This Solicitation opportunity from Department Of Transportation was posted on February 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Solicitation 69056726R000005 is a Request for Proposals for a firm-fixed-price task order under an existing IDIQ vehicle for the Yellowstone, Grand Teton, and Surrounding Area MATOC. The project, managed by the Department of Transportation Federal Highway Administration Western Federal Lands Division, involves road reconstruction and site improvements for the Moose Wilson Road Phase 2 and Teton Park Road from Moose to Taggart Lake Trailhead in Grand Teton National Park, Wyoming. The scope of work includes approximately 2.95 miles of reconstruction, utilities, grading, asphalt and concrete pavement, roundabout construction, lighting installation, and roadway obliteration. The estimated contract value ranges from 20 million to 35 million dollars, with a final completion date no later than November 19, 2027.
This solicitation is restricted to six specific prime contractors: H-K Contractors, M.A. Deatley Construction, Missouri River Contractors, Oftedal Construction, Riverside Contracting, and Sundt Construction. Proposals are evaluated using a best value trade-off analysis based on technical and cost factors. Key requirements include strict adherence to Stormwater Pollution Prevention Plans, compliance with noxious weed certifications, and the use of specific brand-name products for lighting and park infrastructure. Contractors must follow rigorous fire protection and suppression protocols and submit printed hard-copy proposals. Performance is subject to visual inspections at the source and final acceptance at the project site based on specific pavement quality metrics.
HighAI Summary for Amendment A001 to Solicitation 69056726R000005 Moose Wilson Road Phase 2 and Teton Park Road: This document is Amendment A001 dated 01/22/2026 to Solicitation No. 69056726R000005 issued by the Department of Transportation Federal Highway Administration. It modifies the solicitation for the WY NPS GRTE 2020(1) Moose Wilson Road Phase 2 and WY NP GRTE 11(1) Teton Park Road - Moose to Taggart Lake Trailhead project. Key revisions include updates to specifications and permits, bid schedule pricing, minimum wage schedule with updated Davis-Bacon wage decision, and special contract requirements including new definitions and revisions to measurement, pricing adjustments, and progress payments. The amendment requires acknowledgment by offerors and submission of revised pages with proposals. It also includes important notices about offer submission and fraud alerts.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment A002 to Solicitation 69056726R000005 Moose Wilson Road Phase 2 and Teton Park Road: This document is Amendment A002 dated 01/29/2026 to Solicitation 69056726R000005 for the WY NPS GRTE 2020(1) Moose Wilson Road Phase 2 and WY NP GRTE 11(1) Teton Park Road - Moose to Taggart Lake Trailhead project. It revises the solicitation by extending the offer due date to 02/05/2026, adding bid schedule items A2065 and A2075, and updating special contract requirements and plan sheets. The amendment includes detailed changes to contract clauses, environmental protection, pricing adjustments, and facility requirements. It instructs offerors to submit revised pages with their proposals and acknowledges that all other terms remain unchanged.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment A003 to Solicitation 69056726R000005 Moose Wilson Road Phase 2 and Teton Park Road: This document is Amendment A003 dated 02/02/2026 to Solicitation 69056726R000005 issued by the Department of Transportation Federal Highway Administration. It modifies the solicitation for the Moose Wilson Road Phase 2 and Teton Park Road - Moose to Taggart Lake Trailhead projects. The amendment revises the bid schedule by removing item A2075 and updates plan sheets B.4, L.1, and L.12 with revised quantities and traffic control plans. It instructs offerors to submit revised pages A-7 through A-17 with their proposals. All other terms and conditions of the original solicitation remain unchanged.
PDF
PDF, High priority: read this first3 pages · justification-and-authorization
HighAI Summary for Brand Name Justification & Approval for WY NP GRTE 11(1) Teton Park Road Lighting: This document is a Brand Name Justification & Approval (J&A) dated June 24, 2025, for the Teton Park Road project in Grand Teton National Park under project number WY NP GRTE 11(1). It justifies the use of specific brand-name luminaires and light poles from Leotek, Valmont, and Ecosense due to unique requirements and compatibility with existing park infrastructure. The justification cites FAR 6.302-1 authority for other than full and open competition, emphasizing the necessity of these products for maintenance consistency and aesthetic conformity. The document includes product details, pricing, market research findings, and certifications by the project manager and contracting officer, confirming the accuracy and completeness of the justification.
PDF
PDF, High priority: read this first75 pages · geotechnical-report
HighAI Summary for GR01-23 Moose Wilson Road Phase 2 Final Geotechnical Report: This final geotechnical report, dated January 2023, provides detailed recommendations for the Moose Wilson Corridor Management Support Phase 2 project in Grand Teton National Park, Wyoming. It covers subsurface investigations, soil testing, and design recommendations for reconstructing and realigning sections of Moose Wilson Road, overlaying pavement, and constructing a new parking area. The report includes project descriptions, geology, site conditions, groundwater data, and construction considerations. It supports the 95% plan set and supersedes previous memorandums and reconnaissance reports. Appendices contain boring logs, laboratory test reports, and soil health data.
PDF
PDF, High priority: read this first2 pages · presolicitation
HighAI Summary for Notice to Prospective Offerors Moose Wilson and Teton Park Road Project 69056726R000005: This notice provides preliminary plans and information for the upcoming solicitation 69056726R000005 for Moose Wilson Road Phase 2 and Teton Park Road reconstruction projects in Grand Teton National Park, Wyoming. It describes the base schedule and option task order work including road reconstruction, parking area construction, and intersection improvements. The document advises prospective offerors to view the project site during fall due to winter conditions and provides contact information for technical and general questions. Solicitation documents will be available in winter 2025/2026 on SAM.gov, with instructions for automatic notifications.
PDF
PDF, High priority: read this first59 pages · hazardous-materials-survey
HighAI Summary for Pre-Demolition Asbestos and Hazardous Materials Survey Report for Barker-Davis Site: This report, dated March 23, 2021, presents the findings of a pre-demolition asbestos and hazardous materials survey conducted on October 28, 2020, at the Barker-Davis site in Moose, Wyoming. Prepared for the National Park Service Grand Teton National Park by Jorgensen Associates, Inc., the survey identified asbestos-containing materials, lead-based paint, mercury-containing articles, and other hazardous substances in the structures slated for demolition. The report includes detailed assessments, regulatory overviews, and disposal considerations, along with cost estimates for deconstruction and abatement. The purpose is to ensure compliance with EPA and OSHA regulations prior to demolition activities.
PDF
PDF, High priority: read this first48 pages · hazmat-survey
HighAI Summary for Pre-Demolition Asbestos and Hazardous Materials Survey - Wittmer House: This document is a pre-demolition asbestos and hazardous materials survey conducted on September 29, 2016, for the Wittmer House located in Wilson, WY. Prepared by Jorgensen Associates, P.C. in association with Ecology & Environment, Inc., the survey identifies and quantifies asbestos-containing materials (ACM) and other hazardous substances in compliance with EPA and OSHA regulations. It includes visual and physical assessments, sample collection and analysis, regulatory overview, findings, and recommendations for asbestos abatement prior to demolition. Appendices provide detailed sample locations, lab reports, photos, site maps, cost estimates, and certifications.
PDF
PDF, High priority: read this first7 pages · q-and-a
HighAI Summary for QA Document for WY NPS GRTE 2020(1) Moose Wilson Road Project: This document is a Question and Answer (Q&A) record for the WY NPS GRTE 2020(1) Moose Wilson Road and WY NP GRTE 11(1) Teton Park Road projects. It contains technical clarifications and responses dated January 22 to January 28, 2026, addressing concrete mix designs, reinforcement details, project-specific construction questions, and references to amendments for unresolved issues. The Q&A clarifies specifications such as concrete finishes, reinforcement, contractor camp locations, and equipment requirements, providing essential guidance for bidders and contractors.
PDF
PDF, High priority: read this first2 pages · q-and-a
HighAI Summary for QA Document for WY NPS GRTE 2020(1) Moose Wilson Road Project: This Q&A document dated January 22, 2026, addresses technical questions related to the WY NPS GRTE 2020(1) Moose Wilson Road and WY NP GRTE 11(1) Teton Park Road projects. It provides clarifications on concrete mix designs, color codes, finishes, reinforcement details, and specific line item inquiries. Some questions reference forthcoming amendments for further resolution. The document serves to clarify technical specifications and contract requirements for bidders and contractors.
PDF
PDF, High priority: read this first436 pages · rfp
HighAI Summary for RFP 69056726R000005 Moose Wilson-Teton Park Road Phase 2: This document is a Request for Proposals (RFP) for the Yellowstone, Grand Teton, & Surrounding Area MATOC Task Order, Solicitation No. 69056726R000005. It covers the Moose Wilson Road Phase 2 and Teton Park Road from Moose to Taggart Lake Trailhead projects in Grand Teton National Park, Wyoming. The RFP includes instructions for proposal submission, bid schedule, contract clauses, wage determinations, special contract requirements, and plans. It specifies that electronic bids will not be accepted and provides a checklist for offerors to ensure completeness of their proposals. The document also lists the prime contractors eligible to submit proposals and provides contact information. The issuing office is the U.S. Department of Transportation Federal Highway Administration in Vancouver, WA. The document is intended to solicit competitive bids from qualified contractors for road construction and related work.
PDF
PDF, High priority: read this first122 pages · swppp
HighAI Summary for SWPPP for WY NP GRTE 11(1) Teton Park Road Project: This Stormwater Pollution Prevention Plan (SWPPP) document, dated June 17, 2025, is for the WY NP GRTE 11(1) Teton Park Road project from Moose to Taggart Lake Trailhead in Teton County, Wyoming, under the Federal Highway Administration Western Federal Lands Highway Division. It includes a detailed narrative, permit information (WYR10), site description, and a comprehensive table of contents covering erosion control, site maps, inspection reports, and training logs. The plan outlines construction activities such as roundabout construction, lighting installation, and bike path reconstruction, with an estimated final stabilization date of November 30, 2026. The SWPPP aims to control erosion, sedimentation, and stormwater contamination in compliance with Wyoming DEQ WYPDES permits and the Clean Water Act.
PDF
PDF, High priority: read this first149 pages · swppp
HighAI Summary for SWPPP Moose Wilson Road Phase 2 WY NPS GRTE 2020(1): This Stormwater Pollution Prevention Plan (SWPPP) document is for the Moose Wilson Road, Phase 2 project in Teton County, Wyoming, within Grand Teton National Park. It is prepared for the Federal Highway Administration Western Federal Lands Highway Division. The SWPPP includes a narrative, permit details (WYPDES Permit WYR10), site description, and a comprehensive table of contents covering erosion control, site maps, inspection reports, and training logs. The plan outlines construction activities such as road realignment, parking area construction, and erosion control measures, with an estimated final stabilization date of October 1, 2027. The document is intended to ensure compliance with Wyoming Department of Environmental Quality regulations and the Clean Water Act, providing a dynamic, site-specific approach to controlling stormwater pollution during construction.
PDF
PDF, High priority: read this first139 pages · swppp
HighAI Summary for SWPPP Moose Wilson Road Phase 2 WY NPS GRTE 2020(1): This Stormwater Pollution Prevention Plan (SWPPP) document is for the Moose Wilson Road Phase 2 project in Grand Teton National Park, Wyoming, under the Federal Highway Administration Western Federal Lands Highway Division. It includes a detailed narrative, permit information (WYR10), site description, construction activity sequence, and environmental controls to comply with Wyoming Department of Environmental Quality WYPDES Large Construction General Permit. The plan addresses erosion and sediment control, site maps, inspection reports, and other compliance elements. The estimated final stabilization date is October 1, 2027, covering approximately 8.6 acres of disturbance within a 19.3-acre site.
PDF
PDF, High priority: read this first76 pages · plans
HighAI Summary for WY NP GRTE 11(1) Construction Plans and Symbols: This document contains detailed construction plans and symbols for the WY NP GRTE 11(1) project, including sheet indexes, abbreviations, plan symbols, and project area details. It is approved for use as of 11/2001 with revisions up to 10/2014 and includes GPS coordinates, project numbers, and various construction notes. The plans cover reconstruction schedules, road alignments, culvert locations, and demolition sites within the Grand Teton National Park area. The document is digitally signed and dated November 11, 2025, indicating its current version and official approval.
PDF
PDF, High priority: read this first177 pages · specifications
HighAI Summary for WY NP GRTE 11(1) Roundabout Construction Plans Set 2 of 2: This document contains detailed construction plans and specifications for the WY NP GRTE 11(1) roundabout project, including site plans, curb layout plans, joint plans for various legs of the roundabout, and center island joint plans. The plans are dated between September and October 2025 and include technical details such as curb types, joint types, construction limits, and landscaping features. The document is part of a set (Set 2 of 2) and is intended to guide construction activities with precise measurements and material specifications.
PDF
PDF, High priority: read this first19 pages · justification-and-authorization
HighAI Summary for WY NPS GRTE 2020(1) Brand Name Justification Memo: This document dated September 8, 2024, is a Brand Name Justification & Approval memo for the Moose Wilson Road Phase 2 project under the Federal Highway Administration. It justifies the use of specific brand-name products essential to the Government's requirements, citing FAR 6.302-1 for exception to full and open competition. The memo details the brand-name products required, including cameras, sensors, power supplies, trash receptacles, wood treatment, and restroom vaults, explaining their unique qualifications and compatibility with the Park's IT infrastructure and cultural requirements. It confirms that the project will be solicited via full and open competition, with competitive pricing anticipated from contractors and suppliers.
PDF
PDF, High priority: read this first6 pages · q-and-a
HighAI Summary for WY NPS GRTE 2020(1) Moose Wilson Road Q&A 1-30-2026: This document is a Question and Answer (Q&A) file dated January 30, 2026, related to the WY NPS GRTE 2020(1) Moose Wilson Road and WY NP GRTE 11(1) Teton Park Road projects. It provides technical clarifications on concrete mix designs, reinforcement details, project specifications, and bid item inquiries. Several answers reference amendments to be issued, and some responses direct contractors to solicitation documents or standard plans. The Q&A addresses concerns about construction materials, project timelines, and specific bid items, ensuring bidders have critical technical information for proposal preparation.
PDF
PDF, High priority: read this first6 pages · q-and-a
HighAI Summary for WY NPS GRTE 2020(1) Moose Wilson Road Q&A Document: This document is a Question and Answer (Q&A) record for the WY NPS GRTE 2020(1) Moose Wilson Road and WY NP GRTE 11(1) Teton Park Road project. It contains technical clarifications and responses dated January 22 to January 28, 2026, addressing concrete mix designs, reinforcement details, bid item clarifications, construction specifications, and other project-related inquiries. Several answers reference forthcoming amendments (A001, A002) for unresolved issues. The document also provides links to related Google Earth files and instructions to follow solicitation documents for certain items. It serves as a critical communication tool for bidders to understand project requirements and resolve ambiguities before contract award.
PDF
PDF, High priority: read this first5 pages · q-and-a
HighAI Summary for WY NPS GRTE 2020(1) Moose Wilson Road Q&A Document: This document is a Q&A for the WY NPS GRTE 2020(1) Moose Wilson Road and WY NP GRTE 11(1) Teton Park Road project, dated January 22-28, 2026. It contains technical and general questions and answers related to concrete mix designs, reinforcement details, project specifications, and clarifications on bid items and construction requirements. Several answers reference forthcoming amendments (A001, A002) for unresolved issues. The document also provides references to specific sections of the project plans and solicitation documents, including contractor camp provisions, erosion control, and equipment specifications. It serves as a critical communication tool clarifying technical and procedural aspects for prospective contractors.
PDF
PDF, Low priority1 page · plan-and-profile
LowAI Summary for GRTE2020-1 Culvert Plan and Profile 31671: This document is a plan and profile sheet for a 24-inch pipe culvert at station 316+71, part of project GRTE 2020(1). It includes details such as slope stake limits, edge of pavement, mainline, existing ground elevations, invert elevations, and roadway section. The sheet is dated 29 March 2023 and references NPS PMIS No. 312456 and NPS Drawing No. 136/167343.
PDF
PDF, Low priority676 pages · report
LowAI Summary for GRTE_C6_RipReport - Road Inventory and Condition Assessment Grand Teton National Park: This document is the Cycle 6 Road Inventory and Condition Assessment report for paved routes in Grand Teton National Park, prepared by the Federal Highway Administration Eastern Federal Lands Highway Division Road Inventory Program (RIP). Dated May 2017, it details the inventory and condition of paved roads and parking areas using automated and manual inspection methods. The report includes historical context of the RIP and Pavement Management System, methodology, condition summaries, maps, and appendices. It supports pavement maintenance prioritization and infrastructure management for the National Park Service.
PDF
PDF, Low priority48 pages · report
LowAI Summary for Hazmat Survey Report for Barker-Davis Williams House: This document is a pre-demolition asbestos and hazardous materials survey report for the Barker-Davis Williams House in Moose, Wyoming, prepared by Jorgensen Associates, Inc. for the National Park Service. Conducted on October 28, 2020, the survey identifies the presence of asbestos-containing materials, lead-based paint, mercury-containing thermostats, and biological hazards such as rodent feces and dead birds. The report includes detailed findings, regulatory criteria, disposal considerations, and cost estimates for deconstruction and abatement. The purpose is to ensure compliance with EPA and OSHA regulations prior to demolition to prevent hazardous material release.
PDF
PDF, Low priority252 pages · other
LowAI Summary for Preliminary Plans for Moose Wilson Road Phase 2 Base Schedule WY NPS GRTE 2020(1): This document contains preliminary construction plans for the Moose Wilson Road Phase 2 Base Schedule project in Grand Teton National Park, Wyoming. It includes maps, designations, traffic data, construction specifications, and sheet indexes. The plans cover road reconstruction, utilities, grading, drainage, and pavement details. The document is prepared by the National Park Service and Western Federal Lands Highway Division, with project numbers and drawing references provided. It serves as a technical reference for the proposed project layout and construction requirements.
PDF
PDF, Low priority5 pages · other
LowAI Summary for WY NPS GRTE 2020 Moose Wilson Road Phase 2 and Teton Park Road Project Description: This document provides a detailed project description for the WY NPS GRTE 2020 Moose Wilson Road Phase 2 and WY NP GRTE 11 Teton Park Road – Moose To Taggart Lake Trailhead construction project. It includes scope of work such as reconstruction, utilities, grading, aggregate, asphalt pavement, minor concrete pavement, roadway obliteration, and site improvements over a project length of approximately 2.95 miles. The estimated price range is $20 million to $30 million with a tentative fixed completion date in Winter 2027. The document lists extensive construction requirements, earthwork, aggregate and base courses, asphalt pavements, rigid pavement, incidental construction, and traffic control details. It serves as a comprehensive technical description and schedule for the project located 15 miles north of Jackson, Wyoming in Teton County.
Update 2/02/2026: Amendment A003 and QA_2-02-2026_2.pdf posted to attachments.
Update 2/02/2026: QA_2-02-2026.pdf posted to attachments.
Update 1/30/2026: QA_1-30-2026.pdf posted to attachments.
Update 1/29/2026: Amendment A002 posted to attachments.
Update 1/28/2026: QA_1-28-2026.pdf has been posted to attachments.
Update 1/22/2026: Amendment A001 and QA_1-22-2026.pdf have been posted to attachments.
Project: WY NPS GRTE 2020(1), Moose Wilson Road Phase 2 and WY NP GRTE 11(1), Teton Park Road – Moose to Taggart Lake Trailhead Solicitation No.: 69056726R000005 See attachments for Request for Proposal (RFP), plans, phyiscal data files, and Brand Name/Sole Source Justification Memos.
THIS “TASK ORDER REQUEST FOR PROPOSAL” IS SOLELY FOR THE FOLLOWING CONTRACTS AND CONTRACTORS:
THIS PROJECT IS BEING ADVERTISED ON SAM.GOV TO ANNOUNCE THE UPCOMING PROJECT AND ASSIST POTENTIAL SUBCONTRACTORS BY PUBLICIZING OPPORTUNITIES. A PROPOSAL WILL ONLY BE ACCEPTED FROM THE ABOVE PRIME CONTRACTORS.
This information is also available on our website:
https://highways.dot.gov/federal-lands/business/construction-contracting/yellowstone-grand-teton
More opportunities from Department Of Transportation → 690567 Western Federal Lands Division