Y--Big Bend Transformer Oil Containment Construction

Awarded
W9128F-15-B-0003Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Golf Club Green And Tee Box Renovation
Solicitation # 6209
Solicitation 6209 is for the comprehensive renovation of the Santa Barbara Golf Club in California, specifically focusing on the #10 Tee Box and the #13 Green. The scope of work includes releveling and expanding the #10 Tee Box to meet playability and drainage standards, reshaping the #13 Green through contouring and fine grading, and fully renovating the #13 greenside bunkers with new excavation, drainage, and liner placement. Technical requirements include the installation of USGA greens subsurface drainage, a 12-inch root zone mixture, and sodding with Centennial Bentgrass and Kikuyu grass. The project is expected to begin around November 2026 and must be completed within six weeks, with work permitted Monday through Friday from 7:00 a.m. to 5:00 p.m. Bidders must hold a valid California A - General Engineering or C-27 Landscaping contractor's license and submit their proposals via the PlanetBids portal by November 9, 2026. Award evaluation factors include the length and scope of manufacturer warranties and offered payment discounts. The contract mandates compliance with California prevailing wage laws, OSHA safety standards, and ADA regulations. Financial protections include a required payment bond for 100% of the bid total for contracts exceeding $25,000 and liquidated damages of $2,000 per calendar day for delays. Acceptance of the work is contingent upon the approval of the finished subgrade by the designer and the submission of all relevant warranty and guarantee documents.
Santa Barbara Golf Club

POSTED

about 6 hours ago

DEADLINE

in 10 days
NAICS: 237990
New
SLED
Henry H. Bradby Park Phase 1
Solicitation # 2027-7110-114
Solicitation 2027-7110-114 is an Invitation for Bid issued by the Isle of Wight County Parks and Recreation department for the Phase 1 construction of Henry H. Bradby Park in Smithfield, Virginia. The project involves the development of approximately 6.63 acres of a 51.67-acre county-owned parcel, with the remaining land designated as undisturbed open space. The scope of work includes initial site preparation, clearing, demolition, grading, and the installation of civil infrastructure such as drainage and stormwater management facilities. Key public amenities to be constructed include a gravel parking lot, playground, picnic shelter, basketball court, walking trails, site furnishings, and landscaping. All work must be substantially complete within 300 days of the notice to proceed, with final completion due 45 days thereafter. The project is funded through the National Park Service Land and Water Conservation Fund, making it subject to strict federal oversight, including Build America, Buy America Act material sourcing restrictions and compliance with various federal and state civil rights and disability acts. Bidders must provide a bid bond equal to five percent of the total bid value for projects exceeding 500,000 dollars. Award will be granted to the lowest responsive and responsible bidder, with evaluation factors including quality, qualifications, and conformity to specifications. Technical compliance is required under the 2018 Virginia Statewide Building Code, VDOT Road and Bridge Standards, and the Virginia Stormwater Management Handbook. Bids must be submitted via the designated Procurement Portal by November 16, 2026, at 3:00 pm.
Parks & Recreation

POSTED

about 6 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

Solicitation W9128F-15-B-0003 is a restricted small business construction project for the installation of transformer oil containment systems at the Big Bend Dam on the Missouri River in South Dakota. The project involves creating containment for four main unit transformers, two station service transformers, and one delta feeder transformer. The scope of work includes installing curbs, passive oil containment liners that solidify during catastrophic failures to protect the river from hydrocarbons, and six inches of fire quenching stone. Additional requirements include the installation of oil absorbing mats and non-shrink grout to seal gaps between concrete decks and transformer bases. The estimated construction cost is between 1,000,000 and 2,500,000 dollars. The selected contractor must commence work within 10 days of the notice to proceed and complete all tasks within 360 calendar days. Performance and payment bonds are required, and the contract includes provisions for liquidated damages if the project is not completed on schedule. Bidders must be registered in the System for Award Management database to be eligible for the award.

General Info

Contract Value

$466,700

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

NE, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

4 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Apr 17, 2015 to May 1, 2015. The notice description changed.

Deadline changed

Response deadline changed from May 1, 2015 to May 14, 2015.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
ContactsNo contacts available
OfficeOMAHA, NE, 68102-4901, USA
Office AddressOMAHA, NE, 68102-4901, USA
ContactsNo contact information available

Full Description

Show more
Federal Business Opportunities Information Date: 2015 February 02 SOLICITATION NO. W9128F-15-B-0003 On or about 18 March 2015, this office will issue Invitations for Bid for construction of the Transformer Oil Containment, Big Bend Dam, Missouri River, South Dakota. The solicitation will close on or about 17 April 2015. This solicitation is RESTRICTED TO SMALL BUSINESS PARTICIPATION. A tentative site visit date will be issued with the solicitation. DO NOT submit requests for plans and specifications to the site visit personnel listed above. See 'Obtaining Solicitation Documents' below. _______________________________________________________________________________ Project Description: (Approx. quantities) 1. Main Unit Transformer Oil Containment Big Bend has four (4) three-phase transformers located on the tailrace deck. The transformers are enclosed in concrete walls on three sides, with the downstream side open. The upstream wall is the powerhouse while the other two are firewalls. Each of the main unit transformers contains 14,530-gallons of oil and weighs 382,500-pounds. A curb will be placed on the downstream side of the powerhouse to provide enough containment to hold all of the transformer oil and a 25-year 24-hour storm event. A passive oil containment system will be placed in the lower section of each transformer vault. The passive liner will allow storm water to flow through while containing any hydrocarbons. Six-inches of fire quenching stone will then be placed on top of the liner to help extinguish puddle fires. Oil absorbing mats placed on top of the rock will be used to help collect small chronic leaks of the existing transformer to protect the life of the passive system. Stairs will be included to allow personnel to easily access the transformer vault. In the event of a catastrophic oil failure, the passive liner will solidify creating a water-tight barrier inside the vault. This will prevent any hydrocarbons from reaching the drain and being discharged into the river The existing transformer rails inside the transformer vault will be covered by the fire quenching stone. The existing curb cut for the rails on the downstream side of the vault will be filled with grout. Any future transformer work involving transformer movement will require the fire quenching stone and grout to be removed. 2. Station Service Transformer Oil Containment Big Bend has two (2) station service transformers located on the tailrace deck. The station service transformers are located against the powerhouse wall with the other three sides open to the atmosphere. Each of the station service transformers contains 1,080-gallons of oil and weighs 24,000-pounds. Curbs will be provided around the station service transformers. Station service transformer 2 will have its own containment area while station service transformer 1 containment will be combined with the delta feeder transformer. The curbing will be sized to contain all the oil in each transformer within the containment area plus a 25-year 24-hour storm event. The containment curb will not block storm water on the draft tube deck from reaching the existing drains. The valves at the base of the transformer will remain accessible for project maintenance. A passive oil containment system will allow storm water to flow through while containing all hydrocarbons. Theperimeter containment curb will have locations for storm water to flow out of the containment area at the low points near existing deck drains. The containment area will have six-inches of fire quenching stone placed on top of the liner to help extinguish puddle fires. In the event of a catastrophic oil failure, the passive liner will solidify creating a water-tight barrier inside the containment area. This will prevent any hydrocarbons from reaching the drain and being discharged into the river. 2.a. Oil Leakage The passive system will be attached to the station service transformers base with adhesive. This design will catch any leaks, except for those in the bottom of the tank. Leaks occurring in the bottom of the tank will bypass the oil containment system. However, the chances of a leak in the bottom of the tank are minimal. The tank base is a solid steel plate that is designed for skidding the transformer around. Major leaks are likely to occur from the oil coolers and piping above the base of the transformer. To help alleviate the chance that oil will get underneath the containment system, the gap between the concrete deck and transformer base will be filled with non-shrink grout. 3. Delta Feeder Transformer Oil Containment Big Bend has one (1) delta feeder transformer located on the tailrace deck near station service transformer 1. The delta feeder transformer is located against the powerhouse wall with the other three sides open to the atmosphere. The delta feeder transformer contains 483-gallons of oil and weighs 12,027-pounds. Delta feeder transformer containment will be combined with station service transformer 1. The curbing will be sized to contain all the oil of both transformers plus a 25-year 24-hour storm event. The containment curb will not block storm water on the draft tube deck from reaching the existing drains. A passive oil containment system will allow storm water to flow through while containing all hydrocarbons. The perimeter containment curb will have locations for storm water to flow out of the containment area at the low points near existing deck drains. The containment area will have six-inches of fire quenching stone placed on top of the liner to help extinguish puddle fires. In the event of a catastrophic oil failure, the passive liner will solidify creating a water-tight barrier inside the containment area. This will prevent any hydrocarbons from reaching the drain and being discharged into the river. The estimated construction cost of this project is between $1,000,000 and $2,500,000. _______________________________________________________________________________ The Contractor will be required to commence work within 10 days after notice to proceed and complete the work 360 calendar days after receipt of Notice to Proceed. Provisions will be included for liquidated damages in case of failure to complete the work in the time allowed. Performance and payment bonds will be required. Bonding documents including the power of attorney shall bear an original signature by an officer of the surety. Bidders (Offerors): Please be advised of on-line registration requirement for Representations and Certifications Application (ORCA) is now located in System for Award Management (SAM) database https://www.sam.gov/portal/public/SAM/. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective until one year from date of submission or update to SAM. Obtaining Solicitation Documents: Solicitation documents will be posted to the web via Federal Business Opportunities (www.fbo.gov). Find solicitation announcement in Fed Biz Opps (www.fbo.gov) 1. Use the 'Quick Search' to locate the project (by entering the solicitation number) or use the advanced search features offered in the 'Find Opportunities' (large arrow in the middle of the page) or use the 'Opportunities' tab followed by the 'Advanced Search' tab. 2. By using the 'login' feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted. 3. Once you have located your project, click on link to solicitation to view the project. Files may be downloaded from the column on the right side reading 'All Files' or from the 'Packages' tab. 4. If you want other vendors, sub-contractors or contractors to contact you, click on the 'Interested Vendors' tab and then 'Add me to Interested Vendors' link at the bottom of the page. Questions regarding contractual matters should be made to: Alex Mueller +1 (555) 000-0000. Telephone calls regarding Small Business matters should be made to: +1 (555) 000-0000. Telephone calls on contents of drawings and specifications should be made to the Project Manager at: +1 (555) 000-0000 or Specification Section at: +1 (555) 000-0000. Commander U.S. Army Engineer District, Omaha ATTENTION: CENWO-CT-C 1616 Capitol Avenue Omaha, NE 68102 4901

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 541990
New
Federal
Fort Campbell, KY - API 653 External Tank Inspection
Solicitation # W9128F27QA006
Solicitation W9128F27QA006 is a firm-fixed-price requirement issued by the US Army Corps of Engineers Omaha District for API 653 external above-ground storage tank inspections at Fort Campbell, Kentucky. The scope of work specifically covers facilities G7140 and H7140 and includes conducting a teleconference kick-off meeting, performing external tank and visual containment area inspections, and testing alarms and Automatic Tank Gauge equipment. The contractor is required to provide a certified API 653 Inspector and a Project Manager to ensure compliance with industry standards including API 653, API RP 575, NFPA 30, and NFPA 326. Key deliverables consist of draft and final reports for each facility along with completed API Std 653 checklists, with all work to be completed by March 20, 2027. This acquisition is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 541990. Proposals must be submitted as a single PDF document not exceeding five pages, excluding the price worksheet and administrative pages, and must be sent to Contracting Specialist Tony Manna and Contracting Officer Brent Bertrand by November 13, 2026. Award decisions will be based on the most advantageous offer, evaluating technical capability, inspector certifications, relevant project experience, and price reasonableness. Contractors must adhere to strict installation security requirements for personnel and vehicle access and comply with DFARS 252.204-7012 regarding the safeguarding of covered defense information.
All Other Professional, Scientific, and Technical Services

POSTED

1 day ago

DEADLINE

in 14 days
View Details
NAICS: 541330
New
Federal
USACE Omaha District - $249M Unrestricted Sentinel Construction Management Services (CMS) MATOC
Solicitation # W9128F26RA124
The USACE Omaha District is soliciting proposals for the Sentinel Construction Management Services (CMS) Multiple Award Task Order Contract (MATOC) under NAICS 541330. This unrestricted effort has a total estimated capacity of 249 million dollars, with the government intending to award four firm-fixed price Indefinite Delivery Contracts (IDCs). The contract supports the U.S. Air Force across the Northwestern Division, covering 15 states including Washington, Oregon, Idaho, Nevada, Utah, Montana, Wyoming, Colorado, North Dakota, South Dakota, Nebraska, Kansas, Iowa, Missouri, Minnesota, and Wisconsin. The performance period consists of a five-year base period with options extending the total duration up to seven years and six months. The scope of work involves providing professional, administrative, and management staff augmentation to oversee construction projects. Key responsibilities include performing Quality Assurance inspections per ER 1180-1-6, monitoring safety compliance according to EM 385-1-1, and managing project documentation through the Resident Management System or Construction Management Platform. Awards will be based on a best-value tradeoff process evaluating past performance, technical and management approach, key personnel resumes, small business participation, and cost. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) by November 10, 2026.
Engineering Services

POSTED

3 days ago

DEADLINE

in 11 days
View Details
NAICS: 237990
New
Federal
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Solicitation # W9128F27BA007
The Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2 project is a construction effort located along the left descending bank of Lake Sharpe near Big Bend, South Dakota. Managed by the USACE Omaha District, the project focuses on Reach 4 of the lake and involves the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path, and a 200-by-1,500-foot island in water up to three feet deep. Key technical requirements include the installation of a riprap revetment to protect against erosion and the planting of cottonwood trees and other culturally significant vegetation. These efforts are designed to create approximately 32 acres of riparian habitat and 5.17 acres of emergent wetland through tasks such as earth moving, grading, bank shaping, and topsoil placement. This procurement is a 100 percent Small Business Set-Aside under NAICS code 237990, with an estimated construction value between 10 million and 25 million dollars. The project is being solicited as a single-step sealed bidding process via an Invitation for Bid, with a required period of performance of 550 days following the Notice to Proceed. Bidders must be registered in the System for Award Management and submit their offers through the PIEE Solicitation Module. Additional requirements include the provision of performance and payment bonds and adherence to South Dakota Heavy and Highway wage determinations, with a specific note regarding a 4.5 percent Tribal Employment Rights Ordinance tax.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in about 1 month
View Details
NAICS: 541990
New
Federal
Vandenberg SFB Tank Inspection
Solicitation # W9128F27QA002
Solicitation W9128F27QA002 is a firm-fixed-price, non-personnel services contract for the inspection of Department of Defense fuel tanks at Vandenberg SFB, California. This 100 percent Service-Disabled Veteran-Owned Small Business set-aside under NAICS 541990 requires the contractor to perform API 653 internal inspections on aboveground storage tanks, specifically focusing on Tank 1702, a welded steel vertical Jet A storage tank. The scope of work includes fuel removal, disposal, tank cleaning, and the replacement of wiper seals. Contractors must provide a certified API 653 inspector and a project manager to ensure compliance with API 650, API 653, NFPA 30, and various Unified Facilities Criteria and military standards. The government will award the contract based on best value, evaluating technical capability, relevant experience in fuel tank draining and cleaning, and price reasonableness. Proposals are limited to five pages and must be submitted electronically by November 13, 2026. Key deliverables include draft and final inspection reports featuring non-destructive testing summaries, engineering calculations, and categorized repair recommendations. Due to the location on a military installation, all personnel must adhere to strict security vetting and base access requirements. The contract also includes an option for the removal and disposal of excess fuel up to 2,000 gallons per purchase order.
All Other Professional, Scientific, and Technical Services

POSTED

4 days ago

DEADLINE

in 14 days
View Details
NAICS: 237120
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, solicitation W9128F27RA045, is a design-build effort located at the Mather Army Aviation Support Facility in California. Managed by the USACE Omaha District, this firm-fixed-price contract is restricted as a total Small Business Set-Aside. The scope of work involves comprehensive repairs and upgrades to the AVGAS fueling system, including the installation of a sampling gauge hatch, a mechanical gauge, and an automatic tank gauge system. Physical improvements include recoating the tank exterior, replacing collision barriers, adding a full-length catwalk, and replacing audible and visual alarms. Additional requirements include repairing the remote containment basin drainage, replacing asphalt and concrete pavement in multiple areas, relocating a generator with a new concrete pad, and the demolition and replacement of the POL operation building. The project will be awarded using the Lowest Price Technically Acceptable (LPTA) method, with technical evaluations focusing on project experience—requiring three examples of projects exceeding 1 million dollars—and a detailed Gantt chart covering preconstruction, on-site construction, and post-construction phases. The projected period of performance is 365 days. Contractors must comply with the Davis-Bacon Act for prevailing wages and adhere to strict quality control standards, including a three-phase control process and final acceptance through punch-out, pre-final, and final inspections. Required deliverables include as-built drawings, and the contractor must provide performance and payment bonds within 10 days of award. Optional CLINs are included for the remediation of petroleum-contaminated soil, lead-based paint, and asbestos-containing materials.
Oil and Gas Pipeline and Related Structures Construction

POSTED

7 days ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS