Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on August 10, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--Design-Build Contract for Engineer Research Development Center (ERDC), Environmental Office Building, Vicksburg, MS

Awarded
W912EE-09-R-0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236210
New
Federal
F-15EX 8-Bay Maintenance Hangar Complex-Industry Day
Solicitation # W50S8527H1CU0
The National Guard Bureau is seeking market intelligence for the construction of an aircraft maintenance hangar complex at Selfridge Air National Guard Base in Harrison Township, Michigan. This project supports 21 Primary Aircraft Authorization F-15 EX aircraft and is estimated to have a magnitude between 150 million and 200 million dollars. The scope includes the demolition of buildings 3, 5, 117, and 120, with new parking constructed in the footprints of buildings 117 and 120. The construction may be executed in three phases: Hangar 1, a 2-bay corrosion control and fuel cell hangar; Hangar 2, a 4-bay maintenance hangar; and Hangar 6, a 2-bay munitions and training facility. The project also requires necessary utility and infrastructure upgrades. The government is considering a fixed-price agreement utilizing an Other Transaction Agreement under the authority of 10 U.S.C. 2808a, with funding potentially provided in annual phases of approximately one-third of the total cost. Technical requirements include compliance with DoD antiterrorism and force protection standards, adherence to Air Force and base design standards, and specialized foundations to meet flood plain requirements. Design is anticipated to be 100 percent complete by early 2027. This notice is for planning purposes only and is not a formal solicitation. Interested firms under NAICS code 236210 must provide company details, bonding capacity, and evidence of experience with aviation facilities and constrained-site construction to the designated points of contact by the response deadline of December 1, 2026.
W7NF Uspfo Activity Miang 127

POSTED

1 day ago

DEADLINE

in about 1 month
NAICS: 236210
New
SLED
Facilities & Parks New Supply Warehouse Building
Solicitation # ITB FM 04-27
The Board of County Commissioners of Okaloosa County, Florida, is soliciting bids under ITB FM 04-27 for the construction of a new 9,000 square foot metal supply warehouse for the Facilities and Parks Department located at 5489 Old Bethel Road in Crestview. The project involves comprehensive site preparation and construction, including the installation of energy-efficient HVAC systems, electrical and plumbing work, and telecommunications wiring. All work must comply with the 2023 8th Edition Florida Building Code, ADA standards, and OSHA regulations, with specific structural requirements to withstand 160 MPH ultimate wind speeds. A fire alarm system is explicitly not required for this project. Bids must be submitted electronically via OpenGov by November 4, 2026, at 3:00 pm CST. The contract will be awarded to the responsive and responsible vendor with the lowest bid, though the County reserves the right to negotiate the most advantageous agreement. The selected contractor must provide a dedicated project manager and furnish both bid and performance bonds. The project timeline is 12 months from the notice to proceed. Payment will be processed through the County Finance Office in accordance with the State of Florida Local Government Prompt Payment Act, contingent upon annual appropriation. For projects involving federal grant funding, contractors must be registered in SAM.gov and comply with Buy America and Trafficking Victims Protection Act requirements.
Facilities & Parks

POSTED

6 days ago

DEADLINE

in 6 days

AI Contract Overview

Show more

This procurement is a competitive 8(a) design-build contract for a new office facility for the Environmental Laboratory at the Engineer Research and Development Center in Vicksburg, Mississippi. The project has a target ceiling of 16 million dollars and involves the construction of a state-of-the-art building of approximately 70,000 square feet to house 289 employees. The facility must be designed to promote organizational unity and achieve LEED Gold certification, incorporating sustainable practices and a campus-like environment with associated parking and landscaping. The selection process is divided into two phases. Phase I is a pre-qualification stage where two to five contractors will be selected based on criteria such as project organization, experience, and financial capacity. Phase II allows these qualified firms to submit preliminary designs and cost proposals, with the final award based on qualifications, technical quality, and price. Unsuccessful Phase II offerors who meet technical requirements will receive a 25,000 dollar stipend. Competition is limited to 8(a) firms within the SBA Mississippi District Office service area and firms located in Louisiana, Tennessee, Alabama, and Georgia.

General Info

Contract Value

$16,435,264.04

NAICS

236210 - Industrial Building Construction

Place of Performance

MS, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist Vicksburg
ContactsNo contacts available
OfficeVICKSBURG, MS, 39183-3435, USA
Office AddressVICKSBURG, MS, 39183-3435, USA
ContactsNo contact information available

Full Description

Show more
THIS PROCUREMENT IS BEING ISSUED UNDER THE COMPETITIVE 8 (A) PROCEDURES. COMPETITION WILL BE LIMITED TO 8 (A) FIRMS LOCATED WITHIN THE SURROUNDING GEOGRAPHICAL AREA SERVICES BY THE SBA-MISSISSIPPI DISTRICT OFFICE AND FIRMS WITHIN LA, TN, AL AND GA. The target ceiling for contract award for design and construction is $16,000,000.00. The Government cannot guarantee that additional funds can be made available for award. Offerors are under no obligation to approach this amount. This project is for the Design and Construction of an office facility consisting of approximately 70,000 square feet of office, conference and general use space for the Environmental Laboratory (EL) at the Engineer Research and Development Center (ERDC) located in Vicksburg, Mississippi. The Design-Build process will have two distinct phases. Phase-I will be the pre-qualification process, where the Government will select 2 to 5 Design-Build Contractors on the basis of Project Organization and Personnel, Offeror's Experience and Resource Commitment, Management Control Systems, Past Performance, Management/Technical Compliance Certification, and Financial Capacity. The elements are listed in descending order of importance with Project Organization and Personnel being the most important and the remaining elements becoming increasingly less important. Only the selected Design-Build Contractors will then qualify for the Phase-II of the process. In Phase-II of the procurement procedure, offerors will be given the opportunity to offer their preliminary design and cost proposals. Final selection and basis for award of the design-build contract will be on the basis of Qualifications, Technical Quality, Price, and Other Salient Factors considered to be in the Government's best interests. The elements are listed in descending order of importance with Qualifications being the most important and the remaining elements becoming increasingly less important. A stipend in the amount of $25,000.00 will be paid to all unsuccessful Phase II offerors whose technical proposal meets the solicitation requirements. No stipend will be paid to any offeror that withdraws from the competition prior to award. This is not a low bid award project. If awarded the contract, the offeror shall complete the design and construction documents and construct the facility in compliance with these completed requirements. The new building will consist of providing individual office space accommodating 289 employees with capability for 25 percent expansion. The building could be two or three stories and shall be sited to increase visibility and impact from the initial approach to the building. The D-B Contractor shall design the new building with parking, sidewalks, landscaping, etc. for a campus-like environment. The new building shall complement other structures in the area around the building. However, design and construction creativity and innovation is encouraged. Environmental Laboratory (EL) of the Engineer Research and Development Center (ERDC) has several branches currently housed in separate locations on the ERDC compound. This project is to relocate all branches within the EL to a single building. Personnel will be housed in the new building that will be developed to promote organizational unity, mission congruence, and esprit de corps. The new construction is to be state of the art, cutting edge technology, with a positive first impression of the facility. The facility should communicate that this is a top Research & Development (R & D) facility at this location in a way that promotes group identity and pride, complements recruitment and supports staff retention. To accomplish this, the building shall be designed and constructed so that the building facilitates and encourages interaction among all EL personnel, and provides equal access by personnel in all of the departments. The project shall be designed with the intent of maximizing the use of sustainable design and development practices. The Design-Build contractor shall adhere to green building rating standards of the Leadership in Energy and Environmental Design (LEED) to achieve GOLD certification as defined by USGBC. A LEED Accredited Professional will be a mandatory team member. An ultimate goal is to submit the new building for environmental awards at the Army level or higher. The building shall be classified as a Primary Gathering Building. If the conventional construction stand-off distances, as defined by US Army standards, are provided, conventional construction may be used for the building without a specific analysis of blast effects. Plans and Specifications will be available on the Federal Business Opportunities (FBO) Web Page at http://www.fedbizopps.gov/. Offerors may register on the Interested Vendors List (IVL) at http://www.2fbo.gov/ and retrieve an IVL from the same location. All technical inquiries and questions relating to W912EE-09-R-0001 are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet. Compact disc and hardcopies will not be available. Offerors should check often for changes (Amendments). Issue date on or about November 10, 2008. Phase I of the Request for Proposal Due on or about December 11, 2008. The due date for Phase II of the Request for Proposal will be determined after evaluation/selections have been made for Phase I. FUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS ACQUISITION. NO CONTRACT AWARD WILL BE MADE UNTIL APPROPRIATED FUNDS ARE MADE AVAILABLE.

More opportunities from Department Of Defense → W07V Endist Vicksburg

Same awarding agency

NAICS: 561210
New
Federal
Operation and Maintenance of Arkansas Lakes Project
Solicitation # W912EE26RA015
Solicitation W912EE26RA015 is a 100% total small business set-aside procurement issued by the U.S. Army Corps of Engineers, Vicksburg District, under NAICS code 561210. The contract is a Firm Fixed Price Indefinite Delivery Indefinite Quantity (IDIQ) vehicle intended for the operation, maintenance, and repair of government-owned facilities and equipment at Lake Ouachita, Lake Greeson, and DeGray Lake in Southwest Arkansas. The scope of work is comprehensive, covering janitorial and custodial services, mowing and landscaping, dumpster and waste disposal, heavy equipment repair, erosion control, and emergency debris removal following natural disasters. The contract structure consists of a base ordering period, four option years, and a final six-month option, with a minimum guarantee of 1,500 dollars and a task order maximum of 9 million dollars. The government will award the contract based on a best-value tradeoff process, prioritizing technical approach, staffing, and management approach as the most important factor, followed by past performance, with price being the least significant factor. Proposals must be submitted in three separate volumes and adhere to strict formatting and page limits. Key requirements include the designation of a Project Superintendent as key personnel, compliance with the EM 385-1-1 Safety Manual, and adherence to Cybersecurity Maturity Model Certification (CMMC) standards. Following several amendments to refine the scope of work and bid schedules, the final response deadline has been extended to November 2, 2026.
Facilities Support Services

POSTED

1 day ago

DEADLINE

in 4 days
View Details
NAICS: 332311
New
Federal
Arkabutla Lake Water Plant Rehab and Pre-fabricated Metal Building Installation
Solicitation # W912EE27QA002
Solicitation W912EE27QA002 is a request for quotes from the U.S. Army Corps of Engineers, Vicksburg District, for a turn-key rehabilitation project at the Arkabutla Lake Water Plant in Hernando, Mississippi. The project requires the abandonment of an old well and the installation of a 30 by 50 foot pre-fabricated metal Red Iron open span building to protect a newly installed well. The scope of work includes comprehensive plumbing installations meeting AWWA specifications, the sandblasting and multi-coat painting of a potable water tank using Tnemec and urethane systems, and electrical upgrades compliant with 2020 NEC requirements, including a 200-amp circuit breaker and pump control panel. The government intends to award one firm-fixed-price contract to the lowest priced quote that is determined to be technically successful. Evaluation factors include the contractor's methodology for well abandonment, coating specifications, electrical compliance, and the provision of PE-stamped building drawings and staff licensing. While originally a small business set-aside, Amendment One updated the set-aside type to unrestricted and extended the response deadline to November 6, 2026. All work must be completed within 120 calendar days of the award. Contractors must comply with DoD item unique identification standards and cybersecurity requirements, including CMMC and safeguarding of covered defense information.
Prefabricated Metal Building and Component Manufacturing

POSTED

4 days ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
Federal
CONCORDIA PARISH, LOUISIANA; FC/MR and T, WBMRL; LEVEE, ENLARGEMENT AND BERMS; UPPER LAKE CONCORDIA - VIDALIA, ITEM 367-R
Solicitation # W912EE27RA001
Solicitation W912EE27RA001 is a firm fixed price construction project issued by the US Army Corps of Engineers, Vicksburg District, for levee enlargement, the construction of seepage berms, and temporary access roads in Concordia Parish, Louisiana. The project, identified as Item 367-R, has an estimated value exceeding 10 million dollars and a performance period of 440 calendar days from the date of the Notice to Proceed. This procurement is a total small business set-aside under NAICS code 237990 and is restricted exclusively to FY 25 MATOC contract holders for Mississippi River Levees, Construction of Levee Enlargements and Berms. Key technical requirements include adherence to 2013 ADA Standards, Davis-Bacon Act labor standards, and NIST SP 800-171 cybersecurity protocols. The scope involves demolition and structure removal, embankment work, and environmental protection features, with quality managed through a three-phase control process and daily CQC reports. Progress payments must be processed via the Resident Management System Contractor Mode. Following Amendment 0001, which revised specifications for demolition and structure removal, the proposal submission deadline has been extended to November 13, 2026, at 1400 CST.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in 15 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS