Conditional Use Permit No. 25-04 (Rex Solaire Solar and Storage Project)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Kings County Community Development Agency is progressing with Conditional Use Permit No. 25-04 for the Rex Solaire Solar and Storage Project, a utility-scale photovoltaic and battery energy storage facility planned across approximately 20,600 acres in Kings County, California, near Interstate 5 and Utica Avenue. The project includes up to 2,800 megawatts alternating current of solar PV generation with tracking arrays, coupled with an 11.2 gigawatt-hour battery storage system, along with substations, underground collection systems, and a gen-tie line connecting to PG&E transmission switchyards. Additional infrastructure comprises telecommunications facilities and an operations and maintenance center. The permitting process is under the California Environmental Quality Act, with public review periods and environmental impact assessments guiding approvals. The site is characterized by geotechnical conditions evaluated through extensive soil sampling and laboratory testing per ASTM standards, including liquid and plastic limits, moisture content, dry density, specific gravity, pH, and California Bearing Ratio to ensure foundation stability and mitigate risks like liquefaction and erosion during construction and operation. The project is led by Rex Solaire Solar and Storage, LLC, with direct oversight from the Kings County Community Development Agency, represented by Planner III Noelle Tomlinson, alongside environmental planning consultants Rincon Consultants and developer Terra-Gen. While the solicitation is classified as a forecast and lacks formal federal contract elements such as FAR clauses, pricing, payment terms, or award evaluation criteria, the permitting process requires adherence to specific environmental and safety protocols. These include erosion control measures, hazardous materials management, perimeter fencing, surveillance systems, and controlled access, all tied to regulatory compliance rather than contractual obligations. Inspections and acceptance occur at the project site with responsibility shared between the developer and the county agency. Submission pathways and public engagement are facilitated via email, virtual meetings, and state clearinghouse channels, with no UEI, CAGE code, or socioeconomic certifications disclosed for the applicant. The timeline reflects public scoping and comment periods extending into mid-2026, with no defined contract start or end date, nor any identified financial value or invoicing mechanism—indicating this remains a regulatory permitting action rather than a federally awarded contract.

General Info

Rex Solaire proposes 2,800 MW solar and 11.2 GWh storage on 20,600 acres in Kings County, CA, under CEQA permitting.

Agency

California → Kings County

NAICS

541380 - Testing Laboratories and ServicesView NAICS

Place of Performance

Utica Ave & Interstate 5, CA, 93239

Set-Aside

NONE

Documents

(9)

CDFW Comment Letter on Rex Solaire Solar and Storage Project NOP

PDFcomment-letter

Conditional Use Permit No. 25-04 Rex Solaire Solar and Storage Project

PDFnotice-of-completion

Rex Solaire Solar and Storage Project Initial Study June 2026

PDFinitial-study

Notice of Preparation for Conditional Use Permit 25-04 Rex Solaire Solar Project

PDFnotice-of-preparation

Revised Notice of Preparation for CUP 25-04 Rex Solaire Solar Project

PDFpresolicitation

Rex Solaire Solar and Storage Project Initial Study November 2025

PDFinitial-study

2025111031 NAHC Comment on Rex Solaire Solar Storage Project

PDFcomment

Comment Letter on Initial Study and NOP for Rex Solaire Solar Project

PDFcomment

CUP 25-04 Notice of Completion for Rex Solaire Solar and Storage Project

PDFnotice-of-completion

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Amendment 1

Contract was updated

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Kings County
Contacts3 people available
OfficeN/A
Organization / Agency
California → Kings County
Office AddressN/A
Contacts
Noelle TomlinsonPlanner III
Shauna CalleryDirector of Environmental Planning

Interested Companies (1)

Show more
Rincon Consultants
Los Angeles, CA

Full Description

Show more
The Kings County Community Development Agency has received an application for a land development permit that proposes to construct, operate, and ultimately decommission a utility-scale photovoltaic (PV) solar power generation and energy storage facility on approximately 18,381 acres. The Project consists of tracking solar PV panel arrays with a nominal output of up to 2,800 megawatts (MW) alternating current (AC) at the point of interconnection and battery energy storage with a capacity of up to 11,200 gigawatt-hours (GWh). Other Project components include Project substations, an underground collection system, and a gen-tie line that would connect the Project substations to up to two switchyards located adjacent to the Pacific Gas and Electric (PG&E) transmission corridor. The Project would also include telecommunication facilities and an operations and maintenance facility.

Similar Contracts

Same NAICS industry code

NAICS: 541380
New
Sewer Main Cleaning and CCTV InspectionThe contract requires high-resolution video inspection of sewer mains conducted after cleaning to evaluate pipeline condition and prepare for PACP/MACP coding, ensuring standardized assessment and documentation of structural integrity. The work is part of a larger effort to maintain and rehabilitate sewer infrastructure, with inspection data directly supporting future repair or replacement decisions based on industry-accepted condition rating protocols. All inspections must be performed with precision to capture detailed imagery suitable for accurate analysis and compliance with accepted coding standards. This is a subcontract under the SBA’s small business set-aside program, open exclusively to Small Business, Small Disadvantaged Business, Women-Owned Small Business, Veteran-Owned Small Business, Alaskan Native Corporations, Indian Tribes, and Disadvantaged Business Enterprises under the Department of Transportation. The NAICS code 541380 classifies this as environmental consulting services, and the response deadline is September 10, 2026. The contracting entity is SAK Construction, LLC, with the place of performance tied to the Memphis, Tennessee area, specifically the SARP10 Humphreys Blvd CIPP project, though exact site details are not provided. All work must align with the technical expectations for post-cleaning video assessment to ensure valid, reusable condition data.
SAK Construction, LLC

POSTED

about 22 hours ago

DEADLINE

in about 1 month
View Details