WWTP Recycled Water Reservoir CEQA Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Redlands Municipal Utilities and Engineering Department is advancing the construction of a 2.75-million-gallon recycled water reservoir and adjacent pump station at the southeast corner of Mills Street and Nevada Street within the Wastewater Treatment Plant grounds, situated on an empty lot west of the existing sludge drying beds. The project is being managed under the California Environmental Quality Act (CEQA) with the project identifier 2025090058, and all environmental review, mitigation, and compliance activities are coordinated through the City as the Lead Agency. The scope of work includes comprehensive geotechnical investigation, subsurface exploration, laboratory testing per ASTM and California Test Methods, and the development of a final geotechnical report that will inform foundation design, earthwork procedures, utility backfill, and seismic parameters using spectral acceleration values and risk coefficients validated for the site. Construction phases are outlined with site preparation beginning in February 2023, grinding completed by December 2023, and building construction scheduled to conclude by August 2026. Inspection and acceptance will occur on-site at 1950 Nevada Street, Redlands, with compliance verified against CEQA guidelines, SCAQMD air quality thresholds, noise regulations, and geotechnical standards such as ASTM D4546 and D6913 to ensure environmental impacts are mitigated to less than significant levels. The City Engineer, Goutam Dobey, serves as the primary point of contact and lead agency representative, with all communications and submissions directed to his office at 35 Cajon Street, Suite 15A, Redlands, CA 92373. While numerous technical references and environmental databases are cited in support of the project—including RCRA, FEMA flood data, NPDES permits, and regional water management plans—no federal acquisition regulation clauses, contract pricing, payment instructions, invoicing systems, or socioeconomic certifications are included in the documentation, indicating this is a municipal infrastructure project governed by state environmental and engineering protocols rather than federal procurement requirements. There is no stated contract value, delivery terms, or formal award evaluation criteria, and no formal packaging, marking, or special contract requirements have been defined beyond the technical and environmental conditions governing construction.

General Info

City of Redlands builds 2.75M-gallon recycled water reservoir and pump station per CEQA, with geotechnical and environmental compliance.

Agency

California → City of Redlands

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Nevada St, Palmetto Ave, Redlands, CA

Set-Aside

NONE

Documents

(6)

Summary Form for WWTP Recycled Water Reservoir CEQA Project

PDFenvironmental-summary

WWTP Recycled Water Reservoir Initial Study/Mitigated Negative Declaration

PDFenvironmental-assessment

WWTP Recycled Water Reservoir Project Notice of Determination

PDFnotice-of-determination

WWTP Recycled Water Reservoir CEQA Project Summary Form Attachment A

PDFsummary-form

NOI to Adopt Mitigated Negative Declaration for WWTP Recycled Water Reservoir Project

PDFnotice-of-intent

Notice of Completion - WWTP Recycled Water Reservoir CEQA Project

PDFnotice-of-completion

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Redlands
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Redlands
Office AddressN/A
Contacts
Goutam DobeyCity Engineer

Interested Companies (1)

Show more
Chambers Group
Costa Mesa, CA

Full Description

Show more
The City of Redlands Municipal Utilities and Engineering Department proposes the construction of a 2.75 MG recycled water reservoir and pump station. The water reservoir and pump station will be constructed on the empty lot west of the existing sludge drying beds, at the southeast corner of Mills Street and Nevada Street within the City's Wastewater Treatment Facility.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details