Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Z -- Pack River Bridge & Road Flood Repair

Awarded
AG-0281-S-07-0042Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves flood damage remediation at three locations within the Pack River Drainage, approximately 12 miles north of Sandpoint, Idaho, along Upper Pack River Road #776 off US Highway 95 North. The project scope includes raising the existing road grade with imported material, installing culverts, resetting a concrete bridge to its original grade, constructing a cast-in-place foundation under one end of the bridge, rebuilding a flood-damaged road section, removing a timber bridge, and reshaping stream banks. The project is managed by the USDA Forest Service’s Sandpoint Ranger District in Bonner County, with designated contracting officers Fred A. Fischer and Larry Shepard providing oversight. The contract offers two performance periods: Option 1 starts on September 10, 2007, and must be completed by November 10, 2007; Option 2 begins May 10, 2008, with a completion deadline of July 15, 2008. A pre-bid tour is planned, with solicitation award expected by July 23, 2007. The estimated contract value ranges between $100,000 and $250,000. The project falls under NAICS code 237990 for heavy and civil engineering construction, and the contracting activity is based out of the USDA Forest Service office in Coeur d'Alene, Idaho.

General Info

Flood damage remediation at Pack River, Idaho; road, bridge, culverts work; USDA Forest Service contract.

Contract Value

$241,343.3

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Sandpoint Ranger District1599 Hwy 2, STE# 110 Sandpoint, ID 83864-9509, ID, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Forest Service
Contacts1 person available
OfficeCOEUR D ALENE, ID, 83815, USA
Office AddressCOEUR D ALENE, ID, 83815, USA
Contacts
Idaho Panhandle National Forests

Full Description

Show more
Sandpoint Ranger District, Bonner County, Idaho. This project is for the remediation of flood damage at three sites in the Pack River Drainage. Sites consists of raising the existing road grade using imported material and installing culverts, re-setting existing concrete bridge to original grade, constructing cast-in-place foundation under one end of bridge, rebuild section of flood damaged approach road, removing timber bridge and re-shaping stream banks. The project is located approximately 12 miles north of Sandpoint, Idaho on US Highway 95 North on Upper Pack River Road # 776. The Contracting Officer Fred A. Fischer, +1 (555) 000-0000, or Larry Shepard +1 (555) 000-0000. Project has 2 performance periods Options Option 1: Contract time will start September 10, 2007 and must be completed by November 10, 2007. Option 2: Contract time will start May 10, 2008 and must be completed July 15, 2008. A Pre-Bid Tour is planned and will be announced. Estimated Price Range between $100,000 and $250,000. Solicitation will be awarded by approximately July 23, 2007.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 21 days
View Details

More opportunities from Department Of Agriculture → USDA Forest Service

Same awarding agency

NAICS: 621111
New
Federal
Jacobs Creek JCC Medical Services
Solicitation # 1282A727Q0002
Solicitation 1282A727Q0002 is a Request for Quotation issued by the USDA Forest Service for on-site medical services at the Jacobs Creek Job Corps Center in Bristol, Tennessee. This firm-fixed-price contract is 100% set aside for small businesses under NAICS code 621111. The scope of work requires licensed medical professionals, such as Physicians, Nurse Practitioners, or Physician Assistants, to provide basic health services including examinations, assessments, treatment, immunizations, and prescription issuance. Services are typically required one to two days per week, Monday through Friday, from 8 am to 5 pm, totaling 400 hours per year. The contract structure consists of a base year running from January 11, 2027, to January 10, 2028, with four one-year options and a final six-month extension. Award will be based on best value, with technical capability and past performance weighted more heavily than price. To be considered responsive, offerors must submit a completed Quoter’s Questionnaire, current resumes for key personnel, unrestricted medical licenses, DEA registrations, and proof of medical liability insurance of at least 1 million dollars. All services must comply with OSHA, HIPAA, and American Medical Association guidelines. Invoices are to be submitted monthly via the Invoicing Processing Platform. Quotations must be submitted in Word or PDF format to the designated point of contact by 5:00 PM Eastern Time on November 17, 2026.
Offices of Physicians (except Mental Health Specialists)

POSTED

about 12 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237310
New
Federal
GAOA Brainard Lake Recreation Area Deferred Maintenance
Solicitation # 1240LT27Q0004
Solicitation 1240LT27Q0004 is a Request for Quotation issued by the USDA Forest Service for deferred maintenance and accessibility improvements at the Niwot Picnic Trailhead within the Brainard Lake Recreation Area near Ward, Colorado. This project, estimated between $100,000 and $250,000, is a 100% Total Small Business Set-Aside under NAICS 237310. The scope of work includes demolishing existing timber parking barriers and retaining walls, constructing new rock retaining walls and timber steps, creating accessible compacted aggregate trails, renovating and constructing picnic sites, and revegetating disturbed areas. The contractor must commence work within 10 calendar days of the notice to proceed and complete all tasks, including final cleanup, within 120 calendar days. The contract is awarded based on the lowest price technically acceptable criteria, evaluating the offeror's technical approach and past performance on at least three similar projects completed within the last three years. Required submissions include a signed SF1442, a priced Schedule of Items, a technical proposal, and bid guarantees. Key compliance requirements include adherence to Davis-Bacon wage determinations, OSHA safety regulations, and MUTCD standards for signage. Performance and payment bonds are required, and the contractor must submit a company-approved accident prevention plan and evidence of insurance before beginning on-site work. Inspection and final acceptance are governed by FAR 52.246-12.
Highway, Street, and Bridge Construction

POSTED

about 12 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 238990
New
Federal
GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF
Solicitation # 1240BH26R0013
Solicitation 1240BH26R0013 is a request for proposals issued by the USDA Forest Service for the rehabilitation of the Blanchard Springs Caverns Tunnel in the Ozark-St. Francis National Forest, Arkansas. This project is a 100% small business set-aside under NAICS 238990 with an estimated magnitude exceeding 10 million dollars. The scope of work encompasses comprehensive infrastructure repairs and safety upgrades for the Dripstone and Discovery Trail, including structural stabilization of tunnel entrances and exits, masonry repairs, and the installation of ground support using rock bolts and shotcrete. Additionally, the contractor will replace air lock and security doors, suspended ceiling systems, lighting and distribution components, safety handrails, and the mine phone system. The contract requires a qualified contractor to begin work within 10 calendar days of the notice to proceed, with a total performance period of 426 calendar days. Award will be based on the best value tradeoff process, evaluating price, technical approach, and past performance, specifically requiring three similar projects completed within the last three years. Key requirements include the use of specialized shotcrete and earthwork contractors with at least five years of experience, adherence to Davis-Bacon prevailing wage rates, and compliance with Buy American and ADA standards. Proposals must be submitted as separate PDF files, including a signed SF1442, a price proposal, a technical proposal, and bid guarantees, with a final submission deadline of October 29, 2026.
All Other Specialty Trade Contractors

POSTED

3 days ago

DEADLINE

in about 21 hours
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS