Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on February 23, 2012. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

3rd Floor Buildout NGA

Closed
W912DR12S0011Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 14 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 14 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 14 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 14 hours ago

DEADLINE

in 10 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

MD

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

3 updates
PhaseClosed
Posted

Sources Sought

Notice updated

Notice type changed from Sources Sought to Special Notice. The response deadline was removed. The notice title changed. The notice description changed.

Notice updated

Notice type changed from Special Notice to Sources Sought. Response deadline added: Mar 6, 2012. The notice title changed. The notice description changed. The point of contact changed.

Notice updated

Notice type changed from Sources Sought to Special Notice. The notice title changed. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist Baltimore
Contacts1 person available
OfficeBALTIMORE, MD, 21201-2526, USA
Office AddressBALTIMORE, MD, 21201-2526, USA
Contacts
Karen L. JohnsonContract Specialist

Full Description

Show more
This is a Sources Sought Notice Only and is for informational market research purposes only to determine the availability of potential qualified contractors. Responses to this sources sought announcement will be used by the Government to make appropriate acquisition decisions. NO SOLICITATION IS CURRENTLY AVAILABLE. The NAICS code is 236220 Commercial and Institutional Building Construction. NAICS code is 236220 Commercial and Institutional Building Construction. The U.S. Army Corps of Engineers, Baltimore District, requests interest from contractors interested in performing work on a potential design-bid-build construction solicitation for the estimated price range of more than $10,000,000. "The sources sought notice (W912DR-12-S-0011) submitted on 23 Jan 2012 is hereby amended to change the estimated price range of more than "$10,000,000" to Between "$25,000,000 and $100,000,000". The deadline for accepting responses is hereby extended to 6 Mar 2012 @12 (noon). The point of contact is Karen L. Johnson (karen.l.johnson@usace.army.mil) STATEMENT OF WORK National Geospatial-Intelligence Agency (NGA) Campus East (NCE) - Third Floor Build Out at the Tech Center 1.0 OBJECTIVE: The Issued-For-Construction (IFC) package for the NGA Third Floor Build Out of the Technology Center contains completed drawings and specifications for fitting out 29,500 SF room that currently has a bare concrete floor depressed 3' from grade, CMU walls and concrete ceiling with pendant industrial lights. The work will transform this space into a state of the art Data Center with Tier 2 plus reliability and concurrent maintainability with a power density of 150 watts/SF designed around a hot aisle/cold aisle cooling concept. This project will upgrade critical IT infrastructure for NGA, doubling the size of the data center in Springfield, VA. 2.0 SCOPE OF WORK: Provide and install a fully functional Data Center with Tier 2 plus reliability on the third floor of the NCE Technology Center. A Tier 2 Data Center guarantees 99.741% availability provided by redundant capacity components and single non-redundant distribution paths serving the site's equipment. The Data Center will have UPS and engine generators with a capacity design of Need plus One (N+1), with a single power path. While this is not a complete listing of the scope requirements, following are some specific features of the Data Center further described within the IFC package: 2.1 Installation of a raised access floor with stringers grounded to form an equipotential reference plane for the IT racks (provided as GFE equipment) that the contractor will secure to and ground to this floor. 2.2 Architectural work includes acoustic ceiling, furred gypsum drywall on existing CMU walls, demountable partitions with integral doors, painting, signage and a thorough cleaning after construction is complete to meet data center standards as specified by the International Organization for Standardization Class 8 in accordance with ISO 1466-1. 2.3 Mechanical work consists of installation of 50+ Computer Room Air Conditioning (CRAC) units, chilled water distribution piping, pre-action sprinkler system, chilled water pumps, ductwork, fans and a hydrogen detection system (for UPS battery rooms) as well as a new cooling tower and chiller in the Central Utility Plant. 2.4 Electrical work includes Power Distribution Units and Remote Power Panel installation in the new data center and all under floor receptacles to power the computer equipment. Due to the criticality of this facility each piece of computer equipment is fed from 2 different sources to provide redundancy in case of failure of one source. The electrical system must be installed with redundancy so that failure on any one component will not cause a failure of the IT equipment. Additionally, the electrical system involves installation of 2 large Uninterruptable Power System arrays of batteries, new rotary uninterruptable systems, new switchgear, new multi-ended unit substations and bus ducts, lighting and options for up to 3 backup diesel generators located outside the Central Utility Plant. There are options for Selective Catalytic Reduction (SCR) systems to be installed on up to 12 generators with a urea tank system to mitigate the waste from the SCR's. 2.5 Controls systems work includes expansion of the existing photoelectric fire alarm system. There is an option to replace this with an aspirating laser scanner fire alarm system. Additionally, an expansion and tie in to the existing building automation system and power monitoring system are in the scope of this project. It is critical that this be done seamlessly to avoid losing any control and monitoring capability to the existing 24x7, 365 day/year data center. 2.6 Telecom work includes installation of a multi level cable tray system and installation of telecom cabling from the existing operational computer room to the new data center. Access to the existing data center will be severely limited due to operations and all work must be done under security escort. 2.7 Contractor will need to work in this space under a joint use arrangement with other follow on contractors specifically for IT and security installations. 3.0 SCHEDULE: Upon award, the Contractor shall develop a proposed schedule for the completion of all work as described in Section 2.0 above and as further described in the IFC documents. The schedule shall be developed in accordance with all contract requirements and submitted for review and approval no later than thirty (30) calendar days from receipt of the Notice to Proceed (NTP). 3.1 NGA desired BoD is April 2013. The performance duration will not exceed 14 months (426 calendar days) beyond NTP. 4.0 SECURITY: 4.1 The existing data center is a secure facility located on the 4th floor of the Technology Center and must remain operational 24x7 hours/day, 365 days/year throughout the construction of this project. Routine outages impacting other areas of the Technology Center or elsewhere on the NGA Campus will NOT BE PERMITTED. Any outages that must occur will have to be coordinated through an agency outage control board. This process takes 1 month and is subject to last minute changes due to mission impacts. 4.2 This project occurs in an operational Sensitive Compartmented Information Facility (SCIF) so all activities in the project scope will be performed under the supervision of government provided escorts. Work hours, access to the NGA site, access to the work area will all be restricted and must be coordinated. These restrictions may include: US workers only, no cellular phones, no cameras, no recording devices, subject to search at any time, inspection of all materials/tools/equipment, pre-coordinated access and approval of any personnel. Utilization of the 'E-Verify' System will likely be required for all personnel & workers accessing the site. 5.0 OTHER: The contractor shall conform with the installation policy regarding vehicle and personnel access and any special tenant security requirements. The contractor shall comply with all requirements for preparation of the Health and Safety plan, in particular, any confined space entry as required as part of this SOW will be conducted per the Health and Safety Plan and applicable Federal, State and Local requirements. The Contractor shall submit documentation to the following office: US Army Corps of Engineers, Baltimore District Belvoir Integrated Program Office 6050 1st Street, Building 1444 ATTENTION : DREW WHITE Fort Belvoir, VA 22060 All data, reports, submissions, and other materials under this delivery order are property of the US Government and shall not be released by the Contractor or his/her affiliates without written approval by the Contracting Officer. Upon completion of the contract, the Contractor shall provide copies of all documentation and unused project information to the Government for use or disposal as appropriate. 6.0 OPTIONS: 6.1 Aspirating Laser Scanner Fire Alarm System. 6.2 Selective Catalytic Reduction (SCR) Systems 7.0 PERIOD OF PERFORMANCE: 14 months (426 calendar days) from award date. NOTE: Please note that it is required that your company be registered in the Contractors Central Registration (CCR) System, please see www.ccr.gov for additional information. In addition, this sources sought is not to be construed as a commitment by the government, nor will the government pay for any information solicited or delivered. Responses are to be sent via email to karen.l.johnson@usace.army.mil no later than 12:00 p.m. (Eastern Standard Time), 6 February 2012.

More opportunities from Department Of Defense → W2SD Endist Baltimore

Same awarding agency

NAICS: 531120
New
Federal
U.S. Corps Marine Career Center- Huntington, WV
Solicitation # W912QR-27-Huntington-WV
The Baltimore District of the U.S. Army Corps of Engineers is soliciting lease proposals for approximately 1,271 usable square feet of commercial retail space for the U.S. Corps Marine Career Center. The desired location is within a one-mile radius of 901 4th Avenue, Huntington, West Virginia. Requirements for the space include a secondary egress and adequate parking for two government vehicles for both day and overnight use. Proposals must include the proposed rental amount, encompassing common area maintenance, taxes, and insurance, and are due by 5:00 pm on October 30, 2026. The selected lessor will be responsible for initial alterations, including the removal of abandoned cabling and fixtures, and must ensure the premises comply with the Architectural Barriers Act Accessibility Standard and applicable life safety codes such as NFPA 101 or the International Building Code. The lessor is required to maintain public liability and property damage insurance with a combined limit of at least 1,000,000 dollars, as well as fire and extended coverage insurance for the full replacement value of the building. Acceptance of the space is contingent upon a final inspection and the issuance of a valid Certificate of Occupancy. All prospective contractors must be registered in the System for Award Management with a Unique Entity Identifier and a notarized letter appointing an authorized Entity Administrator to ensure eligibility for award and electronic funds transfer payments.
Lessors of Nonresidential Buildings (except Miniwarehouses)

POSTED

6 days ago

DEADLINE

in 10 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS