Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Energy was posted on February 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Wilson Hall Facade Repairs and Restoration

Closed
Federal
Submission Closed
Solicitation #
370886-CD

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract is for the Wilson Hall Facade Repairs and Restoration project, requiring the subcontractor to perform all specified work as outlined in the Statement of Work and accompanying drawings. The scope includes all necessary components such as transportation, overhead, bonding, insurance, safety oversight, quality control, and supervision for the completion of the project. The repair and restoration efforts are divided into three distinct phases, addressing different elevations of Wilson Hall: Phase 1 involves the East Elevation, Phase 2 the North and South Elevations, and Phase 3 the West Elevation. The contract award anticipates the completion of Phase 1 in 2026, with Phases 2 and 3 available as unilateral options that Fermilab may elect to proceed with between 2027 and 2030, depending on need and funding availability. Each phase must be completed within 180 calendar days following the issuance of a separate Notice to Proceed. The solicitation is posted by Fermilab, a DOE contractor based in Batavia, Illinois, with a response deadline in mid-February 2026. The primary contact for the contract is Chris Daley.

General Info

Wilson Hall Facade Repairs divided into three phases, starting 2026, each within 180 days completion.

NAICS

238110 - Poured Concrete Foundation and Structure Contractors

Place of Performance

Batavia, IL, 60510, USA

Set-Aside

Small Business

Documents

21
PDF, High priority: read this first2 pages · amendment
High
PDF, High priority: read this first2 pages · amendment
High
PDF, High priority: read this first1 page · amendment
High
PDF, High priority: read this first2 pages · amendment
High
PDF, High priority: read this first3 pages · insurance-requirements
High
PDF, High priority: read this first12 pages · proposal-certifications
High
PDF, High priority: read this first25 pages · contract-document
High
PDF, High priority: read this first2 pages · payment-bond
High
PDF, High priority: read this first4 pages · performance-bond
High
PDF, High priority: read this first12 pages · rfp
High
PDF, High priority: read this first32 pages · rfp
High
PDF, High priority: read this first7 pages · contract-document
High
PDF, High priority: read this first1 page · contract-document
High
PDF, High priority: read this first4 pages · bid-bond
High
PDF, High priority: read this first2 pages · sow
High
PDF, High priority: read this first6 pages · sarc
High
PDF, High priority: read this first37 pages · wage-determination
High
PDF, High priority: read this first179 pages · specifications
High
PDF, High priority: read this first35 pages · specifications
High
PDF, Low priority1 page · certificate-of-resale
Low
PDF, Low priority2 pages · other
Low

Read all 21 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26_1208 – Lumber Bridge-NCOpen now, due in 7 days
  • 26_1130 – Martinsburg-PAOpen now, due in 1 day
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

3 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Feb 17, 2026 to Feb 24, 2026. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Fermilab - DOE Contractor
Contacts1 person available
OfficeBatavia, IL, 60510, USA

Full Description

Show more

On February 16, 2026, Amendment 3 issued to Add Exhibit P, Tax Exempt Certificate for FFDG, and to Add Exhiobit Q, Form CRT-61 Certificate for Resale,a nd to provide responses to questions from prospective offerors.


On February 11, 2026, Amendment 2 issued to provide responses to questions from prospective offerors, and to extend the due date. Please see atatched file for more information.


On February 5, 2026, Amendment 1 issued to provide responses to questions from prospective offerors. Please see atatched file or more information.


The Subcontractor shall perform all work as described in the Statement of Work for the Wilson Hall Facade Repairs and Restoration included as Exhibit A and the Wilson Hall Facade Repairs and Restoration Drawing Set included as Exhibit B.  All work shall include transportation, overhead, bonding costs, insurance, safety oversight, quality control oversight, and supervision as required to construct the project described in the scope of work, and the detailed description contained herein.


The requirements for repair and restoration of the Wilson Hall facade are segregated into three phases: 


  • Phase 1 includes restoration and repair of the East Elevation of Wilson Hall,
  • Phase 2 includes restoration and repair of the North and South Elevations of Wilson Hall, and
  • Phase 3 includes restoration and repair of the West Elevation of Wilson Hall. 

FFDG expects to award a contract that includes completion of Phase 1 in 2026.  Phases 2 & 3 will be identified as unilateral options.  Those options may be exercised at FFDG’s discretion in 2027, 2028, 2029 and/or 2030 based on FFDG’s determination of need and the availability of funding.  


It is FFDG’s expectation that each phase will be completed within 180 calendar days after issuance of a Notice to Proceed (NTP). A separate NTP will be issued for each phase.

More opportunities from Department Of Energy → Fermilab - DOE Contractor

Same awarding agency

NAICS: 236220
New
Federal
Wilson Hall Floor 16 Electric and Elevator Machine Rooms Fire Rating and Mechanical Upgrade
Solicitation # 385515GMK
Fermilab has issued solicitation 385515GMK for the fire rating and mechanical upgrade of the Electric and Elevator Machine Rooms located on Floor 16 of Wilson Hall in Batavia, Illinois. The scope of work includes the installation of 2-hour rated walls and ceilings using Type X gypsum wallboard, sealing all penetrations between 1/4 inch and 6 inches, and the installation of a new AC-5 condenser on the East observation deck roof. The project requires the use of medium-weight CMU for fire-rated infill and adheres to strict technical standards, including TMS 602/ACI 530.1/ASCE 6 for masonry and AWS D1.1/D1.1M for structural welding. This is a Small Business Set Aside - Total. The procurement process includes a site visit and a series of amendments that have updated the project exhibits and Q&A logs. Proposals must be submitted electronically to Gina M. Kern by 3:00 pm CST on December 9, 2026. Key requirements include a two-year labor warranty from the date of substantial completion and the use of a professional engineer licensed in the State of Illinois for delegated design and PE-sealed submittals. Additionally, the contractor must engage the manufacturer's service representative to witness testing and inspect the Variable Refrigerant Flow HVAC system installations.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 13 days
View Details
NAICS: 236210
Federal
Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
Solicitation # RFP-376508-CD
The Central Utility Building (CUB) Addition and Renovation project, designated as UIP Subproject 1-CUB, involves the expansion and revitalization of the CUB at the Fermi National Accelerator Laboratory in Batavia, Illinois. The scope of work includes the construction of a building addition to accommodate new chillers, selective demolition of existing infrastructure, and comprehensive upgrades to the heating hot water, chilled water, and electrical systems, including the installation of medium voltage switches and transformers. The project is critical to Fermilab's mission as the CUB provides essential utility services to various lab buildings. This is a firm-fixed-price contract with no set-aside used. Construction is strictly constrained by the accelerator shutdown window, with on-site efforts anticipated to start on January 1, 2028, and conclude by January 1, 2030, with a final completion deadline of October 1, 2029. Key milestones include the issuance of the Notice to Proceed by December 30, 2027, and the completion of the CUB extension and upgrades by September 28, 2029. Award selection is based on a best-value tradeoff method where technical factors are significantly more important than price. Offerors must meet stringent pass-fail requirements, including a minimum current ratio of 1.20, an aggregate bonding capacity of at least $100 million, and the provision of audited financial statements for the past three fiscal years.
Industrial Building Construction

POSTED

7 days ago

DEADLINE

in 21 days
View Details
NAICS: 332999
Federal
WFE Solenoid/Corrector Magnet Spares
Solicitation # 389116swk
Fermilab, managed by the Fermi Forward Discovery Group (FFDG) for the Department of Energy, is soliciting proposals for the design, manufacturing, fabrication, and delivery of two solenoid magnets with integrated dipole corrector magnets. These components are critical for steering, focusing, and matching a 30 keV H+ beam from an ion source into a Radio Frequency Quadrupole accelerator. The scope of work includes comprehensive quality control, magnetic testing, and the provision of detailed documentation such as final design reports, material certifications, and QC fabrication and inspection plans. Deliverables must be shipped F.O.B. Fermilab in a single batch, with strict packaging requirements to prevent corrosion and structural damage, including the use of shock indicators for loads exceeding 10 G. The procurement utilizes a best value trade-off source selection process, where technical proposals, infrastructure capabilities, schedule (via Gantt chart), and past experience are weighted as significantly more important than cost. Proposals are due by January 5, 2027, at 5pm Central, with a prior question deadline of November 30, 2026. Awardees must undergo a series of program reviews, including an initial kickoff, a Preliminary Design Review at 50% maturity, and a Final Design Review at 90-100% maturity before production begins. There is no specified set-aside status for this solicitation.
All Other Miscellaneous Fabricated Metal Product Manufacturing

POSTED

9 days ago

DEADLINE

in about 1 month
View Details
NAICS: 23822
Federal
PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION
Solicitation # 378854_MR
This project involves the fabrication and installation of a Low Conductivity Water (LCW) Piping System in the F-37 Pump Room at the Fermi National Accelerator Laboratory in Batavia, Illinois. The scope of work includes the installation of two 50 hp centrifugal pumps, a shell and tube heat exchanger, a 250-gallon expansion reservoir tank, and various process loop equipment such as a deionization skid, particulate filter, and dissolved oxygen removal skid. The contractor is responsible for providing all piping, hardware, process instrumentation, structural supports, and foundation bases, as well as performing electrical installations. The project is unrestricted and will be awarded based on a lowest price-technically acceptable (LPTA) selection process. The period of performance is 180 calendar days from the receipt of the Notice-to-Proceed. Key technical requirements include compliance with ASME B31.3 and B31.9, as well as Fermilab's specific pressure testing and piping manuals. Contractors must provide a project-specific quality control plan and adhere to strict safety standards, including 10 CFR 851 and FESHM Chapter 7010. Proposals must be submitted in two separate parts—technical and business/price—by December 3, 2026, at 2:00 p.m. CDT. Required certifications include the Buy American Act, DEI discrimination compliance, and the provision of performance and payment bonds. Access to the secured DOE site requires U.S. citizenship, a REAL ID, and an access request submitted at least seven days in advance.

POSTED

10 days ago

DEADLINE

in 7 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS