Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Wrights Lake Forest Health and Hazardous Fuels Reduction Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Wrights Lake Forest Health and Hazardous Fuels Reduction Project is a forecast initiative led by the Georgetown Divide Resource Conservation District and the USDA Forest Service, Pacific Ranger District, Eldorado National Forest. Located in the Sierra Nevada mountains within the greater Wrights Lake area, the project aims to increase wildfire resilience across approximately 1,731 acres. The primary scope of work involves the removal or modification of surface and ladder fuels and the establishment of canopy separation within the dominant overstory. These objectives will be achieved through mechanical treatments and prescribed fire, focusing on areas with high fuel load conditions that fall outside existing special use authorities. The project includes ongoing maintenance to manage surface fuel loading and canopy separation throughout its lifecycle. Additional deliverables involve the reduction or elimination of hazard trees, maintenance of existing roads, and the improvement of ingress and egress for more effective fire suppression. Compliance is governed by the Eldorado National Forest LRMP and the Sierra Nevada Forest Plan Amendment, with specific protections for riparian sites and historic properties. Safety requirements mandate the use of personal protective equipment for workers and clear signage and colorant marking to mitigate risks to the public. The project is exempt from CEQA as it has been reviewed under NEPA, with the associated Environmental Assessment and Decision Notice signed in October 2024.

General Info

USFS to treat 1,731 acres in California using mechanical and fire methods to reduce wildfire risk.

Agency

California → El Dorado County Resource Conservation District

NAICS

115310 - Support Activities for ForestryView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(2)

Calder Fire Restoration Project Maximum Extent Scenario Decision Notice and FONSI

PDFdecision-notice-fonsi

Wrights Lake Forest Health and Hazardous Fuels Reduction Project CEQA Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → El Dorado County Resource Conservation District
Contacts2 people available
OfficeN/A
Organization / Agency
California → El Dorado County Resource Conservation District
Office AddressN/A
Contacts
Mark EgbertDistrict Manager
Colleen SloanUSFS North Zone NEPA Planner

Full Description

Show more
The USFS proposes hazardous fuels reduction treatments to remove or modify surface and ladder fuels and establish canopy separation within the dominant overstory through either mechanical or prescribed fire treatments throughout the project area (up to approximately 1,731 acres). Additional maintenance treatments to maintain reduced surface fuel loading and canopy separation may occur throughout the life of the project and would also comprise of mechanical and/or prescribed fire treatments. Treatments are intended to increase resilience to wildfires by creating and maintaining an area where wildfire behavior is substantially modified, reducing the risk of high severity wildfire and the resulting tree mortality and loss of assets within developed areas. The proposed action focuses on areas with high fuel load conditions outside the already existing special use authorities within the project area.

Similar Contracts

Same NAICS industry code

NAICS: 115310
New
SLED
Aerial Ignition Services for Prescribed Burning
Solicitation # FWC 26/27-23
The Florida Fish and Wildlife Conservation Commission is soliciting competitive pricing for aviation services to conduct aerial ignition prescribed burns on public conservation lands in northwest Florida. The scope of work includes providing all labor and equipment for aerial prescribed fire ignition using Delayed Aerial Ignition Devices, as well as crew and supply transport across diverse terrains such as wetlands, marshes, prairies, and pine timber lands. The contractor must utilize turbine engine helicopters with a minimum manufacturer-specified useful load capability exceeding 750 pounds and ensure all aircraft are operated under a certified FAA program. Additionally, the contractor is required to provide inspection flights for the Commission's Site Manager, utilizing aircraft equipped with side cockpit and cabin windows and electrical power for two laptop computers. The contract is structured as a three-year term with potential yearly renewals, with all project activities to be completed by June 12, 2029. Awarding will be based on the lowest total price submitted by a responsive and responsible bidder. To be considered responsive, bidders must submit sealed physical bids by October 8, 2026, at 2:30 PM ET, including a price sheet, pilot and aircraft information, and FAA attestations. The contractor must comply with various federal laws, including the Clean Air Act and Migratory Bird Treaty Act, and adhere to OSHA, FAA, and EPA safety standards. Payment is subject to the successful completion of tasks and written acceptance of deliverables by the Commission.
Florida Fish and Wildlife Conservation Commission

POSTED

about 14 hours ago

DEADLINE

in 21 days
View Details
NAICS: 115310
New
SLED
Telogia Creek Sand Pine Removal
Solicitation # FWC 26/27-15
The Florida Fish and Wildlife Conservation Commission is soliciting competitive bids for sand pine regeneration removal services covering approximately 797 acres at various locations within the Telogia Creek WMA in Liberty County, Florida. The project requires the removal of sand pines using specific methods, mandating hand pulling for pines with a stem diameter of less than one half inch and requiring that saws cut pines below the lowest live branches. Treated pines must be left where they are cut or pulled rather than piled, and all trash and debris must be removed from the site upon completion. Work must be conducted along transects spaced five feet or less apart, ensuring that non-target trees, such as Long Leaf Pine, remain upright. The contract will be awarded to the responsive and responsible bidder offering the lowest total price, based on the summed cost per acre across light, moderate, and heavy sand pine presence levels. The initial term is for one year, with the Commission holding the option to renew the contract annually for up to two additional years. Bidders must be registered in the MyFloridaMarketPlace and SunBiz systems and submit their bids via sealed envelope by the deadline. Compliance requirements include the use of the E-Verify system, adherence to federal safety standards, and the provision of necessary insurance, including Worker's Compensation, automobile, and public liability insurance. Payment is processed through electronic invoicing and is subject to a transaction fee.
Florida Fish and Wildlife Conservation Commission

POSTED

about 16 hours ago

DEADLINE

in 30 days
View Details
NAICS: 115310
New
Federal
Boundary Line Maintenance - Kisatchie National Forest - Louisiana
Solicitation # 12443926Q0242
Solicitation 12443926Q0242 is a Small Business Set Aside for property boundary maintenance services within the Kisatchie National Forest, specifically covering the Caney and Catahoula Ranger Districts in Louisiana. The contractor is responsible for providing all labor, materials, and expertise to maintain previously marked property lines, identify and maintain land corners, and replace boundary signs and bearing tree tags. Key deliverables include the preparation of Form 7100-52 Corner Records for every maintained corner and adherence to Forest Service Standards for painting and monumentation, such as using red paint for blazes and hacks. The scope of work involves painting 22.5 miles in the Caney District and 28.6 miles in the Catahoula District, with corner maintenance considered incidental to the per-mile pricing. The contract is a firm-fixed-price purchase order with a period of performance from October 5, 2026, to February 26, 2027. Award will be based on the lowest price technically acceptable criteria, where the lowest priced offer is evaluated for technical acceptability and past performance. To be responsive, offerors must provide a detailed technical approach and evidence of similar projects completed within the last three years. Quality control is the contractor's responsibility, and final acceptance is subject to a random 10 percent sample inspection, where 100 percent of the sample must meet specifications. Invoicing must be processed electronically via the Department of Treasury's Invoice Processing Platform.
Csa East 1 Usda-Fs

POSTED

4 days ago

DEADLINE

in 9 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS