This Government Contract opportunity from Department Of Defense was posted on July 18, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--Missouri River Recovery Program for Construction, 100% HUBZone Set Aside Multiple Award Task Order Contract (MATOC); Gavins Point Dam, SD to Missouri River near St. Louis, MO

Awarded
W9128F-08-R-0025Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Construction of The Recharge Master Plan Update (RMPU) Basin Improvements Project - Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-rmpu-basin-improvements-project-montclair-basin-0
The Recharge Master Plan Update Basin Improvements Project, managed by Granite Construction Company, involves the construction of two drop inlet diversion structures within the 25-foot-wide concrete San Antonio Creek Channel in Montclair, California. The scope of work includes excavating 8 to 10 feet below the channel floor, installing steel debris grates, and fitting wall-mounted steel gates on the east sides of the structures. Additionally, the project requires the installation of 4-foot-diameter discharge pipelines leading to Montclair Basins 2 and 3, which will be covered by 3 feet of soil and terminate in concrete outlet structures designed for flow dissipation. The project also encompasses the delivery of full electrical, instrumentation, and SCADA integration to manage gate actuation. Programming for these systems is strictly limited to approved integrators, specifically Technical Systems, Inc. or E Technologies Group. This solicitation is categorized under NAICS code 237990 and includes a Disadvantaged Business Enterprise set-aside. Interested parties should coordinate with the primary point of contact, Andrew Burk, regarding the submission requirements.
Granite Construction Company

POSTED

about 4 hours ago

DEADLINE

in about 21 hours
NAICS: 237990
New
SLED
6893
Solicitation # 49749
The Massachusetts Port Authority is soliciting proposals for the advance procurement, furnishing, and delivery of aviation electrical equipment for Logan International Airport in Boston, Massachusetts. The scope of work specifically requires the provision of L-868 Class IB stainless steel light bases (Size B, 12-inch diameter), as well as extensions, spacer rings, and 3/4-inch thick high-tensile machine steel flange rings with pavement dams. All equipment must comply with FAA Advisory Circulars 150/5345-53D and 150/5345-42K. Deliveries must be made to the Massport Central Stockroom no later than February 1, 2027, with a requirement for the supplier to provide at least seven calendar days of advance notice prior to shipment. Award selection is based on the best interest of the Authority, focusing on the responsiveness, capability, and responsibility of the proposer rather than solely on the lowest cost. As an Airport Improvement Program project, the contract is subject to extensive federal regulations, including Buy American preferences, Davis-Bacon wage requirements, and Civil Rights Title VI nondiscrimination assurances. Additionally, contractors must adhere to the Occupational Safety and Health Act of 1970, the Federal Fair Labor Standards Act, and specific prohibitions regarding certain telecommunications and video surveillance equipment. Proposers are required to submit unit pricing via Bid Express and provide necessary certifications regarding tax delinquency and felony convictions.
Massachusetts Port Authority - Goods & Services

POSTED

about 4 hours ago

DEADLINE

in 7 days
NAICS: 237990
New
SLED
Gonyea Playfield
Solicitation # 2026-MPW-244
The Gonyea Playfield project, solicitation number 2026-MPW-244, is a community park improvement initiative for Pierce County Parks and Recreation in Parkland, Washington. The scope of work includes the construction of an inclusive play area, a nature play area, basketball courts, a perimeter loop path, flexible lawn areas, and a comfort station. Additional requirements involve stormwater management, utility and right-of-way improvements, site furnishings, signage, and landscape enhancements. The project is estimated at 3,390,000 dollars for the base bid and 1,385,000 dollars for additive alternates, which include a picnic shelter, skate spot, roly poly, site irrigation/trees, and right-of-way work. The contract will be awarded to the responsible bidder with the lowest responsive bid. Bids were due by November 18, 2026, and must have been submitted via the OpenGov Procurement Portal with a 5 percent bid bond. The successful contractor is required to provide a 100 percent payment and performance bond. Performance timelines mandate substantial completion of all base and alternate bid work within 275 calendar days of the Notice to Proceed, with final completion and acceptance required within a total of 305 calendar days. Compliance requirements include adhering to Washington State prevailing wage laws and ensuring that at least 15 percent of labor hours are performed by apprentices. The contractor must follow strict safety and environmental protocols, including the Pierce County Hot Work Procedure, ADA requirements for walkways, and specific hazardous material handling and disposal procedures for asbestos, lead, PCBs, and mercury. Quality assurance is managed through a mandatory testing and inspection program, with the contractor providing three days' notice to the County before work is ready for inspection.
Parks and Recreation

POSTED

about 7 hours ago

DEADLINE

in 15 days
NAICS: 237990
New
SLED
9585 - Castle Creek Channel Improvements at Warner Park
Solicitation # 9585
The City of Madison is soliciting bids for Contract 9585, Project 13863, to perform channel improvements at Castle Creek in Warner Park, Wisconsin. The scope of work involves reconstructing an existing concrete lined channel by lowering and widening it from Sherman Avenue to Warner Lagoon. Key activities include the removal of concrete, native plant restoration, storm sewer improvements, and the potential removal, salvage, and reinstallation of existing bridges. The project is supported by a Pre-Disaster Flood Resilience Grant from the Wisconsin Department of Military Affairs totaling 1,842,719.55 dollars and requires compliance with permits from the US Army Corps of Engineers and the Wisconsin Department of Natural Resources. Bidders must be pre-qualified by the Board of Public Works, specifically in category 246 for Ecological Restoration if the prime contractor does not hold that qualification. The solicitation mandates a 12 percent Small Business Enterprise goal and requires a 5 percent bid bond. Proposals must include a lump sum bid and detailed unit prices submitted electronically via Bid Express by November 5, 2026. Award criteria are based on a best value determination, and the successful contractor must adhere to strict erosion control standards and a one-year guarantee for seeded areas. Construction is required to commence within seven calendar days of a written notice to proceed.
City of Madison

POSTED

about 8 hours ago

DEADLINE

in 1 day
NAICS: 237990
New
SLED
Ashley River Scenic Blue Trail Obstruction Clearing
Solicitation # 2027-09
Dorchester County, South Carolina, is soliciting bids for the Ashley River Scenic Blue Trail Obstruction Clearing project, solicitation number 2027-09. The project requires a qualified contractor to remove woody debris and natural obstructions along a four to five mile segment of the river between Ashley River Park at Bacons Bridge Road and Highway 17A. The primary objective is to restore safe motorized recreational navigation by establishing a continuous navigable passage with a minimum clear width of twenty-five feet. The scope of work includes cutting, repositioning, chipping, and disposing of debris in accordance with SCDNR Best Management Practices. The contract will be awarded to the lowest responsive and responsible bidder based on the total price of navigation clearing segments, contractor and county haul quantities, and a fixed five thousand dollar disposal allowance. The project must reach substantial completion within 180 calendar days of the Notice to Proceed, with final completion due within 30 days thereafter. Bidders must provide a Project Manager or Superintendent with at least three years of experience in marine waterway clearing. Bids exceeding 25,000 dollars require a bid bond of at least five percent of the total bid amount. As the project is funded in part through the Recreational Trails Program, contractors must comply with federal-aid construction provisions, including the Davis-Bacon Act, safety standards, and non-discrimination policies. The final deadline for bid submissions is December 1, 2026, at 2:00 PM, with submissions required via the county's online supplier portal.
Purchasing Services Division

POSTED

about 10 hours ago

DEADLINE

in 28 days

AI Contract Overview

Show more

Solicitation No. W9128F-08-R-0025 is a 100 percent HUBZone set aside Multiple Award Task Order Contract for construction services supporting the Missouri River Recovery Program. Managed by the Department of Defense through the Omaha District, the contract covers project sites between Gavins Point Dam, South Dakota, and the mouth of the Missouri River near St. Louis, Missouri. The scope of work involves developing fish and wildlife habitats across approximately 166,750 acres, with construction tasks including excavation, grading, dredging, riprap placement, light road building, and the installation of water control structures such as pump stations and culverts. The estimated total construction cost for the life of the contract is 10 million dollars. The contract structure consists of a one year base period with four one year option periods, with awards made to two to four contractors based on best value. Evaluation criteria are prioritized by technical capabilities and equipment, qualifications and past performance, project management plans, and price. Individual task orders are competed, and contractors must commence work within 10 days of a notice to proceed. A specific example of the work is the Langdon Bend Wetland Restoration Project, which involves the construction of berms and pump installations with strict timelines and liquidated damages for delays. Performance and payment bonds may be required for individual task orders, and contractor quality control is a mandatory requirement.

General Info

Contract Value

$0

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

US Army Corps of Engineer - Omaha District 106 S. 15th Street, Omaha NE 68102-1618 US, NE, USA

Set-Aside

NONE

Award Issued Date

Documents

7
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstrfb
High
PDF, High priority: read this firstrfp
High
ZIP
ZIP

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

6 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Jun 13, 2008 to Jun 16, 2008. The notice description changed.

Notice updated

Response deadline time changed from 10:00 PM UTC to 5:00 AM UTC on Jun 16, 2008. The notice title changed. The notice description changed. The point of contact changed.

Notice updated

The notice description changed. The point of contact changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Notice updated

Notice type changed from Solicitation to Special Notice. The response deadline was removed. The notice title changed. Set-aside removed. The notice description changed. The point of contact changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
Contacts1 person available
OfficeOMAHA, NE, 68102-4901, USA
Office AddressOMAHA, NE, 68102-4901, USA
Contacts

Full Description

Show more
Solicitation No. W9128F-08-R-0025 On or about 13 May 2008, this office will issue Request for Proposals (RFP) IDC Construction Contract For The Missouri River Recovery Program. Proposals will be received on or about 13 June 2008. This solicitation is a 100% HUBZone set aside RFP IDC Construction Contract Contractors interested in inspecting the site of the proposed work should Gwyn M. Jarrett at +1 (555) 000-0000 or at contact@example.gov DO NOT submit requests for proposal documents to the site visit personnel listed above. The work will include the following: Performance under these contracts will be executed in either the Omaha District or Kansas City District boundaries with project sites located between Gavins Point Dam, SD and the mouth of the Missouri River near St. Louis, MO. The contracts will have a 1-year base period with four 1-year option periods. Award will be made to 2 to 4 contractors selected on a best value basis. Individual task orders will be competed. Scope of work will vary with each work order. Types of construction could include, but is not limited to, excavation/grading, dredging, light road building (access roads, primitive parking lots), riprap placement, water control structures (stoplogs, pump stations, and culverts). The primary NAICS code is in the 237 series. Each contract will have a base period of 1-year and four 1-year options to extend the contract for an additional four years. Each contract will require the contractor to furnish all plant, labor, materials, and equipment to perform a wide variety of construction features that may consist of, but not limited to, excavation/grading, dredging, light road building (access roads, primitive parking lots), riprap placement, water control structures (stoplogs, pump stations, and culverts). Proposal Evaluation: Major evaluation areas of each offerors proposal, in descending order of importance, include: Technical Capabilities and Equipment; Qualifications including Construction Experience, Personnel and Past Performance; Project Management Plan; and Price. All other evaluation factors, when combined are anticipated to be approximately equal to price in the source selection decision. The estimated construction cost throughout the life of the contract is $10,000,00.00. Contractor's Quality Control will be a requirement in this contract. The Contractor will be required to commence work on each Task Order within 10 days after notice to proceed and complete the work within the time period stipulated in each Task Order. Provisions will be included for liquidated damages for each Task Order in case of failure to complete the work in the time allowed. Performance and payment bonds may be required as specified on individual Task Orders. The plans and specifications documents will be posted to the FedBizOpps website (https://www.fbo.gov/index?cck=1&au=&ck=). Plan holders are responsible for checking this Internet Site for amendments. If any of your company information changes during the advertisement period, submit the information via e-mail to contact@example.gov or by written request or fax. Telephone calls regarding Small Business matters should be made to Hubert Carter at +1 (555) 000-0000. Telephone calls on contents of Request for Proposal RFP package should be made to Gwyn Jarrett, Project Manager, at: +1 (555) 000-0000; Stephanie Rostermundt at: +1 (555) 000-0000; or Specification Section at: +1 (555) 000-0000. A pre-proposal conference will be conducted on May 21, 2008 from 09:00AM to approximately 12:00PM. The location will be the in the Iowa Room (3rd Floor) of the Doubletree Hotel & Executive Meeting Center, 1616 Dodge Street, Omaha, NE 68102. Site Visit-09:00AM on Tuesday, 20 May 2008, Plan to meet near the sheds on the left side on the road just past the Corps sign on the project site. Directions from Nemaha, NE - From Hwy 67 turn left onto 648A Ave/ (Washington St.) and head east. At the fork in the road, continue on 648A Ave, heading north. Take a right onto the project site, Look for a Langdon Bend Corps project sign. Meet near the sheds on the left side of the road. POC for site visit is Steven T. Rasmussen, PE +1 (555) 000-0000 Work or contact@example.gov

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 541990
New
Federal
Fort Campbell, KY - API 653 External Tank Inspection
Solicitation # W9128F27QA006
Solicitation W9128F27QA006 is a firm-fixed-price requirement issued by the US Army Corps of Engineers Omaha District for API 653 external above-ground storage tank inspections at Fort Campbell, Kentucky. The scope of work specifically covers facilities G7140 and H7140 and includes conducting a teleconference kick-off meeting, performing external tank and visual containment area inspections, and testing alarms and Automatic Tank Gauge equipment. The contractor is required to provide a certified API 653 Inspector and a Project Manager to ensure compliance with industry standards including API 653, API RP 575, NFPA 30, and NFPA 326. Key deliverables consist of draft and final reports for each facility along with completed API Std 653 checklists, with all work to be completed by March 20, 2027. This acquisition is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 541990. Proposals must be submitted as a single PDF document not exceeding five pages, excluding the price worksheet and administrative pages, and must be sent to Contracting Specialist Tony Manna and Contracting Officer Brent Bertrand by November 13, 2026. Award decisions will be based on the most advantageous offer, evaluating technical capability, inspector certifications, relevant project experience, and price reasonableness. Contractors must adhere to strict installation security requirements for personnel and vehicle access and comply with DFARS 252.204-7012 regarding the safeguarding of covered defense information.
All Other Professional, Scientific, and Technical Services

POSTED

6 days ago

DEADLINE

in 10 days
View Details
NAICS: 541330
Federal
USACE Omaha District - $249M Unrestricted Sentinel Construction Management Services (CMS) MATOC
Solicitation # W9128F26RA124
The USACE Omaha District is soliciting proposals for the Sentinel Construction Management Services (CMS) Multiple Award Task Order Contract (MATOC) under NAICS 541330. This unrestricted effort has a total estimated capacity of 249 million dollars, with the government intending to award four firm-fixed price Indefinite Delivery Contracts (IDCs). The contract supports the U.S. Air Force across the Northwestern Division, covering 15 states including Washington, Oregon, Idaho, Nevada, Utah, Montana, Wyoming, Colorado, North Dakota, South Dakota, Nebraska, Kansas, Iowa, Missouri, Minnesota, and Wisconsin. The performance period consists of a five-year base period with options extending the total duration up to seven years and six months. The scope of work involves providing professional, administrative, and management staff augmentation to oversee construction projects. Key responsibilities include performing Quality Assurance inspections per ER 1180-1-6, monitoring safety compliance according to EM 385-1-1, and managing project documentation through the Resident Management System or Construction Management Platform. Awards will be based on a best-value tradeoff process evaluating past performance, technical and management approach, key personnel resumes, small business participation, and cost. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) by November 10, 2026.
Engineering Services

POSTED

8 days ago

DEADLINE

in 7 days
View Details
NAICS: 237990
Federal
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Solicitation # W9128F27BA007
The Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2 project is a construction effort located along the left descending bank of Lake Sharpe near Big Bend, South Dakota. Managed by the USACE Omaha District, the project focuses on Reach 4 of the lake and involves the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path, and a 200-by-1,500-foot island in water up to three feet deep. Key technical requirements include the installation of a riprap revetment to protect against erosion and the planting of cottonwood trees and other culturally significant vegetation. These efforts are designed to create approximately 32 acres of riparian habitat and 5.17 acres of emergent wetland through tasks such as earth moving, grading, bank shaping, and topsoil placement. This procurement is a 100 percent Small Business Set-Aside under NAICS code 237990, with an estimated construction value between 10 million and 25 million dollars. The project is being solicited as a single-step sealed bidding process via an Invitation for Bid, with a required period of performance of 550 days following the Notice to Proceed. Bidders must be registered in the System for Award Management and submit their offers through the PIEE Solicitation Module. Additional requirements include the provision of performance and payment bonds and adherence to South Dakota Heavy and Highway wage determinations, with a specific note regarding a 4.5 percent Tribal Employment Rights Ordinance tax.
Other Heavy and Civil Engineering Construction

POSTED

9 days ago

DEADLINE

in 30 days
View Details
NAICS: 541990
Federal
Vandenberg SFB Tank Inspection
Solicitation # W9128F27QA002
Solicitation W9128F27QA002 is a firm-fixed-price, non-personnel services contract for the inspection of Department of Defense fuel tanks at Vandenberg SFB, California. This 100 percent Service-Disabled Veteran-Owned Small Business set-aside under NAICS 541990 requires the contractor to perform API 653 internal inspections on aboveground storage tanks, specifically focusing on Tank 1702, a welded steel vertical Jet A storage tank. The scope of work includes fuel removal, disposal, tank cleaning, and the replacement of wiper seals. Contractors must provide a certified API 653 inspector and a project manager to ensure compliance with API 650, API 653, NFPA 30, and various Unified Facilities Criteria and military standards. The government will award the contract based on best value, evaluating technical capability, relevant experience in fuel tank draining and cleaning, and price reasonableness. Proposals are limited to five pages and must be submitted electronically by November 13, 2026. Key deliverables include draft and final inspection reports featuring non-destructive testing summaries, engineering calculations, and categorized repair recommendations. Due to the location on a military installation, all personnel must adhere to strict security vetting and base access requirements. The contract also includes an option for the removal and disposal of excess fuel up to 2,000 gallons per purchase order.
All Other Professional, Scientific, and Technical Services

POSTED

9 days ago

DEADLINE

in 10 days
View Details
NAICS: 237120
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, solicitation W9128F27RA045, is a design-build effort located at the Mather Army Aviation Support Facility in California. Managed by the USACE Omaha District, this firm-fixed-price contract is restricted as a total Small Business Set-Aside. The scope of work involves comprehensive repairs and upgrades to the AVGAS fueling system, including the installation of a sampling gauge hatch, a mechanical gauge, and an automatic tank gauge system. Physical improvements include recoating the tank exterior, replacing collision barriers, adding a full-length catwalk, and replacing audible and visual alarms. Additional requirements include repairing the remote containment basin drainage, replacing asphalt and concrete pavement in multiple areas, relocating a generator with a new concrete pad, and the demolition and replacement of the POL operation building. The project will be awarded using the Lowest Price Technically Acceptable (LPTA) method, with technical evaluations focusing on project experience—requiring three examples of projects exceeding 1 million dollars—and a detailed Gantt chart covering preconstruction, on-site construction, and post-construction phases. The projected period of performance is 365 days. Contractors must comply with the Davis-Bacon Act for prevailing wages and adhere to strict quality control standards, including a three-phase control process and final acceptance through punch-out, pre-final, and final inspections. Required deliverables include as-built drawings, and the contractor must provide performance and payment bonds within 10 days of award. Optional CLINs are included for the remediation of petroleum-contaminated soil, lead-based paint, and asbestos-containing materials.
Oil and Gas Pipeline and Related Structures Construction

POSTED

12 days ago

DEADLINE

in 17 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS