Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on May 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Western Way Interim Improvements

Closed
C007089State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix and precast concrete. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Qualified bidders must possess a valid California Contractor license and provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must be certified by recognized agencies such as the SBA, MBDA, or CUCP prior to the bid opening. The deadline for responses is November 18, 2025, at 2:00 p.m., with invitations and instructions managed through the Building Connected system. Primary contact for this solicitation is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 20 days
NAICS: 237310
New
Federal
FA8501-27-RAPID-PAVE-OTA
Solicitation # FA8501-27-RAPID-PAVE-OTA
The Department of the Air Force, 78th Civil Engineer Group, is seeking industry solutions to restore, modernize, and sustain critical airfield infrastructure at Robins Air Force Base, Georgia. Executed under the Robins Agile Practices for Infrastructure Development (RAPID) framework and the statutory authority of 10 U.S.C. 2808a, this project utilizes a Build-Only Other Transaction Agreement (OTA) approach. The scope of work involves the repair and replacement of runway 3901 pavement and shoulders, the south runway overrun, Taxiway C (Facility 3931), and drainage and storm-drain disposal systems at Facility 8700. The estimated magnitude of construction for this effort is between 58 million and 108 million dollars, with a total contract period of performance of 1,120 calendar days after the Notice to Proceed. The government is utilizing a two-step, best-value selection process. Step one requires a Phase 1 Solution Brief, due by 3:00 PM EST on October 30, 2026, which must demonstrate at least five years of experience in comparable government runway or taxiway projects. Short-listed firms will advance to step two, consisting of interactive pitch presentations and the submission of a formal price proposal. Evaluation factors focus on past performance in restricted airfield environments, the qualifications of key personnel, technical understanding of the 100 percent government-furnished design, and financial bonding capacity. Special emphasis is placed on managing congested site logistics, mitigating environmental risks related to PFAS-impacted soil, and minimizing disruptions to active aircraft operations.
FA8501 Opl Contracting Afsc/pzio

POSTED

about 2 hours ago

DEADLINE

in 2 days
NAICS: 237310
New
SLED
Traffic Signal Maintenance Throughout The City Of Brea
Solicitation # 26-02
The City of Brea is soliciting proposals under solicitation number 26-02 for the comprehensive maintenance of traffic signal facilities throughout the city. The scope of work encompasses approximately 53 city-owned signalized intersections and five flashing beacon locations, including all associated controllers, cabinets, detection systems, battery backups, and fiber-optic networks. The selected contractor must provide all necessary labor, materials, and equipment, ensuring that all emergency and field responses are performed by or supervised by an IMSA certified Traffic Signal Technician. Key performance requirements include a 24-hour response time for routine service requests and the maintenance of specific spare hardware, including Econolite ASC/3 and Trafficware Scout controllers. The contract will be awarded based on best value rather than the lowest cost, with evaluation weighted across firm qualifications (30%), proposed team and organization (25%), the detailed work plan (25%), and the fee schedule (20%). Proposals must be submitted in hard copy and via flash drive to the City Service Yard by November 12, 2026. The agreement includes a one-year warranty on services and requires compliance with California Labor Code regarding workers' compensation and prevailing wages. Payment is structured on a net 30-day cycle following the receipt of undisputed invoices. Required submission documents include a noncollusion declaration, a declaration of eligibility to contract, and a detailed payment schedule.
CITY OF BREA

POSTED

about 2 hours ago

DEADLINE

in 15 days
NAICS: 237310
New
SLED
HSIP Cycle 11 Pedestrian Crossing Enhancements
Solicitation # 2026-IFB-CIV-0436
The City of Pasadena Department of Public Works is soliciting bids under solicitation number 2026-IFB-CIV-0436 for the HSIP Cycle 11 Pedestrian Crossing Enhancements project. The scope of work involves furnishing and installing rectangular rapid flashing beacons (RRFB) at two specific intersections: Green Street at Michigan Avenue and Green Street at Chester Avenue. Key deliverables include the installation of signal poles, flashing beacons, conduits, conductors, and pull boxes, as well as associated civil works such as curb ramp work, miscellaneous concrete, and traffic striping. The project must adhere to 2024 CalTrans Specifications for concrete testing and City of Pasadena Standard Plan S-414 for embedded federal yellow detectable warning surfaces. The contract will be awarded to the lowest responsive and responsible bidder based on the grand total of the bid. Bidders must submit their responses electronically via the City of Pasadena eProcurement Portal by 2:00 pm on November 19, 2026. Required documentation includes a 5 percent electronic surety bid bond, Form AA-1, Form AA-2 for labor exceeding 25,000 dollars, a DHS Disclosure Form, and a signed IRS Form W-9. Contractors must be registered with the California Department of Industrial Relations and comply with state prevailing wage laws and equal employment opportunity practices. Performance must begin within 15 calendar days of the Notice to Proceed, with a base bid completion timeline of 60 working days and a bid alternate timeline of 10 working days. The contractor is required to obtain a Pasadena business license and comply with federal-aid contract language, including form FHWA-1273. Invoicing is managed through the City's dedicated online submission website, with checks issued on Tuesdays and Thursdays. All work must be fully accessible in accordance with the California Building Code and Title 24 regulations.
Public Works Department, Engineering

POSTED

about 4 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The Western Way Interim Improvements project, solicited under C007089 by the Central Florida Tourism Oversight District, involves comprehensive roadway enhancements at Buena Vista Drive and Western Way, with additional work along the northbound approach of Hartzog Road in Florida. The scope includes milling existing asphalt to a depth of 1.5 inches and placing new 1.5-inch FC-12.5 asphalt, hydro blasting of bridge decks, removal of concrete traffic separators, installation and relocation of regulatory and themed wayfinding signs, relocation and installation of signal heads, new median turn lane signal pedestals with associated conduit and pull boxes, traffic control cabinet tie-ins, erosion control, and full site restoration. Final pavement marking and striping will be performed on Buena Vista Drive and Western Way, with localized striping changes on Hartzog Road. All construction activities must be carefully phased to maintain traffic circulation and ensure public safety through temporary lane closures and robust maintenance of traffic operations. The project is classified under NAICS code 55121710 and is open to vendors registered on the PlanetBids platform, which is the only authorized method for bid submission and question submission. A mandatory pre-bid meeting via Microsoft Teams on May 26, 2026, requires RSVP through PlanetBids. Bid preferences are applied in favor of local vendors, veteran small businesses, and opportunity zone businesses. Proposals must be submitted electronically by the deadline of June 18, 2026, and while bid documents are viewable without registration, full participation—including bidding—requires vendor registration on the platform. No contract value, period of performance, or formal inspection criteria are disclosed in the available documentation.

General Info

Road improvements at Western Way and Hartzog Road; includes milling, resurfacing, traffic device upgrades, and safety management.

Documents

1

Bid Announcement C007089 - Western Way Interim Improvements

PDF, High priority: read this firstrfb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCentral Florida Tourism Oversight District
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
The scope of work for the Western Way Interim Improvements includes but is not limited to:• maintenance of traffic• temporary traffic control• lane closures• milling and resurfacing of existing asphalt pavement• removal of existing concrete traffic separator• hydro blasting (bridge deck)• final pavement marking and striping• regulatory sign installation and relocation• removal and replacement of themed wayfinding signs• relocation of existing signal heads• installation of new signal heads• installation of new median turn lane signal pedestals and bases and associated conduit• pull boxes• traffic control cabinet tie-in work;• erosion control; and• site restorationLocation is at Buena Vista Drive and Western Way, with additional work along the northbound approach of Hartzog Road.The project consists of milling existing asphalt pavement to a depth of 1.5 inches and placing new 1.5-inch FC-12.5 including hydro blasting (bridge deck), and final striping on Buena Vista Drive and Western Way, along with localized striping modifications on Hartzog Road.Construction activities are phased to maintain existing traffic circulation and ensure public safety through temporary lane closures and MOT operations.

More opportunities from Central Florida Tourism Oversight District

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS