Above Henderson Park Habitat Rehabilitation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Above Henderson Park Habitat Rehabilitation Project involves the restoration of the Merced River corridor near Snelling in Merced County, California, through the removal of approximately 74,200 cubic yards of earthen material and the placement of 33,400 cubic yards of sorted fill and 13,700 cubic yards of unsorted fill to recreate a mosaic of natural aquatic habitat features including riffles, pools, and gravel bars. The initiative is led by the State Water Resources Control Board as the lead agency with the Merced Irrigation District as the applicant, and has received regulatory approval under the California Environmental Quality Act through the certification of an Environmental Impact Report and associated mitigation measures. A critical component of the project is the execution of a six-year General Lease for Public Agency Use granted by the California State Lands Commission, which authorizes the use of sovereign land for habitat restoration activities through August 21, 2031. The project’s place of performance is clearly defined along specific assessor parcel numbers in the river corridor, and while environmental compliance and long-term land use authorization are firmly established, no formal procurement contract, solicitation number, evaluation factors, or federal acquisition clauses are present in the documentation. All administrative and approval actions are centered on state-level environmental oversight rather than federal contracting procedures, and no traditional contract elements such as payment instructions, invoicing methods, contracting officers, delivery schedules, FOB terms, or offeror representations are included. The project’s governance relies on CEQA compliance through monitoring and reporting protocols, with oversight responsibilities vested in the State Water Resources Control Board and the California State Lands Commission. Point of contact information is provided for agency staff, but there is no identification of a contracting officer representative or a defined performance start date. The project structure reflects a regulatory land use authorization and ecological restoration effort rather than a competitive federal acquisition, with all key approvals documented and archived through the state’s environmental review system, and no contractual terms or procurement mechanisms beyond the lease and approvals are present.

General Info

Habitat restoration via earthwork and lease on state land, approved under CEQA, led by State Water Board and State Lands Commission.

Agency

California → State Water Resources Control Board

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Determination for Above Henderson Park Habitat Rehabilitation Project A4995

PDFdetermination-and-findings

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → State Water Resources Control Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → State Water Resources Control Board
Office AddressN/A
Contacts
Christine DaySenior Environmental Scientist

Full Description

Show more
The Project involves the removal of approximately 74,200 cubic yards (CY) and fill of approximately 33,400 CY of sorted earthen material and 13,700 CY of unsorted earthen fill to create a mosaic of habitat units such as riffles, pools, and gravel bars. The State Lands Commission action is an approval of a 6-year General Lease – Public Agency Use through August 21, 2031.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 9 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 9 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
EXETER AVENUE SEWER REPLACEMENT PROJECT
Solicitation # 10021.37
The West Pittston Borough Neighborhood Accessibility Improvements Project is a municipal construction initiative in Luzerne County, Pennsylvania, focused on enhancing pedestrian access and safety through the installation of new sidewalks, handicapped ramps, and related infrastructure improvements along Ledgeview Drive and Damon Street. The project is funded in part by a Multimodal Transportation Fund Grant from the Commonwealth of Pennsylvania’s Commonwealth Financing Authority and is being procured through a sealed bid process administered via the PennBid electronic platform. Bids must be submitted online by 10:00 a.m. local time on July 16, 2026, and are to be priced on a unit price basis as specified in the online bid form, with award going to the lowest responsive and responsible bidder. The contract requires compliance with Pennsylvania prevailing wage rates and strict adherence to nondiscrimination policies covering race, gender, creed, color, sexual orientation, gender identity, religion, disability, national origin, and age, reflecting West Pittston Borough’s status as an Equal Opportunity/Affirmative Action Employer. Bidders must furnish bid security, a Performance Bond, and a Labor and Material Payment Bond, each in an amount equal to the contract value, with bonds remaining effective for one year after final payment is due or beyond the correction period, whichever is later. Insurance providers must maintain an A.M. Best rating of A-VII or better. Comprehensive contract documents, including the Agreement, General and Supplementary Conditions, Specifications, Drawings, Addenda, Wage Rate Requirements, and Additional State and Federal Requirements, are incorporated by reference and accessible through the Project Manual. Submission mandates include the Bidder Qualification Statement, Non-Collusion Affidavit under Pennsylvania Anti-Bid Rigging Act, Workmen’s Compensation Act affidavit, Employment Eligibility Verification (I-9), Public Works Employment Verification Form, and Nondiscrimination/Sexual Harassment Clause certification. Bidders must also certify they are not under federal or state suspension or debarment and provide resumes of key personnel, including the Safety Officer. The project includes related work such as traffic maintenance, removal of trees, pavement restoration, and installation of storm sewer components including manholes, inlet boxes, jacked pipes, and thermoplastic piping. Contract performance is governed by specific deadlines: substantial completion within 225 calendar days and final completion within 250 calendar days after notice to proceed, with liquidated damages applicable for delays. Payments are processed through Contractor Applications for Payment, subject to retainage based on work completed and stored
Luzerne County

POSTED

2 days ago

DEADLINE

in 25 days
View Details