Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Replace Campfire Center, Entrance Gets and Water Distribution System - Geotech

Forecast
14344_Caswell Memorial Geotech NOE_10State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Parks and Recreation is conducting geotechnical investigations at Caswell Memorial State Park in Ripon, California, to support the installation of a new waterline in the park's Day Use and Campground areas. The primary objective is to identify soil conditions to ensure a safe and consistent drinking water source for visitors and staff. The scope of work requires the use of a truck-mounted drill with hollow-stem or solid flight augers to complete ten geotechnical borings, ranging from 5 to 7.5 inches in diameter and 3 to 40 feet in depth. All borings must be logged according to the Unified Soil Classification System and backfilled using excavated native materials. This project is identified by solicitation number 14344_Caswell Memorial Geotech NOE_10 and is classified as a sources-sought notice for internal project approval rather than a competitive procurement. Consequently, it is categorized as a Notice of Exemption under California Environmental Quality Act Class 6, Section 15306, as the work involves basic data collection and research without significant environmental disturbance. The notice was posted on October 21, 2025, with a response deadline of October 28, 2025. Monica Aleman serves as the primary point of contact for the project.

General Info

Geotechnical soil investigations for new waterline installation at Caswell Memorial State Park, California.

Agency

California Parks and Recreation, Department of

Place of Performance

Austin Road and South Austin Road, Ripon, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Anticipated deadline

Forecast, not yet open for bids.

Anticipated deadline

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia Parks and Recreation, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Parks and Recreation, Department of
Office AddressN/A
Contacts
Monica AlemanEnvironmental Coordinator

Full Description

Show more
Conduct geotechnical investigations at Caswell Memorial State Park to identify soil conditions for installation of a new waterline in the Day Use and Campground areas of the park to provide a safe and consistent source of drinking water for park staff and visitors. Work will use a truck-mounted drill, equipped with hollow-stem and/or solid flight augers to complete ten (10) geotechnical borings ranging from 5 – 7.5 inches in diameter and 3 to 40-feet deep. Borings will be logged in accordance with the Unified Soil Classification System (UCSC) and back filled with excavated materials.

Similar Contracts

Same NAICS industry code

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS