Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Wyndham Lighting

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans is proposing to install four luminaires along State Route 273 in Shasta County between post mile 14.77 and 15.0 to improve nighttime safety for pedestrians and cyclists by providing continuous lighting. The project includes replacing approximately 658 linear feet of median barrier, integrating conduit within the new barrier, and installing power via horizontal boring for about 175 feet from the median to an existing pedestal near Wyndham Way, with minor potholing to support the utility work. Excavation for luminaire footings will involve holes roughly two feet in diameter and depth, with a maximum excavation depth of four feet, disturbing about 0.095 acres of soil without removing any vegetation. Construction will be staged on the road shoulder and may require lane closures. The work will also involve removing three existing city of Redding light poles in the median prior to or during construction. All activities will occur within Caltrans’ existing right-of-way, with no need for temporary or permanent easements. Excess soil will be retained by the contractor, and no borrow sites are required. The project is expected to be completed within a single construction season over approximately 30 days. Caltrans has conducted coordination with relevant agencies and tribes, and no resource agency permits are anticipated based on the scope.

General Info

Install four luminaires on SR-273, replace median barrier, bury conduit, install power via boring, remove three poles, no easements needed.

Agency

California → Caltrans, District 2 - Redding

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

SR 273, Post miles 14.77 to 15.0, Redding, CA

Set-Aside

NONE

Documents

(1)

Wyndham Lighting - NOE_

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 2 - Redding
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 2 - Redding
Office AddressN/A
Contacts
Carolyn SullivanSenior Environmental Planner

Full Description

Show more
The California Department of Transportation (Caltrans), using State and federal funding, is proposing to install four luminaires, including other minor improvements on State Route (SR) 273 in Shasta County. The limits of work occur between post mile (PM) 14.77 and 15.0. The purpose of the project is to provide continuous lighting along the project limits, which would enhance the multimodal transportation network and improve public safety. The project is needed to reduce the potential for pedestrian and bike injuries along the subject section during nighttime hours. Project implementation includes luminaire installation and median barrier replacement. To facilitate luminaire installation, a ±2-foot-diameter by ±2-foot-deep hole would be excavated to accommodate the footing. In support of the lighting, conduit would be integrated internally into the proposed median barrier. To provide power, conduit would be installed through horizontal boring (±175 feet, ±4 feet deep) between the median and an existing pedestal located northeast of the intersection of SR 273 and Wyndham Way. Minor potholing would occur along the proposed boring alignment. To maintain public safety, approximately 658 linear feet of median barrier would be replaced. As part of median barrier replacement, supplemental paving would be performed. Approximately 0.095 acres of soil would be disturbed during project implementation; estimated maximum excavation depth would be four feet. No vegetation removal is proposed. Where applicable, project construction would be staged on the road shoulder. Lane closures may be necessary during construction. Right-of-Way The proposed work is expected to occur within the Caltrans’ right-of-way; no temporary construction easements are anticipated. Further, no permanent right-of-way take is anticipated. Staging Staging activities are expected to occur within Caltrans’ right-of-way. Disposal/Borrow Sites Excess soil would become the property of the contractor. No borrow sites are anticipated. Utilities Three city of Redding light poles occur within the median. These poles would be removed in advance of or concurrent with proposed construction activities. No other conflicts have been identified. Schedule The work would be completed in one construction season and would require approximately 30 days to complete. Consultation/Coordination Caltrans performed a records review, field surveys, and consultation/coordination with applicable agencies, tribes, and individuals. Permits Based on the current scope, the project would not be subject to resource agency permits.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract involves the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process system upgrades to remove per- and polyfluoroalkyl substances from surface water. The scope requires integrated engineering solutions to meet evolving regulatory standards for drinking water safety, with specialized focus on advanced filtration and extraction technologies tailored to the existing infrastructure at both sites. Work will include site-specific modifications to ensure seamless operational integration while maintaining continuous water service during implementation. This solicitation, issued by Pyramid Building & Engineering, Inc., is designated for Disadvantaged Business Enterprises under the Department of Transportation set-aside program and falls under NAICS code 237310 for Water and Wastewater Pipeline and Related Structures Construction. Proposals must be submitted by September 3, 2026, with primary point of contact John Garrison available for inquiries via phone or email. The project is located entirely within California, with no specified city or zip details provided in the public record, and all contractual obligations are tied to performance at the two designated treatment plants. Participation is open to qualified firms seeking to support critical public health infrastructure improvements in compliance with state and federal water quality mandates.
Pyramid Building & Engineering, Inc.

POSTED

about 5 hours ago

DEADLINE

in 26 days
View Details