Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on May 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Wet Well Rehabilitation or Reuse Services

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238290
New
Centennial JCC Panic Hardware Services (Electrical Room Egress Doors)
Solicitation # Panic Hardware (Electrical Room Egress Doors)
Management & Training Corporation (MTC) is soliciting bids for the installation of commercial-grade panic hardware on electrical room egress doors at the Centennial Job Corps Center in Nampa, Idaho. The scope of work includes conducting site surveys to verify door dimensions and fire ratings, procuring Grade I heavy-duty panic bars, exterior trim, rim cylinders, strikes, and door closers, and performing installation and testing. All work must adhere to NEC 2023 Article 110.26(C)(3), NFPA 101 Life Safety Code, and ADA standards. To ensure fail-safe operation, contractors must perform at least 10 consecutive cycle tests on all installed hardware. This is a fee-for-service subcontracting opportunity open to small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities under NAICS code 238290. Bidders must be licensed in the State of Idaho and provide three references for similar projects. Required submission documents include a completed bid sheet with lump sum and individual deficiency pricing, a W-9, a self-certification form, and acceptance of terms and conditions. All bids must be submitted via email to Sandra Clore by December 1, 2026, at 3:00pm MST. The contract is subject to various federal regulations, including the Davis-Bacon Act for prevailing wage rates and fringe benefits, as well as FAR clauses regarding Buy American preferences and combating trafficking in persons. Contractors are required to comply with DOL records management, mandatory training, and privacy breach notification requirements. Payment will be issued upon the submission of invoices for materials and services that have been delivered and accepted by MTC. Final inspection and acceptance will occur at the MTC designated point of delivery.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 238290
New
SLED
Pauma Security Gate
Solicitation # 2026-27-06
Solicitation 2026-27-06 for the Valley Center Pauma Unified School District involves the fabrication and installation of automated, keypad-entry hinging steel security swing gates at entry and egress driveways in Valley Center, California. The project requires two powder-coated steel double swing gates, each 18 feet wide by 5 feet tall, and explicitly prohibits the use of chain link options. Key technical components include a mounted Knox switch with Fire Department filing, two entry remotes, gate hold timers, a mounted strobe detector for emergency vehicles, and a keypad similar to the Door King 1506-086. The contract value is capped at 1,000,000 dollars, and the award will be granted to the lowest responsive and responsible bidder. Eligible bidders must hold a California contractor's license C13 or C-61/D28 and comply with prevailing wage requirements and Department of Industrial Relations registration. The project mandates a payment bond for 100 percent of the total bid price and a DVBE participation goal of at least 3 percent. Required submissions include a comprehensive bid packet featuring non-collusion affidavits, Iran Contracting Act certification, and fingerprinting certifications. Performance must be coordinated with the Director of Maintenance and Operations, with work hours restricted to 7:00 am to 5:00 pm, Monday through Friday. Additionally, contractors must adhere to strict hazardous material standards and California Air Resources Board compliance, with the district maintaining the right to terminate the agreement upon 30 calendar days written notice.
Valley Center Pauma USD

POSTED

about 23 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The contract seeks qualified contractors to evaluate and rehabilitate existing wet well structures through the application of protective coatings, liners, or structural repairs to ensure compliance with current performance and durability standards. The work involves thorough assessment of deteriorated infrastructure and implementation of long-term solutions to extend service life and maintain operational integrity, with a focus on meeting regulatory and safety requirements for wastewater handling systems. All proposed methods must demonstrate technical feasibility and proven effectiveness in similar heavy-duty environments. This subcontract, issued under NAICS code 238290 by the Department of Defense through the agency FA8137 Afsc Pzioc, has a response deadline of May 15, 2026, at 6:00 PM and is targeted for performance at a site in Coffeyville, Oklahoma, ZIP code 73145. The solicitation is open to eligible subcontractors capable of delivering specialized civil infrastructure rehabilitation services, with specific emphasis on wet well systems subject to constant moisture, chemical exposure, and structural stress. Contractors must be prepared to adhere to federal procurement guidelines and provide documentation of prior experience with comparable industrial wastewater infrastructure projects.

General Info

Wet well rehabilitation contract for structural repairs and coatings in South Coffeyville, due May 15, 2026.

NAICS

238290 - Other Building Equipment Contractors

Place of Performance

S Coffeyville, OK, 73145, USA

Set-Aside

NONE

Documents

This scope was carved out of FA813726R0012.

The full solicitation package (23 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Tinker AFB MAC BOA - WWYK240176 - REPLACE INDUSTRIAL WASTE LIFT STATIONS 6N & 6S, B62501

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8137 Afsc Pzioc
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Evaluate and rehabilitate existing wet well structures using coatings, liners, or structural repairs to meet updated performance and durability standards.

More opportunities from Department Of Defense → FA8137 Afsc Pzioc

Same awarding agency

NAICS: 237310
Federal
WWYK100209-Repair Perimeter Dr and Industrial Blvd
Solicitation # FA813727R0003
Solicitation FA813727R0003 is a pre-solicitation for the full depth replacement of Perimeter Drive and specific sections of Industrial Boulevard at Tinker Air Force Base, Oklahoma. This opportunity is strictly set aside for SBA Certified Women-Owned Small Businesses (WOSB), with an estimated project value between 5 million and 10 million dollars. The scope of work includes providing all labor, materials, and equipment to remove and replace damaged or severely cracking concrete, as well as installing pavement markings. A mandatory site visit is scheduled for October 20, 2026, requiring an RSVP by October 16, 2026, and requests for information are due by October 27, 2026. The contract mandates strict adherence to quality and safety standards, including the Davis-Bacon Act, EM 385-1-1 safety requirements, and Foreign Object Debris awareness training for all personnel. Key personnel requirements include a Project Manager with 10 years of commercial construction experience and a Superintendent with at least five years of experience. Deliverables include a baseline construction schedule due within 10 calendar days of the Notice to Proceed, weekly inspection records, and final as-built drawings in both PDF and AutoCAD formats. The contractor is responsible for a comprehensive inspection process, including a contractor punch-out inspection and a pre-final inspection within five days of substantial completion.
Highway, Street, and Bridge Construction

POSTED

8 days ago

DEADLINE

in 1 day
View Details
NAICS: 238190
Federal
WWYK260004 - REPAIR STRUCTURAL INTEGRITY, B1134, POST 34 & NORTH WALL
Solicitation # FA813727R0001
Solicitation FA813727R0001 is a firm fixed price request for proposal for the repair of structural integrity at Building 1134, Post 34, and the North Wall at Tinker Air Force Base, Oklahoma. The project scope involves repairing or replacing eroded shear braces and the base of Post 34 to prevent potential failure. This opportunity is restricted exclusively to Tinker AFB MAC BOA holders, and attendance at the initial site visit on October 22, 2026, is mandatory for eligibility to propose. Interested prime contractors must RSVP by October 20, 2026, and provide an Entry Access List for any personnel requiring base access. The estimated magnitude of the construction is between $100,000 and $250,000, with a performance period of 195 calendar days from the notice to proceed. The acquisition will be awarded based on the Lowest Price Technically Acceptable (LPTA) process, where the award goes to the responsible offeror with a technically acceptable proposal and the lowest evaluated price. Technical evaluations will focus on capability and management, and any deficiency in a subfactor will render a proposal un-awardable. Proposals must be submitted in separate technical and price volumes, with pricing broken down by the CSI Master Format System. The contract is a total small business set-aside and is subject to the Davis-Bacon Act, Buy American Construction Materials requirements, and DFARS cybersecurity standards. Liquidated damages for delays are set at $227.75 per calendar day.
Other Foundation, Structure, and Building Exterior Contractors

POSTED

13 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS