Pleasure Cove Marina II Project

Forecast
EPIMS-NAP-56500-R3State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS-NAP-56500-R3 with Berryessa SMI dba Pleasure Cove Marina for the Pleasure Cove Marina II Addition Project at Lake Berryessa. This project involves the installation of a new marina featuring floating boat docks, a floating breakwater structure, covered boat slips, sanitary pump-out facilities, and a 400-foot zig-zagging pedestrian access ramp. The structures will be constructed using galvanized steel frames with polyethylene floats and composite decking, secured to the lake bottom by 108 dead-weight concrete anchors with embedded U-shaped hooks and stainless steel cables. The project is located in Napa County near the Wragg Canyon section of Lake Berryessa. It will result in permanent impacts to 130,000 square feet of lake surface, 2,700 square feet of lake bottom, and 300 square feet of shoreline. A construction staging area of approximately 30,000 square feet will be utilized within an existing paved area. The California Department of Fish and Wildlife approved the project on July 29, 2025, determining that it would not have a significant environmental effect within its jurisdiction, based on a Mitigated Negative Declaration by the lead agency, the Regional Water Quality Control Board, Region 5.

General Info

California approves Pleasure Cove Marina II construction on Lake Berryessa with floating docks, breakwater, and compliant ramp under state environmental permit.

Agency

California → Regional Water Quality Control Board, Region 5 - Sacramento

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 5 - Sacramento
Contacts2 people available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 5 - Sacramento
Office AddressN/A

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-NAP-56500-R3), pursuant to Fish and Game Code section 1602, to the Project Applicant, Berryessa SMI dba Pleasure Cove Marina as represented by Amber Garcia. The Project is limited to adding a new marina to Lake Berryessa, including the installation of floating boat docks, floating breakwater structure, cover boat slips, anchors, pedestrian access ramps (i.e., gangways), and sanitary pump-out facilities. The floating dock and boat slip structures will be comprised of a galvanized steel frame with polyethylene floats and composite decking surface that will be accessible from the shore by a pedestrian ramp of consistent construction. The floating breakwater will be installed to dampen wakes and wind-generated waves. The pedestrian ramp will be approximately 400 feet in total length and will zig-zag down to the floating docks to maintain an accessible slope. The ramp will be secured in the ground at key points to maintain stability, but no anchors are required within the lakebed. In total, the floating docks and pedestrian access will occupy approximately 130,000 square feet (3 acres) of the lake surface. The floating docks and breakwater will be anchored to the lake bottom using dead-weight concrete anchors with an embedded U-shaped hook to connect to the floating marina via stainless steel cables. Construction requires 88 anchors for the floating dock and 20 more for the breakwater for a total of 108 anchors. The anchors will be lowered into place onto the lake bottom connected via a cable through the U-shaped hook to the floating structure. Each anchor has a five-foot-by-five-foot footprint, or about 25 square feet each. Four steel spikes will be embedded in each block to keep it from sliding down any submerged embankment. The Project will result in permanent impacts to the lake including 300 square feet of lake shoreline, 2,700 square feet (0.62 acres) of lake bottom, and 130,000 square feet (3 acres) of lake surface. No temporary impacts to the lake will occur. A designated construction staging area will be located within an existing paved area that is approximately 30,000 sf (0.7 acres).

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 21 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

about 24 hours ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement