Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from California was posted on May 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Westlake Sluice Gates Replacement Project

Awarded
B26141324014State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 12 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualifications from Design Build Entities for the design and construction of eight new pickleball courts with lighting at Garden Grove Park. This project, estimated to cost between 1,000,000 and 1,200,000 dollars, includes all labor, materials, engineering, and construction services, including site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to California Public Contract Code Section 20164 and Garden Grove Municipal Code. While the contractor is responsible for most testing and inspections, the City will retain a third-party consultant specifically for soil compaction testing. The procurement follows a two-step process where the City will first shortlist the three highest-scoring firms based on experience, technical capabilities, safety records, and financial capacity. These shortlisted firms will then be invited to submit a proposal for final selection based on best value. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a Certification Form, a Firm Information Form, and a Surety Declaration Form confirming the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 13 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The Westlake Sluice Gates Replacement Project involves the replacement of one 36-inch and one 48-inch sluice gate within the Natomas Plan Area, along with all associated construction activities including pavement and concrete removal, excavation, plugging, dewatering, backfilling, and surface restoration. The contractor is responsible for providing all labor, materials, tools, and equipment required to complete the work in accordance with the project plans and specifications, ensuring proper connections to the existing drainage system. All work must be performed to meet the required standards and restore the site to its original condition or better. Bids for the project are subject to a 10 percent bid bond and must be submitted by the deadline of June 17, 2026, at 9:00 PM. The solicitation number is B26141324014, with a NAICS code of 237990, and the project is managed by the Utilities Department of the City of Sacramento under the State of California. The primary point of contact is Gabriel Aceves, reachable at [phone hidden] or [email hidden]. The project is posted on the PlanetBids portal with the UI link provided for vendor access and additional details.

General Info

Replace two sluice gates in Natomas with full construction and restoration, bid due June 17, 2026.

Contract Value

$258,965

Place of Performance

191 Vista Creek Circle Sacramento, CA, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Contract opportunity posted

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → DOU - Utilities Department of City of Sacramento
Contacts1 person available
OfficeCA, USA
Office AddressCA, USA
Contacts

Full Description

Show more
Scope: These Special Provisions cover in general, the construction of drainage facilities within the Natomas Plan Area. The work to be performed consists of replacing one 36” sluice gate and one 48” sluice gate and associated work that includes, but is not limited to pavement and concrete removal, excavation, plugging, dewatering, backfill, and surface restoration. The Contractor shall provide all labor, materials, tools and equipment, and shall perform all work necessary to complete the subject project in place and make all required connections to the existing drainage system as shown on the Plans and as specified herein.
Bid Bond: 10.00%

More opportunities from California → DOU - Utilities Department of City of Sacramento

Same awarding agency

NAICS: 541330
SLED
Electrical Studies for DOU Facilities
Solicitation # P26141363019
The City of Sacramento Department of Utilities is seeking a professional engineering firm to conduct comprehensive electrical studies for an initial 31 facilities, with a long-term goal of updating approximately 200 facilities over a five-year term. The scope of work includes Short Circuit, Load Flow, Equipment Evaluation, Coordination, and Protective Relaying Device Analysis, as well as Arc Flash Hazard Analysis and Mitigation Reports. Depending on the facility, the contractor will perform either a Full Electrical Study, which includes data collection and file creation, or a Five-Year Review Study using existing City-provided data. All analysis must be performed using the latest version of SKM Systems Analysis, Inc., Power Tools for Windows software, and final deliverables must be reviewed, stamped, and signed by a Registered Electrical Engineer in the state of California. The project has a proposed budget of 1,320,000 dollars and will be awarded based on best value, considering written proposals and potential interviews. Key requirements include the production and installation of machine-printed arc flash labels compliant with NFPA 70E and NEC standards, as well as the submission of a performance bond within ten days of the intent to award. Proposers must provide a detailed work plan and timeline, and those qualifying as Local Business Enterprises may receive a 5 percent preference. All final reports and electronic SKM files must be submitted via USB or shared drive following approval from the City Engineer.
Engineering Services

POSTED

14 days ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS