Pool 8 Phase III Stage 3A, Habitat Rehabilitation and Enhancement Project (HREP)

Awarded
W912ES-08-B-0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
Construction of Big White Pickleball Courts
Solicitation # RDKB-26-PBCBW
The Regional District of Kootenay Boundary (RDKB) is soliciting bids for the construction of two pickleball courts at the Big White Ski Resort, specifically located at the Happy Valley Skating Rink in British Columbia. This unit price contract encompasses a comprehensive scope of work including earthworks, site grading, drainage, the removal of oversized boulders, pavement construction, concrete curbing, asphalt paving, and court surfacing. Key deliverables include the installation of cast-in-place net pole bases and the provision of survey layout and project record documents. The project is scheduled for substantial completion by June 7, 2027, with final completion required by June 15, 2027. Prospective bidders must submit their proposals in PDF format via email to Mark Daines by the December 11, 2026, deadline. Submissions must include detailed company information, a designated Project Manager as the single point of contact, at least two relevant references, and a comprehensive fee structure including a total maximum upset fee and a schedule of hourly rates. Bidders must also provide a work plan, methodology, and a list of all proposed subconsultants. Mandatory requirements include the ability to maintain Comprehensive General Liability Insurance of at least 5,000,000.00 CAD, compliance with the British Columbia Workers Compensation Act, and the submission of a Health and Safety Manual and Occupational Health and Safety Plan prior to commencing onsite work. Award decisions are based on a ranking process, and the successful proponent must provide performance security within 10 days of being deemed the highest ranked.
Regional District of Kootenay-Boundary

POSTED

about 12 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Pool 8 Phase III Stage 3A Habitat Rehabilitation and Enhancement Project (HREP), solicitation W912ES-08-B-0004, was awarded by the Department of Defense through the US Army Corps of Engineers St. Paul District. This environmental construction project focuses on the creation of islands using dredged material, the installation of rock and log sills, riprap slope protection, and the development of wildlife structures within Pool 8 of the Upper Mississippi River. The estimated project value ranged between 5 million and 10 million dollars, with a project deadline of June 30, 2009. Technical requirements for the contract include extensive dredging and excavation at various island sites and approved sand borrow areas such as Brownville Daymark and Deadmans Slough. The scope of work encompasses precise excavation depths, the placement of granular and random fill, and the construction of rock groins and island berths. Critical operational constraints include the mitigation of impacts to mussel areas, the protection of existing vegetation, and strict adherence to field-verified window locations and island layouts. The procurement process involved multiple amendments to adjust offer deadlines, update payroll compliance clauses, and revise measurement and payment requirements for fill materials.

General Info

Contract Value

$4,862,280.64

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

MN, USA

Set-Aside

NONE

Award Issued Date

Documents

13
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
DOC, High priority: read this firstamendment
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
XLS, High priority: read this firstbid-abstract
High
PDF, High priority: read this firstifb
High
PDF, Low priorityaward
Low
PDF
PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

16 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The response deadline was removed. The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline added: Mar 23, 2009. The notice title changed. The notice description changed. The point of contact changed.

Notice updated

The notice description changed. The point of contact changed.

Notice updated

The notice description changed. The point of contact changed.

Notice updated

Response deadline time changed from 5:00 AM UTC to 8:00 PM UTC on Mar 23, 2009. The notice description changed.

Notice updated

Response deadline time changed from 8:00 PM UTC to 5:00 AM UTC on Mar 23, 2009. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline time changed from 5:00 AM UTC to 7:00 PM UTC on Mar 23, 2009. The notice description changed.

Notice updated

Response deadline time changed from 7:00 PM UTC to 8:00 PM UTC on Mar 23, 2009. The notice description changed.

Notice updated

Response deadline time changed from 8:00 PM UTC to 7:00 PM UTC on Mar 23, 2009. The notice description changed.

Notice updated

Response deadline time changed from 7:00 PM UTC to 8:00 PM UTC on Mar 23, 2009. The notice description changed.

Notice updated

Response deadline time changed from 8:00 PM UTC to 7:00 PM UTC on Mar 23, 2009. The notice description changed.

Notice updated

Response deadline changed from Mar 23, 2009 to Mar 26, 2009. The notice description changed.

Notice updated

Response deadline time changed from 8:00 PM UTC to 7:00 PM UTC on Mar 26, 2009. The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist St Paul
Contacts1 person available
OfficeSAINT PAUL, MN, 55101-1323, USA
Office AddressSAINT PAUL, MN, 55101-1323, USA
Contacts

Full Description

Show more
The Corps received the following Question: Note 1. Drawings C-109, C-110, C-111 allows the USACE to change the size of the borrow areas. How is the contractor to estimate the amount of material available from each area if you can change the size of the area? It is possible that the contractor could estimate using the main channel area, Deadman's Slough, and head of raft channel only to find out that only 50% of the required volume is now available and the rest must come from the above Brownsville site. The cost for dredging each of these areas is vastly different. Response: There is enough information in the plans (bathymetry, cut dimension, typical section) for the contractor to calculate quantities available. Based on current information - we have estimated that there is enough material in the main channel cut to build all the islands in the contract. Depending on the approach, the contractors may or may not want to use the other cuts. We have not provided estimates for each cut, as conditions can change at any time. We do not know if the selected contractor will want to dredge from the Above Brownsville site, but we left that in as an acceptable source of material. The areas are identified as suitable areas for granular material and amounts available are based on the best information currently available regarding bathymetry. The notes on the plans identify those areas that may be dredged prior to construction and for which estimated quantities may change.

More opportunities from Department Of Defense → W07V Endist St Paul

Same awarding agency

NAICS: 541930
New
Federal
FY27 ASL Interpretation Services for USACE MVP
Solicitation # W912ES27QA005
Solicitation W912ES27QA005 is a firm fixed-price contract for American Sign Language (ASL) interpretation services to support the U.S. Army Corps of Engineers (USACE) St. Paul District in Saint Paul, Minnesota. This opportunity is a total small business set-aside under NAICS code 541930. The period of performance runs from November 15, 2026, to November 14, 2027, and consists of two primary line items: 300 hours of interpretation services and one general job. The government will award the contract to the responsible offeror providing the most advantageous offer, with the primary evaluation factor being the lowest hourly rate. Award considerations include the total price of all options and risk assessments from the Supplier Performance Risk System regarding item, price, and supplier performance. Offerors must submit their quotes electronically through the PIEE Solicitation Module by November 13, 2026. Compliance requirements include adherence to the Buy American and Balance of Payments Program, the Service Contract Act for prevailing wages in Minnesota and Wisconsin, and various non-discrimination and safety standards. While there is conflicting guidance regarding the use of Wide Area Workflow (WAWF), the St. Paul District indicates that invoices should be submitted according to the Statement of Work. All inspection and acceptance of services will occur on-site at the St. Paul District Army Corps Engineer Centre.
Translation and Interpretation Services

POSTED

4 days ago

DEADLINE

in 12 days
View Details
NAICS: 541620
New
Federal
Phase I Environmental Site Assessment at Lower Grey Cloud Slough Islands
Solicitation # W912ES27QA010
Solicitation W912ES27QA010 is a firm fixed price contract issued by the U.S. Army Corps of Engineers, St. Paul District, for a Phase I Environmental Site Assessment (ESA) at the Lower Grey Cloud Islands. This procurement is a total small business set-aside under NAICS code 541620. The period of performance is scheduled from December 1, 2026, to May 1, 2027, with the final delivery of the assessment requested by May 1, 2027. The project requires the contractor to produce a draft and final ESA report in Microsoft Word format, adhering to USACE 1165-2-132 and ASTM E1527-21 standards, along with native electronic formats for all maps, figures, and geospatial shapefiles. The contract will be awarded based on the lowest price technically acceptable (LPTA) criteria, with the government evaluating the total price of the basic requirement and any applicable options. Key administrative requirements include active registration in the System for Award Management (SAM) and compliance with various FAR and DFARS clauses, including cybersecurity reporting, Buy American preferences, and prevailing wage laws. Inspection and acceptance will be managed by Tom Reinhardt at the St. Paul District office in Minnesota. Invoices are to be submitted to the Contracting Officer's Representative, though the solicitation contains conflicting instructions regarding the use of Wide Area Workflow (WAWF).
Environmental Consulting Services

POSTED

4 days ago

DEADLINE

in 10 days
View Details
NAICS: 334513
New
Federal
Industrial Variable Frequency Drives (VFDs)
Solicitation # W912ES26QA115
Solicitation W912ES26QA115, issued by the U.S. Army Corps of Engineers St. Paul District, is a total small business set-aside for the procurement of factory-new, commercial-off-the-shelf ABB ACS880 Series Variable Frequency Drives (VFDs). These units are required for critical operations on the Dredge Goetz, including the cutter head, main pump motors, ladder, swing, spud, and carriage drives. To ensure system compatibility and prevent unacceptable downtime, the government has issued a brand name justification limiting competition to ABB brand spares. The requirement consists of four line items: one 690V Drive Module (430A), one 500V Wall-Mounted Drive (302A), one 500V Wall-Mounted Drive (124A), and two 690V Drive Modules (721A), all featuring specific factory-installed plus-codes and technical specifications. The contract will be awarded as a single firm-fixed-price agreement to the responsible offeror providing the most advantageous price. All equipment must be 100 percent factory-new, meeting IEEE, UL, and CE standards, and must include a minimum 12-month warranty from commissioning or 18 months from delivery. Deliverables include a technical data package and a Certificate of Conformance. Items must be crated per ASTM industrial standards, moisture-barrier wrapped, and marked with permanent OEM nameplates and DoD unique identification per MIL-STD-130. Delivery is required by February 26, 2027, to the Civil Works Service Base in Fountain City, Wisconsin, with shipping costs included in the CLIN pricing. Offers must be submitted in PDF format via the PIEE Solicitation Module by the final deadline of November 9, 2026.
Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables

POSTED

5 days ago

DEADLINE

in 7 days
View Details
NAICS: 332439
New
Federal
2-20 foot Containers with Gantry Beam and Chain Lift
Solicitation # W912ES27QA004
Solicitation W912ES27QA004 is a total small business set-aside for a firm-fixed-price contract to procure two brand-new 20-foot High Cube open-side storage containers for the U.S. Army Corps of Engineers. The containers require custom structural steel fabrication of a 1-ton capacity Load Handling Equipment crane and hoist system, featuring a 6-foot external extension and an internal counterweight system. Key technical requirements include a design safety factor of 5:1 per ASME B30 standards, PE-stamped structural calculations, and compliance with EM 385-1-1. All modified components must be coated in industrial Safety Yellow paint and the units must be marked with DoD Item Unique Identification in accordance with MIL-STD-130. The contractor is responsible for turnkey ground delivery to Fountain City, Wisconsin, with a final delivery deadline of March 1, 2027. Final acceptance is contingent upon a physical inspection and successful field demonstration by USACE staff, including a 125% proof load test and verification that the hoist traverses the full length of the gantry rails without binding. Offerors must submit technical descriptions, product data sheets, and drawings via the PIEE Solicitation Module. Evaluation will be based on technical acceptability, price consistency with historical data, and risk assessments conducted through the Supplier Performance Risk System.
Other Metal Container Manufacturing

POSTED

5 days ago

DEADLINE

in 3 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS