Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of The Interior was posted on August 21, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--BLM-CO WRFO LO7 KIDS OHV TRAIL

Awarded
140L1725Q0025Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The Bureau of Land Management has issued a solicitation for the construction of Off-Highway Vehicle (OHV) trails designed specifically for children and beginner riders in the LO7 Open OHV Area near Meeker, Colorado. The objective is to create safe and engaging trails that introduce basic riding techniques, with course elements that gradually increase in complexity to help build confidence and skill. Features will include starts, stops, turns, and obstacle navigation such as small hills, rocks, and ramps, offering opportunities for the practice of both uphill and downhill maneuvers. This contract is a Total Small Business Set-Aside under NAICS 237990, with a rough order of magnitude between $25,000 and $100,000, and requires firms to be actively registered in SAM.gov. The performance period is set for October 1 to November 3, 2025, with work permitted on weekdays but not on federal holidays. The evaluation criteria prioritize technical capability and past performance over price. All small business categories, including disadvantaged, women-owned, service-disabled veteran-owned, HUBZone, 8(a), and Indian enterprises, are strongly encouraged to apply. The solicitation requires key documents to be completed and submitted, with bonding and compliance with Davis-Bacon wage requirements, and is administered by Contracting Officer Courtni Strickland. The deadline for responses is August 25, 2025.

General Info

Small business set-aside for constructing beginner OHV trails near Meeker, CO, due August 25, 2025.

Contract Value

$28,930

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

39�58'25.28"N, 107�55'35.61"W, Meeker, CO, USA

Set-Aside

SBA

Award Issued Date

Documents

8

140L1725Q0025 Amendment 0001

PDF, High priority: read this first2 pages · amendment
High

140L1725Q0025 - LO7 KIDS OHV TRAIL

PDF, High priority: read this first22 pages · rfq
High

140L1725R0005 - Kids OHV Trail Q&A

PDF, High priority: read this firstq-and-a
High

B04 Updated Basis of Award - LO7 OHV Trail 0001

PDF, High priority: read this first1 page · specifications
High

LO7 Kids OHV Course Specifications

PDF, High priority: read this first18 pages · specifications
High

LO7 Kids OHV Trail - Bid Schedule

PDF, High priority: read this firstbid-schedule
High

B11 Pre-Bid Attendance - 107 Kids OHV Course

PDF, Low priorityother
Low

LO7 Kids Track Map - White River Field Office

PDF, Low priority1 page · specifications
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jul 31, 2025 to Aug 3, 2025. The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Aug 18, 2025 to Aug 25, 2025. The notice title changed. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Colorado State Office
Contacts1 person available
OfficeLakewood, CO, 80225, USA
Office AddressLakewood, CO, 80225, USA
Contacts

Full Description

Show more
BLM-CO LO7 KIDS OHV TRAIL This amendment is to extend the response date to 08/25/2025 and to add the evaluation criteria. Technical capability and past performance are more important than price. No other changes were made. This is a solicitation announcement to construct safe and traversable Off-Highway Vehicle (OHV) trails for children and beginners within the Bureau of Land Management LO7 Open OHV Area Rio Blanco County, CO. LO7 Open OHV Area is located 4 miles South of Meeker Colorado. Socio-economic Categories: While this procurement remains a competitive Total Small Business Set-Aside, the BLM highly encourages and welcomes quotes from all sub-categories of small business such as Small Disadvantaged, Woman Owned, Service Disabled Veteran, HUBZone, 8a, and Indian Small Business Economic Enterprises. 1.1 PROJECT DESCRIPTION The objective of this project is to construct safe and traversable Off-Highway Vehicle (OHV) trails for children and beginners within the LO7 Open OHV Area. The design will incorporate various features, including basic riding techniques such as starting, stopping, and steering, along with obstacle navigation that includes small hills, rocks, and ramps. The course will progressively increase in difficulty to build confidence and competencies in young riders, as well as provide opportunities for practicing uphill and downhill maneuvers. 1.2 LOCATION LO7 Open OHV Area is located 4 miles South of Meeker Colorado. The Lat/Long of LO7 Open OHV Area is located at: 39'58'25.28"N -107'55'35.61"W The start of the -Kids Corner- trail is located at: 39'58'22.90"N, -107'55'28.37"W. The start of the -Beginner Plus- trail is located at: 39'58'23.62"N, -107'55'35.87"W. 1.3 WORK SCHEDULE Work is not allowed on Federal holidays. Work shall occur Monday through Friday. Period of Performance: 10/01/2025-11/03/2025. Rough Order of Magnitude - Between $25,000 and $100,000. Basic Contracting Requirements: 1. Active Registration - www.sam.gov - check it now please. Updates and registrations have been taking longer than they used to due to the transition from the DUNS number to the UEI. If having issues, don't pay anyone. Free assistance is available at your local PTAC - https://www.aptac-us.org/ 2. Invoicing and Payment - www.ipp.gov - 14 day prompt pay with progress payments 3. FAR Part 13 - Simplified Acquistions 4. FAR Part 36 - Construction Provisions and Clauses 5. Davis Bacon Act Wages for Rio Blanco County, CO 6. Total Small Business Set-Aside for NAICS 237990 (Other Heavy and Civil Engineering Construction)- Size Std: $45M 7. Bid, Performance and Payment Bonding 8. Type of Contract - Firm Fixed Price 9. Basis of Award - Price and other Factors Minimum Requirements for Responsive Quote: 1. Filled in, priced, dated and signed SF1442 with acknowledgement of all amendments. 2. Schedule B filled in with prices. 3. Technical Response per Section L and M. 4. Email items 1-3 above to the POC no later than the solicitation close date. Primary POC: Contracting Officer Courtni Strickland contact@example.gov

More opportunities from Department Of The Interior → Colorado State Office

Same awarding agency

NAICS: 236220
New
Federal
Y--BLM-CO GAOA UFO MPLC WAREHOUSE IMPROVEMENT
Solicitation # 140L1726R0001
Solicitation 140L1726R0001 is a Firm Fixed Price construction project for warehouse improvements at the Montrose Public Lands Center in Montrose, Colorado. The scope of work includes asbestos abatement, bathroom remodeling, flooring replacement, installation of a new rooftop heating and cooling unit, and the replacement of a manual overhead door with an electric one. Additional requirements involve upgrading luminaires and electrical outlets, maintaining the metal roof, repairing existing overhead doors, and replacing a photovoltaic inverter. The project is a 100% Total Small Business Set-Aside under NAICS 236220, with a performance period scheduled from November 16, 2026, to May 30, 2027. The contract is governed by FAR Part 15 and FAR Part 36, with award based on Best Value using an acceptable/unacceptable rating for technical approach, experience, and past performance. Contractors must comply with Davis-Bacon Act wages for Montrose County and maintain active registration in SAM.gov. For contracts exceeding 150,000 dollars, 100% performance and payment bonds are required, and a bid guarantee of 20% of the bid price must be submitted. Invoicing is processed electronically through the Invoice Processing Platform with 14-day prompt pay and progress payments. The prime contractor is required to self-perform at least 15% of the contract value, excluding materials.
Commercial and Institutional Building Construction

POSTED

7 days ago

DEADLINE

in 1 day
View Details
NAICS: 237990
Federal
B--GUSG HABITAT HYDRO-LOGIC RESTORATION 202
Solicitation # 140L1726R0010
Solicitation 140L1726R0010 is a total small business set-aside construction contract issued by the Department of the Interior's Colorado State Office. The project focuses on hydrologic restoration to benefit the endangered Gunnison sage-grouse in the Crawford, Colorado area. The primary objective is to improve drainage on approximately 7.75 miles of rural roads by installing 204 rolling dips and associated lead-out ditches. These structures are designed to redirect surface water off roadways and onto adjacent sagebrush vegetation to mimic natural hydrologic flow. Construction is strictly limited to a work window between August 30, 2027, and October 22, 2027, although the overall period of performance extends through October 29, 2027. The government will utilize a best-value tradeoff award method, weighing price equally against the combined factors of technical approach, past performance, and schedule. Technical requirements are stringent, requiring rolling dips to be constructed at approximately a 30-degree angle with a cross slope between 4% and 8%, and lead-out ditches not to exceed 57.5 feet in length. Performance is monitored via a Quality Assurance Surveillance Plan, with a 95% acceptance threshold for inspected structures and zero tolerance for disturbances in identified avoidance zones. The contract is subject to Davis-Bacon Act wage determinations and requires contractors to maintain liability insurance and provide resumes for key personnel demonstrating significant experience in project planning and well installation.
Other Heavy and Civil Engineering Construction

POSTED

9 days ago

DEADLINE

in 5 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS