Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on August 3, 2007. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y -- JACOB LAKE CAMPGROUND REHABILITATION

Awarded
IFB-AG-94TZ-S-07-0026Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The Jacob Lake Campground Rehabilitation Project, managed by the Department of Agriculture's Western Zone, involves extensive infrastructure upgrades at the Kaibab National Forest in Arizona. The scope of work includes the pulverization of existing roads and the construction of new roads, parking areas, and spurs featuring cement treated AB surfacing. Additionally, the project requires the installation of new water, sewer, and electrical distribution systems, the placement of up to four government-furnished double vault masonry CXT toilet buildings, and the construction of concrete sidewalks, tent pads, and use pads. The contractor is also responsible for removing eight existing vault toilet holdings and up to two flush toilet buildings. This contract, identified as IFB-AG-94TZ-S-07-0026, has a government cost estimate between 1,000,000 and 5,000,000 dollars with a performance period of 210 calendar days. The project includes two additive bid items and is located adjacent to Jacob Lake, AZ. Administrative oversight is provided by the Western Zone Contracting office in Phoenix, with Alan J. Zero serving as the Contract Officer.

General Info

Contract Value

$1,255,787.5

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

AZ

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

6 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Jul 10, 2007 to Jul 12, 2007.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Western Zone
Contacts2 people available
OfficePHOENIX, AZ, 85006, USA
Office AddressPHOENIX, AZ, 85006, USA
Contacts
Elbert H. HuntProcurement Assistant
Alan J. ZeroContract Officer

Full Description

Show more
THIS SUPERCEDES PREVIOUS PRE-SOLICITATION NOTICE Jacob Lake Campground Rehabilitation Project, Kaibab National Forest: the project consists of obliteration/pulverization of existing roads, construction of new roads, spurs and parking areas, cement treated AB surfacing of all roads, parking spurs and parking areas, installation of up to four double vault masonry CXT violet buildings (furnished by the government), concrete sidewalk, installation of new sewer distribution system, installation of new water distribution system, installation of new electrical distribution system, construction of tent pads and use pads, installation of campsite amenities and obliteration and removal of eight existing vault toilet holdings and up to two flush toilet buildings and specified campsite amenities. Project has two additive bid items. Contract time 210 calendar days. This solicitation will be available on or about June 7, 2007. Project is located 3.5 hours from Flagstaff, AZ. Head north on US-89 ALT. Take US-89 ALT to Jacob Lake, AZ. The site is located adjacent to Jacob Lake, AZ. Driving time from Fredonia, AZ is approximately 45 minutes. Take US-89 ALT southeast to Jacob Lake, AZ. The site is located adjacent to Jacob Lake, AZ. A prebid showing will be scheduled. Refer to solicitation for time, date and location of prebid tour. Government estimate of project is between $1,000,000 and $5,000,000 Point of Contact: Alan Zero, Western Zone Contracting located on Tonto National Forest, 2324 E. McDowell Rd, Phoenix, AZ 85006, phone # +1 (555) 000-0000.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS