Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity was posted on October 16, 2007. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y -- NATO Notification of Intent to Invite Bids for International Competitive Bidding on Relocation of Kabul International Airport Operating and Living Facilities

Closed
IFB-ISAF-ENG-068-002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
RIO DE LA PLATA FLOOD CONTROL PROJECT, SUPPLEMENTAL CONTRACT 1 PROJECT LOCATION: DORADO AND TOA BAJA, PUERTO RICO
Solicitation # W51DQV26RA002
Solicitation W51DQV26RA002 is a full and open competition for a firm-fixed-price design-bid-build construction contract for the Rio de la Plata Flood Control Project, Supplemental Contract 1, located in Dorado and Toa Baja, Puerto Rico. Managed by the U.S. Army Corps of Engineers under NAICS code 237990, the project has an estimated magnitude between 250 million and 350 million dollars. The scope of work involves extensive river channel widening and modifications across approximately 1.6 miles, the construction of 3.1 miles of earthen levees, and the installation of four concrete culverts with pre-cast pipes and composite flap gates. Additional requirements include the relocation of water, sewer, and electrical utilities, scour protection, demolition of abandoned structures, and wetland mitigation. The estimated period of performance is 1619 calendar days following the receipt of the Notice to Proceed, though offerors are cautioned that all real estate rights for site access have not yet been obtained and will be secured prior to the full notice. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment portal. Awardees are required to provide payment and performance bonds equal to the total bid price within 10 days of award, and firms other than small businesses must submit a subcontracting plan per FAR Part 19. The project also requires the delivery of an operations and maintenance manual detailing procedures for restoring levee geometry after seismic events.
W2SR Endist Caribbean(provis)

POSTED

about 4 hours ago

DEADLINE

in 9 days
NAICS: 237990
New
Federal
Arcadia Wet Well Rehabilitation
Solicitation # W912BV26RA033
Solicitation W912BV26RA033 is a firm-fixed-price request for proposals issued by the U.S. Army Corps of Engineers, Tulsa District, for the rehabilitation of wet well low flow gates at Arcadia Dam in Oklahoma County, Oklahoma. The project, categorized under NAICS 237990, has an estimated magnitude between $1,000,000 and $5,000,000 with an estimated duration of 500 calendar days. The scope of work includes the fabrication and delivery of two structural steel bulkheads, the removal and disposal of existing gates, and the design, fabrication, and installation of ductile cast iron low flow inlet and low flow gates and appurtenances across both the north and south wet wells. Additionally, the contractor must replace all angle H frames and structural bolts connecting them to the trash rack assembly in both wells. Award will be determined using the Lowest Price Technically Acceptable (LPTA) process, where proposals are evaluated for technical acceptability without trade-offs. Technical requirements include demonstrating past performance on relevant projects exceeding $250,000, providing qualified key personnel (Project Superintendent, CQC System Manager, and SSHO) who are U.S. citizens or documented workers, and submitting a proposed contract duration and summary schedule. Offerors must provide a NIST score in the Supplier Performance Risk System (SPRS) and submit their proposals via the PIEE Solicitation Module by October 26, 2026. The contract is subject to the Davis-Bacon Act, Buy American-Construction Materials requirements, and EM 385-1-1 safety standards.
W076 Endist Tulsa

POSTED

about 4 hours ago

DEADLINE

in 19 days
NAICS: 237990
New
Federal
LOCK AND DAM 25 NEW 1,200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)
Solicitation # W912P926RA004
The U.S. Army Corps of Engineers, St. Louis District, is soliciting proposals for the design, construction, and commissioning of a new 1,200-foot drilled-shaft founded lock chamber at Lock and Dam 25 in Winfield, Missouri. This project, part of the Navigation and Ecosystem Sustainability Program, involves constructing the new lock riverward of the existing 600-foot chamber, along with a 1,200-foot upstream ported guard wall and a 650-foot downstream guard wall. Once operational, the existing lock will serve as an auxiliary chamber for recreational traffic. The procurement is a full and open competition for a firm-fixed-price contract with economic price adjustments based on the Producer Price Index for commodities like steel, aggregate, and concrete. The performance period consists of a base period of 1,825 calendar days with four optional one-year extensions. Award will be determined using a best-value tradeoff process evaluating five factors: past performance, construction approach, river wall and intermediate wall means and methods, small business participation, and price. To be eligible, offerors must achieve at least an acceptable rating on all non-cost factors and submit a Project Labor Agreement. Key requirements include strict adherence to Buy American Act materials, electronic submission of Davis-Bacon certified payrolls, and the use of specific brand-name instrumentation and control systems for compatibility. Proposals must be submitted electronically via the PIEE Solicitation module, organized into specific volumes with strict page limits and formatting guidelines.
W07V Endist St Louis

POSTED

about 4 hours ago

DEADLINE

in about 2 months

General Info

Agency

N/A

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Not specified

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Lee AnnCarpenterTrade & Industry Analyst

Full Description

Show more
The NATO Maintenance and Supply Agency (NAMSA) intends to advertise for International Competitive Bidding (ICB) on works and services within the framework of the NATO Security Investment Program. Eligible firms will be invited to bid on the relocation of the operating and living facilities for Kabul International Airport. NAMSA is serving as the Host Nation for this project, which was authorized by the NATO Infrastructure Committee. Division of the project in different contracts/lots is not foreseen. The rough cost estimate for this project is between Euro 35 and 45 million (between $50 million and $64 million). The reference for the Invitation for Bid (IFB) is IFB-ISAF-ENG-068-002. The U.S. Department of Commerce will be using the same reference. The provision of classified information with the tender is not foreseen. SCOPE OF PROJECT The requirements of NAMSA in execution of this project to be built on ground leveled by others include the following facilities: - Passenger Reception Center (PRC) - HQ Main Building (HQMB) - Provide APOD Operations Center (AOC) - Force Protection Building - Cargo Air Terminal Office (CATO) - Minor Buildings - Relocation of existing hangar (rotary wing) - Relocation of existing cargo tents - Medical Facility Role 1 - Emergency Water Supply - De-mining Operations - Provide Logistics Facilities - Provide Dog Kennel Complex - Roads & Parking, and Hardstands - Berthing Accommodations both newly built or built with existing containers, to be refurbished - Morale and Welfare Facilities - Mess facility, including cooking/serving equipment - Sewage and Waste Water Treatment System - Potable Water System - Electrical Power Network The design concept embodied in the project is based on the construction of semi-hardened or non-hardened buildings. The structure of most of the buildings has been designed with the use of pre-engineered steel columns and beams to ensure rapid construction. All other buildings are designed with a conventional concrete load-bearing and anti-seismic structure, with a combination of concrete columns, concrete masonry units (blocks) and/or concrete walls as called for in each type of building, or with the use of existing deployable units, such as accommodation containers, hangars and large tents, all to be refurbished upon relocation. Additionally, other buildings have been designed as pre-engineered structures with steel frame and thermally insulated sandwich panel cladding. All other features of the buildings have been generally designed to minimum military requirement standards, with internal partitions in gypsum board, linoleum floors (ceramic tiles for floors and walls of wet areas), and sound-absorbing ceilings only in offices. Plumbing, electrical, and CIS distribution is to be run in exposed piping, ducting, and cable trays throughout, to limit cost and ensure ease of maintenance. Safety of personnel in each type of building has been ensured by the provision of an adequate number and size of means of egress (exit doors, fire escape stairs) in case of fire, all provided with emergency lights, exit signs, etc., all in accordance with current European Norm (EN) standards, plus the installation of a centralized smoke alarm system with smoke detectors in each room, all connected to one central alarm panel per building that is connected to a 120dB siren and a pair of roof-mounted flashing lights, enabling the fire fighting unit of the base to detect immediately the building originating the alarm. Fire fighting provisions include the installation of one or two fire hydrant cabinets with rolled hoses in each floor of each type of building. Main electrical panels of each building will be controlled by a fireman switch. Roadside fire hydrants will be installed along all main circulation roads. All other buildings will be provided with an ample number of fire extinguishers of a type suitable for fires Class B and C. All buildings will be quipped with roof-mounted lightning rods in accordance with the applicable EN standards. Utilities shall include the following: Electrical generation and distribution: based on the provision of new power generators the power of which will be transformed from Low Voltage (400 V, 50 Hz) to Medium Voltage (6.000 V) and distributed through the camp by means of directly buried MT cables. A suitable number of MV/LV dry transformers located in each area will convert power to LV feeding the distribution panels of each facility. Power generators and main switchboards shall be housed in hardened buildings. Water supply and distribution: Water shall be drawn from three well-spaced well points drilled to a depth of approx. 100m to ensure a constant supply of water of the better quality available. Piping from the well pumps will lead water to a central, blast-proof water reservoir holding three days of consumption at maximum usage rate (300 lt. man/day) or one week at rationed water consumption (130 lt. man/day) where the water will be treated to eliminate turbidity and disinfected before being stored in the reservoir. From the same facility, water pumps will feed the water supply network of the camp at a pressure of 8 bars. Pressure reduction valves lowering the pressure to 3 bars will be installed at the base of piping raisers supplying domestic usage points, while it will be maintained at 8 bars for connection to the fire hydrants and indoor fire hoses. Piping network has been dimensioned on the basis of maximum simultaneous consumption, i.e. two fire hydrants being used simultaneously at the rate of 80 cubic m/hour. To limit water consumption, all taps in ablutions shall be fitted with flow limitation appliances, with showers fitted with thermostatic temperature controls as well. Sewage: Raw sewage will be collected from all discharge points and run to a number of lifting stations equipped with crushers/shredders of foreign objects, from which the sewage will be pressurized at 3 bars and run to a biological sewage treatment plant built in concrete and prefabricated modules. Treated effluent will have a quality allowing for its discharge in the drainage ditch surrounding the camp. A bypass valve will allow the storage of part of the treated effluent in storage reservoirs, from which a separate piping system will take the water to be used as irrigation water for the grassed areas during the summer months. Solid waste: To reduce as much as possible the number of trucks leaving and entering the camp to dispose of solid waste, presenting a considerable risk for security, the project includes a garbage compactor capable of compacting the average daily production of solid waste into the volume of a single container that can be better inspected on returning to the camp after its discharge than the several trucks currently used for the same purpose. CIS Connectivity: The project includes a network of PVC ducts linking the two SATCOM stations and Line-of-Sight communication towers to be built at the western and eastern sides of the camp (latticed towers 30.00m high included in the project) among themselves, and to each facility requiring connectivity. Consistent with previous authorizations, the project includes also penetrations and shafts for CIS inside facilities, but does not include ducting, cabling, wiring and dedicated CIS equipment (to be installed by others). Paved areas: include the necessary asphalted roads, all designed to MLC 60, in widths of 3.00m (one way), 5.00m (two-lanes, low traffic) and 7.00m (two lanes, main roads), plus asphalt and concrete hardstands designed to accommodate cargo handling and storage facilities, a helicopter hangar, power generators, a sewage treatment plant and other lesser facilities. All roads running through densely populated areas will be completed with 1.00m-wide asphalted sidewalks. Other roads will instead be bordered by drainage ditches collecting the runoff of surface waters. Design Standards: all structural, mechanical, electrical, and safety characteristics of the buildings to be built under the project will be calculated and designed in accordance with the applicable EN standards and having in mind the widest possible use of locally produced materials, subject to their compliance with the EN. In performance of the project, the contractor may refer to other standards (national or international) provided that their requirements are equal to or better than their equivalent EN Standards. The following EN standards are of particular relevance for the design and construction of this project: EN 1990 Basis of Design EN 1991 Actions on Structures EN 1992 Design of Concrete Structures EN 1993 Design of Steel Structures EN 1994 Design of Composite Steel and Concrete Structures EN 1995 Design of Timber Structures EN 1996 Design of Masonry Structures EN 1997 Geotechnical Design EN 1998 Design Provisions for Earthquake Resistance of Structures EN 1999 Design of Aluminum Structures BIDDING PROCEDURE The U.S. Department of Commerce does not serve as the Host Nation for NATO projects. Its role is to approve for bidding those firms of NATO-member nations with a facility located within the United States. Only firms approved by the U.S. Department of Commerce will be allowed to bid. Please visit the following website for instructions on applying for approval to bid on NATO projects: http://www.bis.doc.gov/defenseindustrialbaseprograms/OSIES/NATOprograms/index.htm A firm that has been approved for bidding on NATO projects must request that the U.S. Department of Commerce issue a Declaration of Eligibility (DOE) for each project on which the firm wishes to bid. The DOE is used to nominate the firm to the Bidders List for a particular project. The U.S. Department of Commerce forwards the DOE to the U.S. Embassy, which in turn forwards it to the Host Nation. The Host Nation will not accept requests for nomination received directly from firms. Firms that the U.S. Embassy nominates to the Bidders List will be contacted directly by the Host Nation when the IFB has been issued. IMPORTANT DEADLINES 1. Final date to request a Declaration of Eligibility from the U.S. Department of Commerce: 09 January 2008 2. Anticipated date that the Host Nation will forward the IFB to those on the Bidders List: 15 January 2008 3. Anticipated closing date for receipt of bids: 22 February 2008. (The validity period for bids is 4 months from the bid closing date.) 4. Anticipated contract award date: 14 March 2008

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS