WWTP Recycled Water Reservoir CEQA Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Redlands Municipal Utilities and Engineering Department is overseeing the construction of a 2.75 million gallon recycled water reservoir and pump station. The project is located at the City's Wastewater Treatment Facility at 1950 Nevada Street, specifically on an empty lot at the southeast corner of Mills Street and Nevada Street. The primary objective of this infrastructure expansion is to increase the city's capacity to treat and store water during wet periods for distribution during dry periods to mitigate the effects of long-term drought. The project has undergone a comprehensive environmental review process in compliance with the California Environmental Quality Act, resulting in a Mitigated Negative Declaration and a Notice of Determination dated November 18, 2025, confirming that the project will not have a significant environmental effect. Key requirements include strict adherence to cultural and paleontological resource management, requiring the use of qualified professionals and the implementation of mitigation plans if resources are discovered. The project also involves managing hazardous materials such as petroleum-based fuels and lubricants. Goutam Dobey, the City Engineer, serves as the primary point of contact for the effort.

General Info

City of Redlands builds 2.75M-gallon recycled water reservoir and pump station per CEQA, with geotechnical and environmental compliance.

Agency

California → City of Redlands

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Nevada St and Palmetto Ave, Redlands, CA, 92373

Set-Aside

NONE

Documents

(6)

Summary Form for WWTP Recycled Water Reservoir CEQA Project

PDFenvironmental-summary

WWTP Recycled Water Reservoir Initial Study/Mitigated Negative Declaration

PDFenvironmental-assessment

WWTP Recycled Water Reservoir Project Notice of Determination

PDFnotice-of-determination

WWTP Recycled Water Reservoir CEQA Project Summary Form Attachment A

PDFsummary-form

NOI to Adopt Mitigated Negative Declaration for WWTP Recycled Water Reservoir Project

PDFnotice-of-intent

Notice of Completion - WWTP Recycled Water Reservoir CEQA Project

PDFnotice-of-completion

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Redlands
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Redlands
Office AddressN/A
Contacts
Goutam DobeyCity Engineer
Eunice BagwanEnvironmental Planner

Interested Companies (1)

Show more
Chambers Group
Costa Mesa, CA

Full Description

Show more
The City of Redlands Municipal Utilities and Engineering Department proposes the construction of a 2.75 MG recycled water reservoir and pump station. The water reservoir and pump station will be constructed on the empty lot west of the existing sludge drying beds, at the southeast corner of Mills Street and Nevada Street within the City’s Wastewater Treatment Facility.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for a firm-fixed-price contract to perform maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes the dredging and ocean disposal of approximately 4,260 cubic yards of material, with disposal at an approved offshore site south of Oahu. Additionally, the contractor will perform revetted mole repairs involving clearing and grubbing, vegetation and root removal, stone rework, and filling voids with additional stone. The estimated value of the work ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This solicitation is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Bidders must provide a bid guarantee and are required to furnish performance and payment bonds upon award. Key deliverables include pre- and post-dredge multi-beam surveys conducted by a third-party qualified surveyor and the submission of an operations plan within 30 days of the Notice to Proceed. The contract mandates strict adherence to USACE accuracy standards and quality control measures, including a punch-out inspection and final acceptance inspection. Liquidated damages for delays are set at 2,297 dollars per calendar day. Bids must be submitted in sealed envelopes to the Fort Shafter office, as electronic submissions are not permitted.
Healy Tibbitts Builders, Inc.

POSTED

about 4 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237990
New
SLED
Reclamation District No. 1600 DMP Drainage Pipe Replacement ProjectReclamation District 1600 is undertaking the Deferred Maintenance Program Drainage Pipe Replacement Project in Yolo County, California. The project consists of the in-kind replacement of a single 48-inch gravity drainage pipe located southeast of Knights Landing along the Tule Canal at Levee Mile 0.36. The primary objective is to maintain the existing pipe size, function, and alignment to ensure the continued conveyance of water from agricultural lands east of Woodland to the Tule Canal within the Yolo Bypass. Construction is scheduled to begin on August 3, 2026, with a phased timeline including mobilization, site preparation, excavation and demolition, pipe installation, levee restoration, and final demobilization. The project has undergone a comprehensive environmental review under the California Environmental Quality Act, resulting in a Mitigated Negative Declaration. This assessment determined that there are no significant unmitigable environmental impacts, provided that specific avoidance and minimization measures are implemented. Key requirements for the contractor include mandatory worker environmental awareness training, the installation of temporary exclusion fencing to protect aquatic habitats, the execution of a Spill Prevention, Containment, and Countermeasure Plan, and adherence to strict in-water work windows. Additionally, the contractor must utilize vibratory pile drivers for cofferdams and maintain daily inspections of silt curtains to control turbidity in compliance with Basin Plan standards and Cal-OSHA safety requirements.
Reclamation District 1600

POSTED

about 13 hours ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS