Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

City of Rialto Pacific Electric Trail

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Rialto is undertaking the construction of a 1.75-mile extension of the Pacific Electric Trail along the former Union Pacific Railroad right-of-way in San Bernardino County, funded by the San Bernardino County Transportation Authority. The trail will extend from Cactus Avenue to Pepper Avenue, providing a 10-foot-wide Class I paved concrete shared-use path with two-foot graded shoulders, a trailhead and parking lot at Cactus Avenue, signalized crossings at Cactus and Riverside Avenues, widened curb ramps, and standardized trail signage for two-way traffic. The project aligns with the SBCTA Non-Motorized Transportation Plan and incorporates environmental compliance under CEQA, NPDES MS4 Permit regulations, and Section 106 of the National Historic Preservation Act, including coordination for the restoration of the historic Rialto Depot. Environmental sampling and analysis were conducted by Converse Consultants and Jones Environmental, adhering to EPA methods for soil and water contaminants, with strict chain-of-custody protocols and sample preservation at or below 6°C. Inspection and acceptance are managed by the City of Rialto Public Works Department, with field activities occurring along the corridor from North Lilac Avenue to North Pepper Avenue. Construction is scheduled to begin in September 2025 with grading and excavation phases extending through November 2025. The project design complies with Caltrans Active Transportation Program guidelines, and all laboratory analyses follow established quality control criteria including spike recovery, percent recovery, and relative percent difference thresholds. Despite extensive technical documentation detailing environmental compliance, field operations, and sample handling, the contract lacks formal FAR clauses, defined contract type, pricing structure, award evaluation criteria, or explicit payment and invoicing procedures. No solicitation number, contract value, or official signing date is provided, nor are there identified contracting officers, representatives, or socioeconomic certifications. Primary point of contact is Art Cervantes, Engineering Manager, reachable via email and phone for administrative inquiries.

General Info

City of Rialto to build 1.75-mile paved trail from Cactus to Pepper Avenues, starting September 2025.

Agency

California → City of Rialto

NAICS

541380 - Testing Laboratories and ServicesView NAICS

Place of Performance

Rialto Avenue and Foothill Avenue, extending from Cactus Avenue to Pepper Avenue, Rialto, CA, 92376

Set-Aside

NONE

Documents

(8)

Notice of Intent to Adopt Mitigated Negative Declaration for Pacific Electric Trail Project

PDFspecial-notice

Summary Form for Document Submittal - Pacific Electric Trail Project

PDFenvironmental-summary

Rialto Pacific Electric Trail Project Initial Study-Mitigated Negative Declaration

PDFinitial-study

Notice of Completion - Rialto Pacific Electric Trail Project

PDFnotice-of-completion

Rialto Pacific Electric Trail Final Mitigated Negative Declaration SCH No. 2025100109

PDFmitigated-negative-declaration

Pacific Electric Trail Project Initial Study and Mitigated Negative Declaration Appendices

PDFinitial-study-mnd-appendices

CPUC Comment on City of Rialto Pacific Electric Trail MND

PDFcomment

Rialto Pacific Electric Trail Notice of Determination

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Rialto
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Rialto
Office AddressN/A
Contacts
Art CervantesEngineering Manager

Interested Companies (1)

Show more
Sapphos Environmental
Pasadena, CA

Full Description

Show more
The City of Rialto (City) proposes construction of a Pacific Electric (PE) Trail (proposed trail or proposed project) along the former Union Pacific Railroad (UPRR) track Right-of-Way (ROW) in San Bernardino County, with funding from the San Bernardino County Transportation Authority (SBCTA).

Similar Contracts

Same NAICS industry code

NAICS: 541380
New
Federal
Inspection, Testing & Quality Assurance ServicesThe contract requires comprehensive inspection, testing, and quality assurance services for aerospace engine components, specifically focusing on first article inspection, non-destructive testing, and material verification, all executed in strict compliance with the AS9102 standard and MQR-PSD-1 requirements. These activities are critical to ensuring dimensional accuracy, material integrity, and conformance to aerospace-grade specifications, with full documentation and quality reporting mandated to support traceability and regulatory compliance throughout the production lifecycle. The work is designated as a subcontract under the NAICS code 541380, indicating specialized scientific and technical consulting services, and is issued by the Department of Defense through its Ok DLA Aviation office in Oklahoma City. The solicitation opens on July 31, 2026, with a firm deadline for responses on August 8, 2026, at 4:59 a.m. Eastern Time, allowing interested parties a limited window to submit proposals. The place of performance and contact details are not specified, suggesting the work may be performed at the vendor’s facility or designated aerospace production sites, subject to further coordination with the contracting office. The absence of a set-aside classification indicates the opportunity is open to all eligible subcontractors without preference for small businesses or other categories, emphasizing technical capability and adherence to aerospace quality standards as the primary evaluation criteria.
Ok DLA Aviation At Oklahoma City

POSTED

1 day ago

DEADLINE

in 7 days
View Details