Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Award Notice opportunity from California was posted on November 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Wiley Canyon Project

Awarded
MC20-238State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
South Operation Center (SOC) Digester Demolition
Solicitation # 26-114
Solicitation 26-114 is an Invitation For Bid issued by the City of Naperville for the South Operation Center (SOC) Digester Demolition. The project involves the demolition and removal of an abandoned digester located at 1800 S. Washington Street, including the filling of the excavation, site restoration, ancillary landscaping, and the installation of security fencing. The scope also requires the identification, handling, and legal off-site disposal of special waste, such as contaminated soil and construction debris, with specific requirements for the packaging and transportation of asbestos-containing materials. The contract will be awarded to the lowest responsible bidder based on criteria including technical capacity, integrity, past performance, and financial resources. The work must be completed by December 31, 2027, with construction operations limited to Monday through Friday from 7:00 a.m. to 4:00 p.m. A contingency allowance of $25,000 is provided for unforeseen work, while failure to achieve final completion is subject to liquidated damages of $250 per calendar day. The contractor is required to provide performance and payment bonds equal to the contract price and must comply with the State of Illinois Prevailing Wage Act and 2010 ADA Standards. Bids must be submitted electronically by December 11, 2026, and include a bid deposit equal to 10% of the total bid. All work must adhere to standards set by IDOT, the City of Naperville, ISPE, FHWA, AASHTO, ANSI, NEMA, and CFR 29 Part 1910.
Public Utilities (Water) | DPU-W

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 238910
New
Federal
Karup, Denmark DABS-FEV Laydown Site Construction
Solicitation # W912GB27RA010
The United States Army Corps of Engineers Europe District is seeking a Firm-Fixed-Price construction contract to establish a new laydown area at Karup Air Base in Denmark. This Design-Bid-Build project aims to support Base Expeditionary Airfield Resources for the beddown of 550 personnel using Deployable Air Base System sets, specifically the Alaska Small Shelter System. The scope of work includes the construction of a gravel bed covering approximately 30,957 square meters, concrete pads for various shelters, and necessary site improvements. The facility will accommodate 72 billet shelters, as well as specialized shelters for latrines, showers, laundry, a 550-person kitchen, command operations, and morale, welfare, and recreation. The project involves specific utility requirements, where domestic water and wastewater extensions will be handled by a host-nation-directed sole-source local contractor, while electrical power will be provided via DABS generator sets rather than a utility grid. The anticipated contract value is between $1 million and $5 million, with a construction duration of 365 calendar days starting around late September 2027. This is an unrestricted, full and open competitive procurement using a best-value approach, selecting the highest technically rated proposal that offers a fair and reasonable price. Interested offerors must be authorized to perform construction work in Denmark, maintain active SAM registration, and satisfy all bonding and permitting requirements.
W2SD Endist Europe

POSTED

about 7 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

The Wiley Canyon Project, identified as Master Case 20-238, is a mixed-use development located at 24924 Hawkbyrn Avenue in Santa Clarita, California. Approved by the City Council on November 25, 2025, the project follows Alternative 5, which consists of 232 two-story townhome or detached condominium units, a 140,000 square foot senior and assisted living facility with 120 units, and 9,000 square feet of commercial space. The development includes a total of 731 parking spaces divided among residential, commercial, and senior living uses, as well as grading activities, off-site infrastructure, and bank protection along Wiley Canyon Creek. The project is subject to the California Environmental Quality Act and is supported by a Final Environmental Impact Report completed in September 2025. Environmental compliance includes a Phase II Environmental Site Assessment that analyzed soil for pesticides and arsenic, and the project must adhere to Model Water Efficient Landscape Ordinance standards. The City of Santa Clarita is responsible for enforcing these standards through plan checks, irrigation audits, and inspections. Traffic analysis indicates that Alternative 5 generates 2,985 average daily trips, which is a reduction compared to the original project proposal.

General Info

Mixed-use development in Santa Clarita featuring 352 residential units and commercial space.

Place of Performance

24924 Hawkbryn Avenue, Santa Clarita, CA, Santa Clarita, CA, 91321

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

forecast

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Santa Clarita
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Erika IversonSenior Planner
Tom ClarkProject Applicant

Full Description

Show more
The City Council adopted Alternative 5 to the proposed project. This alternative includes 232 townhome and/or detached condominium residential units. The townhome/condominium units would be two-story in height. Under Alternative 5, the senior facility/assisted living facility would be 140,000 square feet in size (120 assisted living units). The commercial component would total 9,000 square feet. A total of 601 parking spaces would be provided for residential uses, 64 spaces for commercial use, and 66 spaces for senior living parking. Under this alternative, grading activities, bank protection along Wiley Canyon Creek, and off-site infrastructure would all remain the same as the proposed project.

More opportunities from California → City of Santa Clarita

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS