilities. The floating dock and boat slip structures will be comprised of a galvanized steel frame with polyethylene floats and composite decking surface that will be accessible from the shore by a pedestrian ramp of consistent construction. The floating breakwater will be installed to dampen wakes and wind-generated waves. The pedestrian ramp will be approximately 400 feet in total length and will zig-zag down to the floating docks to maintain an accessible slope. The ramp will be secured in the ground at key points to maintain stability, but no anchors are required within the lakebed. In total, the floating docks and pedestrian access will occupy approximately 130,000 square feet (3 acres) of the lake surface. The floating docks and breakwater will be anchored to the lake bottom using dead-weight concrete anchors with an embedded U-shaped hook to connect to the floating marina via stainless steel cables. Construction requires 88 anchors for the floating dock and 20 more for the breakwater for a total of 108 anchors. The anchors will be lowered into place onto the lake bottom connected via a cable through the U-shaped hook to the floating structure. Each anchor has a five-foot-by-five-foot footprint, or about 25 square feet each. Four steel spikes will be embedded in each block to keep it from sliding down any submerged embankment. The Project will result in permanent impacts to the lake including 300 square feet of lake shoreline, 2,700 square feet (0.62 acres) of lake bottom, and 130,000 square feet (3 acres) of lake surface. No temporary impacts to the lake will occur. A designated construction staging area will be located within an existing paved area that is approximately 30,000 sf (0.7 acres).

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Town of Chelsea Accessibility Ramp RFP
Solicitation # 75037
The Town of Chelsea is seeking qualified contractors to remove and replace an accessibility ramp at Town Hall with a new structure that fully complies with current ADA standards while maintaining visual harmony with the building’s historic character. The preferred design enables direct access from the main sidewalk and requires detailed proposals specifying material choices such as composite or pressure-treated lumber, along with the style of posts and balusters. Contractors must evaluate the condition of existing foundations and footings, replacing any that are structurally inadequate, and are responsible for all field measurements, demolition, and proper disposal of the old ramp. Site preparation is essential, including modifying the ground as needed to ensure stable installation, and all work must be performed with care to protect adjacent buildings, landscaping, and utilities from damage during construction. Bids must be submitted by August 28, 2026, under solicitation number 75037, with all technical and compliance details clearly outlined in the proposal. The project is administered by the Vermont Department of Economic Development, and inquiries should be directed to Grants@chelseavt.us or 802-625-2023. While the solicitation is open to all eligible contractors, there is no set-aside designation, and the place of performance is in Chelsea, Vermont. Proposals will be evaluated based on adherence to accessibility requirements, design compatibility with the historic structure, thoroughness of the scope, and the quality of material and construction plans presented.
Department of Economic Development

POSTED

about 5 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237990
New
Columbia Canal Embankment Repair Services
Solicitation # columbia-canal-embankment-repair-services
The City of Columbia is seeking contractors for the repair of the Columbia Canal embankment in Richland County, South Carolina, under solicitation number CIPDR 4241. This effort is targeted at restoring and stabilizing critical infrastructure along the canal, with work to be performed at the designated site in Columbia. The solicitation is set aside exclusively for small business concerns, including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone firms, Veteran-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses, ensuring opportunities for historically underrepresented and certified small entities. The North American Industry Classification System code for this project is 237990, indicating it falls under other heavy and civil engineering construction. Interested parties must submit responses by August 26, 2026, with inquiries directed to Chandler Worley of Phillips Heavy, Inc., the designated point of contact. The project has been posted through the U.S. Small Business Administration’s contracting portal and is administered under the agency’s efforts to promote equitable access to federal and municipal construction opportunities. While specific technical requirements are not detailed here, contractors are expected to have proven experience in civil earthwork, erosion control, and embankment stabilization to meet the structural and safety demands of the canal infrastructure. Further details and application instructions are available via the provided public link.
Phillips Heavy, Inc

POSTED

about 5 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237990
New
SLED
AL ROLLINS PARK IMPROVEMENTS RFP
Solicitation # PE-75552-NONST-2026-000000067
The City of Dalton is soliciting proposals for the construction of improvements to Al Rollins Park located at 521 Threadmill Road, including grading of existing baseball fields for artificial turf installation, concrete curbing, storm drainage systems, renovations to the press box and restroom building, soil and erosion control measures, new fencing, and construction of a new PE batting building. The contractor must provide all materials and labor necessary to complete the project in accordance with the Contract Documents and coordinate closely with the City on the scheduling and phasing of work. While the contractor is responsible for site preparation and infrastructure, the artificial turf system—including the turf, infill, stone base, nailers, and field drainage—will be supplied and installed under a separate contract by another party. All interested bidders are required to attend a mandatory Pre-Proposal Meeting on August 25, 2026, at 10:00 A.M. at the project site, with late arrivals not permitted. Proposals must be submitted in sealed envelopes to the City Finance Department at 300 W. Waugh Street by 10:00 A.M. on September 8, 2026. The City reserves the right to request additional information or conduct interviews with proposers and may shortlist firms prior to award. Short-listed contractors will be notified by the close of business on September 9, 2026, and interviews or presentations will take place on September 14 and 15, 2026. Evaluation will consider qualifications, experience, compliance with requirements, and proposed approach to the work. The solicitation number is PE-75552-NONST-2026-000000067, and all information and documentation related to the bid can be accessed via the provided online link. The point of contact for inquiries is Kenneth Harless, reachable at 706-529-5895 or KHARLESS@KRHARCHITECTS.COM.
City of Dalton

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
MRL Carrollton Phase III Storage
Solicitation # W912P8-26-B-A080
The U.S. Army Corps of Engineers New Orleans District is preparing to issue an Invitation for Bids under solicitation number W912P8-26-B-A080 for the construction of a new pre-engineered metal storage building at the Carrollton Phase III facility in New Orleans, Louisiana. This procurement is designated as a Total Small Business Set-Aside under NAICS code 237990 with an estimated value between one and five million dollars. The work encompasses demolition, site clearance, excavation, backfill, utility relocations, construction of a reinforced concrete foundation and pavement, installation of the metal building, chain-link fencing with a gate, and all related incidental tasks necessary to complete a fully functional facility. The contract will be awarded on a Firm-Fixed-Price basis using commercial procedures, and all bids must be submitted in response to the formal solicitation expected to be posted on the System for Award Management website. Interested contractors must maintain an active SAM registration to be eligible for award, as paper copies of the solicitation will not be distributed and all documents, including amendments, will be available exclusively online through SAM. The solicitation is anticipated to be posted on or about the published date, with proposals due by September 21, 2026. Offerors are required to monitor the SAM website regularly for updates and changes. The primary point of contact for questions is Francesca DeBoer of the New Orleans District, with Christopher Nuccio listed as a secondary contact. No technical or contractual inquiries will be accepted or answered prior to the official issuance of the solicitation, and all information contained in this synopsis is subject to change.
W07V Endist New Orleans

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Design-Bid-Build, Dredging at JEBLC Fuel Pier and Anzio Beach Sandbar, and JEBFS Utah Beach Sandbar, Joint Expeditionary Base Little Creek - Fort Story, Virginia Beach, VA
Solicitation # N4008526B0008
This solicitation, designated N4008526B0008, seeks qualified contractors for a Design-Bid-Build dredging project at Joint Expeditionary Base Little Creek–Fort Story in Virginia Beach, Virginia, encompassing the Fuel Pier, Anzio Beach Sandbar, and Utah Beach Sandbar. The work includes dredging sediment using a standard clamshell bucket, transporting material via scow or barge, and depositing it in a near-shore area, as well as constructing Berm Areas #8, #9, and #10 through hydraulic unloading, dewatering, grading, debris and vegetation removal, offsite disposal, and vegetation planting for stabilization. The project is estimated to range between $10 million and $25 million in value and requires contractors to demonstrate experience completing dredging projects with a production rate of at least 2,500 cubic yards per day and handling approximately 200,000 cubic yards of sediment using conventional equipment. Offerors must submit detailed project data for three to five completed, similar projects within the last five years, with all experience limited to their own direct performance; subcontractor experience is not accepted except under specific exceptions. The procurement follows FAR Part 14 sealed bidding procedures and is unrestricted for full and open competition, though if subsequently set aside for small businesses, the contract will include the limitation on subcontracting clause requiring the small business to perform at least 15 percent of the contract cost using its own employees. All respondents must be registered in SAM, provide their UEI and CAGE code, confirm small business status if applicable, and submit bonding capacity information including surety name and maximum per-project and aggregate bonding limits. Proposals must be submitted electronically as a single PDF under 4MB to Angela Clifton at the designated Navy email address by the deadline of September 1, 2026 at 6:00 p.m. Eastern Time, with only registered contractors receiving notifications of amendments.
Navfacsyscom Mid-Atlantic

POSTED

about 9 hours ago

DEADLINE

in 25 days
View Details
NAICS: 237990
New
SLED
Fay Creek Culvert Debris RemovalIn early 2023, a severe storm caused the failure of a 15-foot-diameter culvert beneath Salmon Creek Road, leading to the collapse of the roadway and the deposition of debris—including the damaged culvert, concrete, asphalt, and woody material—into Fay Creek. This obstruction disrupted surface-water flow and blocked critical fish passage. Sonoma County responded by installing a temporary one-lane Bailey bridge to maintain road access, but the debris remains in the creek, impairing aquatic connectivity. To address this, Sonoma County plans to remove approximately 50 feet of the failed culvert and all associated debris from a 50- by 100-foot section of the creek, potentially including an unstable concrete abutment from a prior bridge structure. The removal effort will occur during the dry season using hand tools and heavy equipment staged on Salmon Creek Road, with a temporary access route constructed adjacent to the Bailey bridge to allow an excavator to reach the work zone without entering the wetted channel. No trees will be removed, and minimal vegetation will be cleared only as absolutely necessary for safe operations. The California Department of Fish and Wildlife will coordinate dewatering and fish relocation to protect aquatic life. After debris removal, the site will be graded to match surrounding topography and stabilized with native seed, biodegradable erosion-control fabric, and fiber rolls. All removed materials will be hauled off-site for recycling or proper disposal, and strict erosion and spill prevention controls will be enforced throughout the work to ensure environmental protection and full restoration of natural stream function and aquatic passage.
Sonoma County

POSTED

about 14 hours ago

DEADLINE

N/A