Willow and Valley Warehouse Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Willow and Valley Warehouses Project, managed by the City of Rialto Development Services Department, involves the demolition of an existing structure and the construction of two new industrial warehouses on a 6.02-acre site at the northeast corner of Willow Avenue and Valley Boulevard. The total construction area is approximately 119,700 square feet. Building 1, located on the northern portion of the site, consists of 66,810 square feet of warehouse space, 2,400 square feet of mezzanine, and 4,000 square feet of office space. Building 2, located on the southern portion, includes 43,558 square feet of warehouse space, 1,200 square feet of mezzanine, and 2,000 square feet of office space. The project was approved on June 9, 2026, and is associated with several regulatory filings, including Master Case No. 2022-0034 and various General Plan and Specific Plan amendments. A Mitigated Negative Declaration was prepared in accordance with CEQA to ensure no significant environmental effects, with mitigation measures established as conditions for approval. Administrative oversight is led by Senior Planner Daniel Rosas, and the project is identified by State Clearinghouse Number 2026020456. The project site is further identified by Assessor's Parcel Numbers 0132-182-08, 0132-182-09, and 0132-202-04.

General Info

Demolition and construction of two industrial warehouses totaling 119,700 sq ft in Rialto, California, pending final approvals.

Place of Performance

Northeast comer of Willow Avenue and Valley Boulevard, Rialto, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Rialto
Contacts2 people available
OfficeN/A
Organization / AgencyCalifornia → City of Rialto
Office AddressN/A
Contacts
Daniel RosasSenior Planner
Brian BargemanExecutive Vice President

Full Description

Show more
Full Title: Willow and Valley Warehouses Project (Related Files: Master Case No. 2022-0034, General Plan Amendment No. 2022-0001, Specific Plan Amendment No. 2022-0002, Conditional Development Permit No. 2022-0019, Precise Plan of Design No. 2022-0031, Environmental Assessment Review No. 2022-0033) The Project would demolish an existing structure on site and construct 2 new industrial warehouses totaling approximately 119,700 square feet. Building 1, on the northern portion of the project site, would be composed of approximately 66,810 square feet of warehouse, 2,400 square feet of mezzanine, and 4,000 square feet of office. Building 2, on the southern portion of the project site, would be composed of approximately 43,558 square feet of warehouse, 1,200 square feet of mezzanine, and 2,000 square feet of office.

Similar Contracts

Same NAICS industry code

NAICS: 236210
New
Federal
F-15EX 8-Bay Maintenance Hangar Complex-Industry Day
Solicitation # W50S8527H1CU0
The National Guard Bureau is seeking market intelligence and industry capability assessments for the construction of an F-15EX 8-Bay Maintenance Hangar Complex at Selfridge Air National Guard Base in Harrison Township, Michigan. This project, estimated between 150 million and 200 million dollars, involves the creation of an environmentally safe and energy-efficient complex to support 21 Primary Aircraft Authorization F-15 EX aircraft. The scope includes the demolition of buildings 3, 5, 117, and 120, the construction of new parking, and necessary utility and infrastructure upgrades. The facility will be developed in three phases: Hangar 1 for corrosion control and fuel cell maintenance, Hangar 2 as a 4-bay maintenance hangar, and Hangar 6 for munitions and training. The government is considering a fixed-price Other Transaction Agreement under 10 U.S.C. section 2808a, with funding potentially phased at approximately one-third of the total cost per fiscal year. Design completion is anticipated for early 2027. All construction must adhere to DoD, Air Force, and base design standards, including strict antiterrorism, force protection, and flood plain requirements. Interested firms must provide information regarding their bonding capacity, experience with mission-critical operational facilities, and potential labor constraints. An Industry Day is scheduled for December 8, 2026, at the Selfridge Air National Guard Base Dining Facility, with registration required for up to three participants per company.
W7NF Uspfo Activity Miang 127

POSTED

6 days ago

DEADLINE

in 21 days
View Details

More opportunities from California → City of Rialto

Same awarding agency

NAICS: 541620
SLED
Locust Gateway Development Project
Solicitation # EAR2023-0051
The Locust Gateway Development Project, managed by the City of Rialto, involves the construction of a large-scale industrial warehouse facility on approximately 40 acres of land located at the southwest corner of Locust Avenue and Lowell Street in Rialto, California. The development, spearheaded by Brookfield Properties, features a 664,859-square-foot warehouse complemented by roughly 7,713 square feet of ancillary office space. Key infrastructure includes a fence-secured dock area with 82 dock doors, 398 trailer parking stalls, and 365 vehicle parking stalls, which include 8 ADA-compliant spaces. Site access is designed through three new driveways on Lowell Street, one on Locust Avenue, and an emergency-only driveway on Lake Padden Lane. The project has undergone extensive environmental review under the California Environmental Quality Act (CEQA), resulting in a Draft Environmental Impact Report and a subsequent Notice of Determination. While mitigation measures are in place to address impacts related to air quality, biological resources, cultural resources, noise, and transportation, greenhouse gas emissions were identified as a significant and unavoidable impact. Technical assessments have addressed various site-specific concerns, including geotechnical stability, water supply sufficiency for a 20-year period, stormwater management through a Preliminary Water Quality Management Plan, and potential paleontological and cultural resource sensitivities. Additionally, environmental due diligence included Phase I and Phase II Environmental Site Assessments to evaluate historical military and industrial contamination risks, such as perchlorates and volatile organic compounds.
Environmental Consulting Services

POSTED

10 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS