Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Transportation was posted on July 31, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor

Closed
6923G225Q000011Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was initiated following a sprinkler system failure that caused significant water damage. The scope of work requires the remediation of the entire building, including cleaning visible mold and algae from concrete floors, CMU walls, and vinyl tiles, as well as the removal and replacement of affected drywall, gypsum wallboard, and acoustical tile ceiling finishes. Additionally, the contractor must perform dehumidification to maintain humidity levels at or below 50 percent and clean or replace damaged theater seating cushions. All work must adhere to EPA guidelines and the ANSI/IICRC S520 Standard for Professional Mold Remediation. The project requires the provision of a Certified Industrial Hygienist to verify materials and perform final clearance walkthroughs. Contractors must submit a single lump sum bid on company letterhead, including a detailed cost breakdown, a timeline for substantial completion, and proof of a valid Indiana Contractor's License. Evaluation is based on best value, with price weighted at 60 percent, quality at 20 percent, past performance at 10 percent, and schedule at 10 percent. Mandatory requirements include compliance with the Davis-Bacon Act wage determinations, specific automobile and workers compensation insurance limits, and the submission of a sequenced construction schedule within 10 days of the Notice to Proceed. Work must commence within 14 days of the Notice to Proceed, and payment is issued on Net 30 terms.
Atterbury Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in 17 days
NAICS: 562910
New
Maui JCC Mold Remediation and Removal of Water-Damaged Materials
Solicitation # maui-jcc-mold-remediation-removal-water-damaged-materials
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum contract to perform mold remediation and removal of water-damaged materials at the Maui Job Corps Center in Makawao, Hawaii. The project focuses on Building 11, specifically the cafeteria, food service areas, and restrooms, which sustained significant water intrusion during a windstorm on August 15, 2026. The scope of work includes the removal of mold-affected porous materials such as drywall and ceiling tiles, the establishment of containment with HEPA-filtered negative air pressure, and the remediation of structural surfaces. The estimated contract value ranges from $25,000 to $100,000, with a required performance period of 30 consecutive business days following the Notice to Proceed. Bids will be evaluated based on overall best value. To be considered, bidders must conduct a mandatory physical site visit and submit a comprehensive proposal including a lump-sum bid, a detailed cost breakout, three comparable references, and proof of insurance. For bids of $25,000 or more, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. The contract is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Awardees must comply with Davis-Bacon Act minimum wage rates, EPA guidance for mold remediation, and various Federal Acquisition Regulation clauses, including first-tier subcontractor reporting for awards over $40,000. Payment is based on an approved Schedule of Values via AIA documents, with a 10% retainage withheld until substantial completion.
Management & Training Corporation/Hawaii/Maui Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in about 23 hours
NAICS: 562910
New
SLED
Methane Seep Program
Solicitation # RFP-EFAA-2027000075
The Colorado Energy Office is soliciting proposals for the Methane Seep Program under RFP-EFAA-2027000075, with a maximum budget of 600,000 dollars. The project focuses on methane mitigation work, including the commissioning of systems and equipment and the development of a public-facing case study to demonstrate replicability. The anticipated period of performance begins around January 8, 2027, and concludes by September 30, 2029, with all mitigation work required to be completed by August 2029. The award will be based on a total value evaluation method, considering the most advantageous proposal based on technical feasibility, demonstrated experience, and cost reasonableness. Proposals must be submitted online by 5:00 PM Mountain Time on November 20, 2026, and must not exceed 10 pages, excluding specific attachments such as company profiles and resumes. Key requirements include compliance with federal standards such as the Build America-Buy America, Davis-Bacon and Related Acts, and the National Environmental Policy Act, as well as adherence to Climate Pollution Reduction Grant reporting. Offerors must provide certifications regarding conflicts of interest, accessibility requirements, and AI governance. Special consideration is given to Service Disabled Veteran Owned Small Businesses certified by the U.S. Small Business Administration and based in Colorado. All inquiries must be directed via email to Tara Larwick by October 23, 2026.
Governor - Colorado Energy Office

POSTED

about 19 hours ago

DEADLINE

in 29 days

General Info

Contract Value

$37,532

NAICS

562910 - Remediation Services

Place of Performance

Kings Point, NY, 11024, USA

Set-Aside

SBA

Award Issued Date

Documents

7

6923G225Q000011 Wiley Hall Lead Paint Abatement Q&A

PDF, High priority: read this firstq-and-a
High

Amendment 0001 to Solicitation E6923G2250000011

PDF, High priority: read this firstamendment
High

RFQ 6923G225Q000011 - Wiley Hall Lead Abatement

PDF, High priority: read this firstrfq
High

Solicitation 6923G225Q000011 Amendment 0002

PDF, High priority: read this first2 pages · amendment
High

Solicitation 6923G225Q000011 Amendment 0003

PDF, High priority: read this first5 pages · amendment
High

Solicitation 6923G225Q000011 - Wiley Hall Lead Abatement

PDF, High priority: read this first2 pages · rfq
High

SOW - Wiley Hall Dean & Reception Offices Lead Abatement

PDF, High priority: read this first9 pages · sow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Combined Synopsis

Deadline changed

Response deadline changed from Jul 29, 2025 to Jul 31, 2025.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Jul 31, 2025 to Aug 6, 2025. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6923G2 DOT Maritime Administration
Contacts2 people available
OfficeKINGS POINT, NY, 11024, USA
Office AddressKINGS POINT, NY, 11024, USA

Full Description

Show more
The purpose of this modification is to respond request for information as well as extend the date and time of offer due as follows: a. Offers submission due date is hereby extended to August 6th, 2025 @0900. b. Response to request for information posted on attachment A contractor shall provide a New York and/or Environmental Protection Agency (EPA) qualified and licensed lead abatement specialist to provide all management, tools, supplies, notification(s), equipment and labor necessary to perform lead abatement at Wiley Halls Dean, Reception Offices, Deans Bathroom and Hall #4 in accordance with all federal, state and local laws and regulations. See SOW for additional details. Statement of Work (SOW) Wiley Hall 2?? Deck Dean & Reception Offices Lead Paint Abatement / Remediation 1. Description of Services A contractor shall provide a New York and/or Environmental Protection Agency (EPA) qualified and licensed lead abatement specialist to provide all management, tools, supplies, notification(s), equipment and labor necessary to perform lead abatement at Wiley Hall's Dean, Reception Offices, Dean's Bathroom and Hall #4 in accordance with all federal, state and local laws and regulations. 2. General Requirements a. Abatement and disposal shall be in accordance with all federal, state and local laws and regulations including but not limited to requirements established by 40 CFR Part 745, EPA (Renovation, Repair, and Painting (RRP) Rule), D.O.T. (49 C.F.R. - 173), and RCRA. b. The contractor shall possess and provide current proof of all federal, state and local trainings, license(s) and certification(s) including but not limited to the RRP, be registered with the EPA and be licensed as a lead abatement contractor through either New York and/or EPA. c. The contractor shall submit a - Occupant Protection Plan to the Contracting Officer Representative (COR), Public Safety Department, and Department of Public Works (DPW). d. The designated work area(s) must be sealed from neighboring occupied areas of the Quarter/academy with the appropriate barriers (i.e., plastic) and hazard notifications (warning signs) per federal, state and local laws and regulations throughout the duration of the project until final clearance has been achieved. e. All work must be completed using wet methods per federal, state and local laws and regulations. f. Apply a lead encapsulation paint or primer, over all surfaces to be painted, in accordance with manufacturer's instructions. The contractor shall use an EPA approved lead encapsulant and provide SDS for all products used throughout the project. g. Given the sensitive nature of these areas (occupied resident), USMMA is requiring all work to be done in a negative pressure enclosure to minimize impact to building occupants and operations. h. All work must be completed using HEPA vacuum with a minimum filter requirement capable of capturing particulates of 0.3 microns with 99.97% efficiency and in conjunction with all federal, state and local laws and regulations. i. Throughout the duration of the abatement/remediation project, the work area(s) must be contained until a formal lead clearance is completed. USMMA's contracted hygienist shall be on-site to conduct oversight of the lead abatement process, perform air monitoring, and the final lead clearance. The clearance levels for dust wipes per the EPA's Hazard Standards and Clearance Levels for Lead in Paint, Dust and Soil requirements are as followed: a. 10 ug/ft2 - floors b. 100 ug/ft2 - window sills and troughs j. All work and clearances must be coordinated with the USMMA's MARAD, COR, Public Safety Department, DPW and contracted IH. If clearance levels are not achieved in accordance with federal, state and local laws and regulations, the contractor shall perform an environmental re-cleaning and undergo another lead clearance process at no additional cost incurred to the government. If required, this process will be repeated until acceptable levels are achieved in accordance with all federal, state and local laws and regulations. k. The work area must be cordoned off per federal and state laws and regulations with clearly visible barriers (i.e., caution tape) where only authorized and trained individuals related to the abatement project may enter. l. Establish a containment area in accordance with federal and state laws and regulations, to fully separate the work area from other areas of the building. Maintain and identify emergency exit(s) from the work area or establish alternate exit(s) compliant with all federal, state and local laws and regulations. m. The contractor will ensure academy occupants are protected at all times and prevent any potential lead and/or lead dust contamination in accordance with all federal, state and local laws and regulations. n. All electrical equipment shall be run through Ground Fault Interrupt Circuit (GFCI) throughout the course of the project. o. The contractor shall be responsible for installation and connection of all temporary utilities required to complete the abatement. The contractor shall ensure all electrical equipment run through Ground Fault Interrupt Circuit (GFCI) throughout the duration of the project. DPW personnel will show the contractor where to connect to water and power. The contractor shall provide and install temporary GFCI panels for electrical service. p. The contractor shall secure infrastructure equipment (i.e., HVAC system) and all other relevant equipment to prevent contamination in neighboring areas per federal, state and local laws and regulations. q. Provide accurate and complete waste manifest(s) for lead disposal in accordance with all federal, state and local laws and regulations. r. Provide copies of all federal, state and local notifications. s. Provide accurate records of abatement completion. 3. Additional Notes a. Start Date: To be determined (Upon USMMA Contracting Officer's (CO) award of contract). Completion Date: 4 days after award of contract. The completion date includes but is not limited to the submittal process, performance of the work, final air clearance, inspection, waste disposal and waste manifest delivery. b. A full work plan must be prepared in advance and submitted to the COR, Public Safety, DPW, and contracted IH for approval. The plan must be approved at least two (2) business days prior to commencement of work. c. All work must be scheduled with the COR at least 48 hours prior to commencement. d. The academy must be immediately notified of any service and/or activity interruptions. Any potential unforeseen interruptions or issues must be immediately related to the COR, Public Safety Department, and DPW. e. A pre-bid onsite walkthrough with the DPW, COR, and Public Safety Department will be conducted to identify and mark the proposed area where removal / abatement will take place. The contractor will become familiar with on-sight conditions and restrictions. The square footage identified in the SOW are approximations and will need to be assessed and verified by the contractor during the walkthrough and incorporated into the bid submission. The contractor is responsible for verifying quantities and locations where all work is to be performed. Failure to do so shall not relieve the contractor of its obligation to furnish all labor and materials necessary to perform the work. f. All work including but not limited to on-site assessment(s) and document review(s), must be completed between normal business hours of operation (7am - 4pm), Monday - Friday, unless additional approval is granted by the CO and COR. g. Any debris generated during abatement activities will be removed by the contractor daily from the affected area(s) and academy premises. Area(s) will be left neat and clean daily and after work is completed, suitable for all normal academy activities. 3 h. Contractor must properly dispose of waste in accordance with all RCRA requirements. Documentation of this disposal shall be provided to the COR and Public Safety. i. The contractor will be required to abate (remove) the paint materials from the indicated areas. If the paint cannot be removed while still leaving a clean, smooth and paintable surface, the contractor will be required to remove building material (i.e. wood pieces) in its entirety for the selected areas and replace with similar material that meet all regulatory and industry standards. j. Square Footage of removal areas include: - Dean's Office (207): ~ 399 SF - Reception's Office (206): ~ 378 SF - Dean's Bathroom (207A): ~76 SF - Hall #4 (208B): ~25 SF These areas will be outlined at the time of the on-site walkthrough. Abatement shall occur to include removal of the selected areas and outlining materials (i.e., paint or marker). k. The contractor shall assume full responsibility and liability for compliance with all applicable federal, state and local regulations related to any and all aspects of the project. l. The contractor is responsible for ensuring client satisfaction throughout the duration of the project. Any discrepancies, issues and concerns identified by the client originating from the contractor will be addressed, documented and corrected in a timely manner. Note: The contractor is responsible for any subcontractors that may be used throughout this project. Subcontractors are required to adhere to all the requirements set forth within this SOW. 4 4. Images of Area of Concern Dean's Office (207): ~ 399 SF Reception's Office (206): ~ 378 SF Dean's Bathroom (207A): ~76 SF Hall #4 (208B): ~25 PLEASE SEE ATTACHED SITE PICTURES

More opportunities from Department Of Transportation → 6923G2 DOT Maritime Administration

Same awarding agency

NAICS: 339950
New
Federal
USMMA - Scoreboard Replacement RFI
Solicitation # MMAPR520726000151
The United States Merchant Marine Academy (USMMA) has issued a Request for Information (RFI) under solicitation number MMAPR520726000151 to identify qualified firms capable of providing a turn-key solution for the replacement of the scoreboard at Tomb Field in Kings Point, New York. The scope of work includes the removal of the existing scoreboard, modification of the support structure, and the design, procurement, and installation of a new stadium-sized LED scoreboard. This comprehensive installation must include a control system, scoring and timing system, audio system, and instant replay system. All work must comply with the National Electrical Code, NCAA and NFHS timing requirements, and the Secretary of the Interior’s Standards for the Treatment of Historic Properties. Key deliverables include project engineering design drawings stamped by a New York licensed Professional Engineer, a minimum five-year manufacturer warranty, and a one-year installation warranty. The government requires a dedicated Project Manager with at least 10 years of experience in LED scoreboard installation. Technical requirements are stringent, including a 48-hour system burn-in period and a maximum defect rate of 0.0001% for pixels. Interested parties must submit a vendor capabilities statement of no more than five pages and a completed market research questionnaire to the primary point of contact by 10:00 AM ET on October 23, 2026. This RFI is for market research purposes only and does not constitute a formal solicitation or a binding contract.
Sign Manufacturing

POSTED

7 days ago

DEADLINE

in about 13 hours
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS