Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife amended Lake and Streambed Alteration Agreement 1600-2020-0116-R3 to authorize additional maintenance activities within Reach 8 of Dry Creek, Sonoma County, under the authority of Fish and Game Code Section 1602. The project, titled Dry Creek Habitat Enhancement Project Miles 2–6, is being carried out by the Sonoma County Water Agency with oversight from CDFW to ensure compliance with state environmental regulations, including Title 14 of the California Code of Regulations Section 15096, which governs environmental review under CEQA. The amendment, approved July 8, 2025, expands the scope of previously authorized work to include further streambank stabilization and habitat improvements, with field activities concentrated along Dry Creek at coordinates 38.676273°N, 122.941684°W. CDFW serves as the responsible agency for environmental compliance and accepts final documentation through its regional office in Fairfield, while the Sonoma County Water Agency acts as the project applicant and executor. No federal contract clauses, pricing data, performance schedules, or procurement evaluation factors are included in the documentation, indicating this is a state-level environmental authorization rather than a federally funded or competitively awarded contract. The agreement does not contain contract value estimates, payment details, accounting codes, or invoicing instructions, and no federal acquisition regulations apply. Contact for administrative and environmental compliance matters is provided through James Hansen of CDFW and Yvette O’Keefe of the Sonoma County Water Agency. The submission deadline for related environmental materials was July 8, 2025, with physical delivery required to the Office of Planning and Research in Sacramento. There are no representations required from offerors regarding small business status, entity identifiers, or socioeconomic certifications, as this is not a federal procurement action. The agreement emphasizes regulatory adherence, mitigation implementation, and on-site inspection rather than contractual delivery terms, financial obligations, or formal acquisition procedures.

General Info

California authorizes additional Dry Creek habitat and streambank work by Sonoma County Water Agency under state environmental rules.

Agency

California → Sonoma County Water Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

1600-2020-0116-R3 NOD Amendment - Dry Creek Habitat Enhancement Project Phase 3

PDFdetermination-and-findings

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sonoma County Water Agency
Contacts2 people available
OfficeN/A
Organization / Agency
California → Sonoma County Water Agency
Office AddressN/A
Contacts
James HansenEnvironmental Scientist
Yvette O'KeefeLead Agency Contact

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has amended Lake and Streambed Alteration Agreement number 1600-2020-0116-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Sonoma County Water Agency. The project as amended includes additional maintenance activities within Reach 8.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations