This Sources Sought opportunity from Department Of Veterans Affairs was posted on November 25, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y1DZ--PN: 636-26-305 Correct Parking Garage Safety Deficiencies (OM) AP: 36C263-26-AP-1060

Closed
36C26326Q0168Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

42 minutes ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

42 minutes ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of the plant featuring a packaged Membrane Bioreactor, headworks, UV disinfection, SCADA systems, and various support buildings; decommissioning and demolition of existing facilities; and finish facilities including the Walnut Avenue extension and a second sludge handling unit. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and agree to the Overaa standard agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Performance and labor bonds for 100 percent of the subcontract price may be required, and all subcontractors must provide a waiver of subrogation endorsement for workers compensation insurance.
C. Overaa & Co.

POSTED

42 minutes ago

DEADLINE

in 19 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project located at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass extensive sitework, including clearing, rock excavation, grading, and the implementation of rigid inclusions and load transfer mats for foundations. Due to the impact on existing wetlands, mitigation efforts are required. Infrastructure improvements include new access roads, paved loading areas, landscaping, and a complete electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026.
J & J Contractors, Inc

POSTED

42 minutes ago

DEADLINE

in 9 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC is soliciting firm fixed price bids for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes site preparation, structural modifications such as saw cutting reinforced concrete walls, and the installation of an ADA-accessible route featuring ramps, landings, and handrails. The contractor is responsible for all permitting, structural engineering, weatherproofing, and ensuring that interior and exterior finishes match the existing clubhouse architecture. Project acceptance is contingent upon successful inspections by the Authority Having Jurisdiction and final approval by Colville Fuels. This is a price-based solicitation where the award will be made to the lowest responsive and qualified bidder, subject to budgetary limits and Indian preference requirements per Colville Tribal Code Chapter 10-3. Bidders must demonstrate technical and financial capacity, provide a detailed project schedule, and submit a subcontracting plan. Required insurance includes Commercial General Liability of at least 1 million dollars per occurrence, Business Automobile Liability, and Worker's Compensation. Bids are due by November 20, 2026, with a targeted contract award date of December 4, 2026, and a weather-dependent completion goal of March 31.
Confederated Tribes of the Colville Reservation

POSTED

about 1 hour ago

DEADLINE

in about 1 month

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

VA Health Care System Central Plains/Omaha, Omaha, MN, 68105, USA

Set-Aside

SDVOSBC

Documents

1

Sources Sought Notice 36C26326Q0168 for Parking Garage Safety Deficiencies

DOCX, Low priority12 pages · sources-sought
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Network Contract Office 23 (36C263)
Contacts1 person available
OfficeSaint Paul, MN, 55101, USA
Office AddressSaint Paul, MN, 55101, USA
Contacts
Derek ForeContracting Officer

Full Description

Show more
This is a SOURCES SOUGH NOTICE (36C26326Q0168) in support of the Department of Veterans Affairs Health Care System Central Plains/Omaha in Omaha, NE for market research purposes only to determine the availability of potential businesses with capabilities to provide the requirement described below. This notice shall not be construed as a request for proposal/request for quote or as any commitment or obligation on the part of the Government to issue a solicitation. The Government does not intend to award a contract on the basis of this request so proposals will not be considered. No reimbursement will be made for any costs associated with providing information in response to this synopsis or any follow-up information requests. Response is strictly voluntary it is not mandatory to submit a response to this notice to participate in any formal solicitation process that may take place in the future. However, it should be noted that information gathered through this notice may significantly influence our acquisition strategy. All interested parties will be required to respond separately to any solicitations posted as a result of this sources sought notice. The Department of Veterans Affairs (VA), Network Contracting Office 23, is seeking Service-Disabled Veteran-Owned Small Businesses (SDVOSBs). Any responses from non-SDVOSBs may be considered. However, SDVOSBs will be given priority in review of responses to this Sources Sought Notice. This is to determine whether the Veterans Affairs has a need to conduct a tiered evaluation in the event sufficient responses from SDVOSBs/VOSBs are not obtained. Anticipated North American Industry Classification System (NAICS) code is 236220 Commercial and Institutional Building Construction Contractors. The largest a firm can be and still qualify as a small business for Federal Government programs is a size standard of $45.0M. Construction Magnitude: Between $1,000,000 and $2,000,000 Interested parties are invited to respond via email to derek.fore@va.gov. Responses will be used to determine the appropriate acquisition strategy. All responses due by 12/09/2025 at 12:00 PM CT. Potential contractors shall provide, at a minimum, the following (1-7): Company name, address, and point of contact, phone number, email address, and Unique Entity Identifier (UEI). Is your firm eligible for participation in one of the following small business socio-economic programs? If so, please indicate the program. [ ] yes [ ] no Small Business (SB) [ ] yes [ ] no HUBZone [ ] yes [ ] no Small Business 8(a) [ ] yes [ ] no Small Disadvantaged Business (SDB) [ ] yes [ ] no Women-Owned (WO) Small Business [ ] yes [ ] no Service Disabled Veteran Owned Small Business (SDVOSB) [ ] yes [ ] no Veteran Owned Small Business (VOSB) [ ] yes [ ] no Other (please specify) What additional information would the Government need to provide for you to be able to submit an accurate and complete offer with full understanding of the requirements if we posted a formal solicitation? Provide a brief capability statement (Max 2 pages) with enough information to determine if your company can meet the requirement. The response must address key criterial: Describe your experience in design/build projects. Size, Scope, and Complexity. Include project titles, locations, dollar values, and a brief description of the work performed. Describe your technical capability specific technical skills, certifications, and teaming arrangements available to perform the work. Describe your experience as a prime contractor within the past five years with the Government; and your two largest projects you have successfully completed within the past five years. Bonding Capacity provide information on the firm s bonding capacity. Safety Record provide information on the company s safety record, including EMR (Experience Modification Rate) and any OSHA violations in the past five years. The Government is seeking all interested parties Rough Order Magnitude (ROM) of this project. Please review any and all attachments associated with this sources sought to develop a Rough Order Magnitude (ROM) estimate. The Capabilities Statement for this Source Sought is not expected to be a Request for Quotations, Request for Proposals or Invitation for Bids, nor does it restrict the Government to an ultimate acquisition approach, but rather the Government is requesting a short statement regarding the company s ability to provide the services outlined below. The capabilities will be evaluated solely for the purpose of determining to set-aside for the one of the socio-economic categories listed above or to conduct as an Unrestricted Procurement. Other than small businesses may respond to this notice in the even the market does not indicate SB interest. This synopsis is for information and planning purposes only and is not to be construed as a commitment by the Government. The Government will not pay for information solicited. Respondents will not be notified of the results of the evaluation. Note: Do not include Proprietary, classified, confidential, or sensitive information in responses. To assist in your response a draft statement of work outlining the preliminary scope and requirements is provided below. We encourage feedback on the draft statement of work to ensure the final version accurately reflects the project s needs and industry capabilities. Please provide any comments or suggestions regarding the draft statement of work as part of your response to this sources sought notice. DESCRIPTION OF THE REQUIREMENT: This project will require a Design-Build Team to develop and install a dry-pipe fire suppression system and jump prevention barriers in the parking garage at the Omaha Veterans Affairs Medical Center. The design shall incorporate best practices and methods and comply with Veterans Health Administration design guidelines. Barriers shall be consistent with the architecture of the parking garage and shall be mounted to and removable from existing barriers for reinstallation following potential future modifications to the garage.
Successful offeror will be either an Architect/Engineer and Construction Teaming Arrangement or an experienced contractor with in-house construction and design capacity capable of providing services as detailed in the Scope of Work. At minimum, the Design Team will include experienced Architectural, Civil, Structural, Mechanical/Plumbing, Electrical, Fire Protection, and Environmental design professionals.
NOTE: Because this PWS does not require separate A/E and Construction Firms, the terms Design Team and Construction Team are used in lieu of A/E Firm and Construction Contractor throughout the document. The term Design Build Team or DB Team includes both the design and construction teams.
VA Design Guides, Specifications, and References (current versions). A complete listing of all VA technical documents available for use can be found on the VA website at https://www.cfm.va.gov/TIL/. The following documents made available from the Technical Information Library (TIL) will be used as a guide for the completion of this design project; however, may require some deviations. Significant deviations from these guides must be approved by the COR and justified in writing.
All work shall be completed in compliance with the most current version of all applicable codes including, but not limited to OSHA, NFPA 101, NFPA 1, NFPA 13, NFPA 88A, International Building code, VA Barrier Free Design Guide and VA guidelines for patient safety and infection control.
All document packages, including the final design/construction documents from a resultant task order will be subject to review and approval (by signature) of all members of an Integrated Project Team (IPT) consisting of medical center personnel. These individuals will be identified by the VA Contracting Officer s Representative (COR) at the first design meeting. All document packages, including the final design/construction documents moving forward for construction will be subjected to technical reviews, including third party technical reviews and/or legal reviews. The Design Team is responsible for revising documents to incorporate comments provided by those reviews.
Objectives and Technical Requirements. Design-Build Contractor (Design Team) shall provide stamped/sealed construction documents in accordance with the requirements of Department of Veterans Affairs Program Guide PG-18-15, Volume E prior to the construction phase of this project.
Design Services include site visit(s), field investigation, and user interviews to prepare complete construction drawings and specifications to meet the following objectives:
Installation of a dry-pipe fire sprinkler system providing 100% coverage of the exiting parking structure. The sprinkler system shall be designed for expansion during an upcoming minor project, 636-508 Construct Additional Floor Parking Garage. The completed parking structure will accommodate approximately 900 vehicles. The fire suppression system will comply with all requirements listed in NFPA 1, 101 and 88A (most recent editions.) Installation of jump-deterring fencing or rollers around the upper perimeter of the existing structure. Base-bid: Provide and install 8 high anti-scale fencing around complete perimeter of the structure. Bid-alternate 1: In lieu of fencing, provide climb deterring rollers around complete perimeter of structure. Jump deterring hardware (either fencing or rollers) shall be designed with reinstallation planned after future vertical expansion.
Design Services The Design Team shall produce Construction Documents, including drawings and specifications, in accordance with professional architectural/engineering practices, the Performance of Work Statement (PWS) and, where identified, VA criteria. Where VA standards and criteria are specified, each A/E discipline shall receive a copy of their respective VA design manual, National CAD Standard Details, and Design and Construction Procedures and VHA National CAD Application Guide. The Design Team is responsible for obtaining the NCS.
The Design Team shall also provide any additional design criteria necessary for project development (supporting calculations, equipment guide list, Design and Construction Procedures, design manuals, signage design, etc.), so that the DB Team can provide construction drawings and specifications.
The Design Team, in consultation with VA Project Team, shall determine design choices based on incorporating commercial and/or VA standards into the Construction Documents.
During design and construction of the project, the Design Team will be required to participate in construction inspections and assist in the review of:
Construction Document submittals including specifications and design calculations. Shop Drawings, Product Data, and Samples Test Results, Certificates, and Other Submittals Operation and Maintenance Manuals, Training, Project Record Documents, and Warranties.
Utilize appropriate and/or edited sections of the following VA documents: VA Master Construction Specifications (PG-18-1); VA Design and Construction Procedures (PG-18-3) VA National CAD Standards Details (PG-18-4); VA Seismic Requirements (H-18-8); VHA National CAD Standard Application Guide
Provide design criteria from the following VA Design Manuals where appropriate and as determined during design: Architectural Design Manual; CPM Design Manual; Electrical Design Manual; Plumbing Design Manual; Sanitary Design Manual; Site Development Design Manual; and Structural Design Manual.
Design Deliverables: At each submission, the A/E shall date all material and present the designs on VA standard size drawings that are appropriately labeled, "SCHEMATIC SUBMISSION", DESIGN DEVELOPMENT SUBMISSION , OR CONSTRUCTION DOCUMENT SUBMISSION , in large block letters above or beside the VA standard drawing title block. In each submission, the A/E shall incorporate the corrections, adjustments, and changes made by VA at the previous review.
All submittals shall meet requirements listed in VA PG 18-15 and be submitted in the digital format requested unless otherwise noted.
SCHEMATIC DESIGN [SD-1] SUBMITTAL (35% Documents): Draft narratives, analyses, studies, calculations, and data. Provide documents in Microsoft word format. Schematic Design Development (SD) Drawings Submittal. Provide set in hardcopy and Adobe PDF format. Draft Project Specification in Microsoft Word format. Allow 21 calendar days for VA Review
DESIGN DEVELOPMENT [DD-1] SUBMITTAL (65% Documents): Mark-Ups: Report of disposition of marked-up comments or drawings showing corrective action from prior submittal responding to comments Draft narratives, analyses, studies, calculations, and data. Provide documents in Microsoft word format. Design Development (DD) Drawings Submittal. Provide full-sized (Arch C) set in hardcopy and Adobe PDF format. Final Project Specification in Microsoft Word format. Allow 21 calendar days for VA Review. Notice to Proceed with construction will occur upon acceptance of the 65% DD-1 Submittal.
CONSTRUCTION DOCUMENTS: Construction documents shall be updated and maintained throughout construction to show the current status of planned and installed elements of construction. Updated drawings shall be provided monthly in digital PDF format to the COR.

POST CONSTRUCTION SUBMITTAL/ RECORD DRAWINGS Obtain information in the form of marked-up prints, drawings, and other data certified by the construction contractor documenting changes made during the performance of the work. Review of general accuracy of information submitted and certified by the Contractor. Prepare As-Built drawings and provide digital copies to the COR in .DWG and .PDF format. Provide manufacturer s data and warranties for all installed equipment.
Construction
Construction shall commence with VA issuance of a Notice to Proceed (NTP) upon acceptance of the 65% DD Submittal. Separate NTPs may be issued for sprinkler and jump-deterrence objectives, if the DB contractor and CO agree to do so. Design Team Construction Period Services (CPS) shall be provided during the entire construction period of performance. Services to be performed under CPS include, but are not limited to the following: Pre-Construction Meeting: The Design Build Team (design and construction) shall attend a pre-construction meeting prior to the start of work. The Design Team shall review submittals, shop drawings, plans, or any other related documentation submitted by the Construction Team for compliance with the construction documents. Weekly Progress Meetings: The Design Build Team Project Leader will attend and record minutes for all meetings related to the construction contract and other meetings as determined by the Contracting Officer Representative (COR). Requests for Information (RFI) Submittals: RFIs shall be resolved by the Design Build Team and coordinated with the COR for final approval. The COR will respond to requests for RFI approval according to the following: Critical 2 days (Cost and Schedule delays) Urgent 7 days (Schedule Delays) Normal 14 days The Design Build Team shall provide change order documents, change order cost estimates, contractor proposal evaluations, recommendations and assist the VA in final price determination. The Design Team shall review and recommend approval of the O&M Manual(s). The Design Team shall coordinate any required training with the General Contractor, manufacturers, etc. to ensure that VA personnel are knowledgeable on equipment or systems. The Design Team shall provide at a minimum four (4) Construction observation site visits; minimum visits to include the following: Rough-In Inspection Final Inspection (generation of a final punch list) Punch List Completion Inspection Contractor s As-Built Drawing Verification
Post Construction Services (Record Drawings): Obtain information in the form of as-built drawings, marked-up prints, and other data certified by the construction contractor documenting changes made during the performance of the work. All information provided or gathered will be verified by the Design Team for accuracy and completeness. These drawings and information will then be incorporated into the construction drawings to produce project record drawings. Create electronic copies in AutoCAD format of all files associated with the project. Create as-built construction documents accordance with the VA National CAD Standards Application Guide. Provide all supplemental files, including fonts, plotter configurations, etc., that are required to open and plot drawings. Where drawings were created with an AutoCAD add-on program, save the files so that they can be used with AutoCAD only. Drawings shall be saved such that one file will produce one plot without manipulation of layers. Create electronic PDF files using the most recent version of Adobe Acrobat. Deliver record drawings to the VA no later than 45 days following beneficial occupancy/final acceptance of the site.
Period of Performance and Schedule. Design Phase: The contract Period of Performance for the design phase shall be 180 calendar days from the Notice of Award. Period of Performance for total design and construction is 315 calendar days from Contract Award.
The proposed schedule for Design Build services is as shown below: Project Kickoff Meeting Review VA procedures and requirements. Within 14 days of Notice of Award. SD-1 Provide a digital copy 30 days after Initial Design Meeting (44 days after Notice of Award) SD-1 Review Meeting Meeting Within 21 calendar days after VA receipt of SD-1 Submittals (65 days after Notice of Award) DD-1 Submittal (65% Drawings) Provide digital copy along with two (2) ½ sized drawing sets. 14 calendar days after SD-1 Review Meeting (79 days after Notice of Award) DD-1 Review Meeting Meeting 21 calendar days after VA receipt of DD-1 Submittals. (100 days after Notice of Award) Notice to Proceed (Construction)
15 calendar days after acceptance of DD1 submittal. (115 days after Notice of Award) Construction Completion
120 calendar days after Construction Notice to Proceed. (235 days after Notic of Award) As-Built Documents
45 calendar days after Construction Completion (280 days after Notice of Award)
DESIGN FEE SCHEDULE: Proposal Cover Sheet should indicate the breakdown of fees as below: A/E DESIGN SERVICES Schematic Design Design Documentation Construction documentation Total for Base work under this Contract As-Built Record Drawings Site Visits (each)
Additional Information/General Requirements. The Design Build Contractor(s) shall notify COR of any deviations from this document, referenced guides, manuals, or any other related document used. Approval for deviations requires a review by the Office of Healthcare Engineering. Coordinate submission requirements for deviation requests with CO/COR
Confidentiality and Nondisclosure: It is agreed that: The preliminary and final deliverables, and all associated working papers, application source code, and other material deemed relevant by VA which have been generated by the contractor in the performance of this task order, are the exclusive property of the U.S. Government and shall be submitted to the CO at the conclusion of the task order. The CO will be the sole authorized official to release, verbally or in writing, any data, draft deliverables, final deliverables, or any other written or printed materials pertaining to this task order. No information shall be released by the contractor. Any request for information relating to this task order, presented to the contractor, shall be submitted to the CO for response. Press releases, marketing material, or any other printed or electronic documentation related to this project, shall not be publicized without the written approval of the CO. Upon request and if available, any existing campus plans, inspections, directives, etc. will be provided by the VA for use in completing the design. The VA does not guarantee the accuracy and completeness of any of the data provided and Design Team shall investigate and verify the accuracy of documents that impact the design in a manner that has a direct bearing on both the design and the cost of construction.
Meetings and Conferences: The Design Team shall be responsible for attending and having appropriate representation for all design review meetings and conferences held with the VA during design services and construction period services. At a minimum, during design services, a kick-off meeting will be held virtually and a review session for each design development stage. Design Team is responsible for providing action-taken comments to design review comments provided by the VA. During CPS, at a minimum, weekly progress meetings will be held for discussion of the ongoing construction project and the Design Team shall be prepared to provide guidance on construction documents, RFI s, submittals, etc. The Design Team shall be responsible for recording and distributing all meeting minutes within two (2) calendar days of the meeting or conference. All documentation shall be in PDF format.
The Design-Build Team will be required to comply with any training requirements as necessary. Currently, course number TMS 20939 VA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access to or the Use of VA Sensitive Information is required. Employees will be required to sign documentation acknowledging that the training has been completed.
Records Management:
Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.  In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.  In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.  VA Nebraska-Western Iowa Health Care System and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of VA Nebraska-Western Iowa Health Care System or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to VA Nebraska-Western Iowa Health Care System. The agency must report promptly to NARA in accordance with 36 CFR 1230. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to VA Nebraska-Western Iowa Health Care System control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the contract documents. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4). The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and [VA Nebraska-Western Iowa Health Care System] guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with [VA Nebraska-Western Iowa Health Care System] policy.  The Contractor shall not create or maintain any records containing any non-public VA Nebraska-Western Iowa Health Care System information that are not specifically tied to or authorized by the contract.  The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.  The [VA Nebraska-Western Iowa Health Care System] owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which [VA Nebraska-Western Iowa Health Care System] shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20. Training.  All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take VHA-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training. 
Flowdown of requirements to Subcontractors
The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same.  Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.
Attachments
Parking Garage As-Built Drawings (4)
DISCLAIMER: This is a sources sought notice only. The information gathered from this request is for information and planning purposes only and will not be released. This does not constitute a solicitation. No solicitation is currently published, pending, or available. If a solicitation is issued, it will be issued at a later date. Responses to requests for information are not offers and cannot be accepted by the Government to form a binding contract. Vendor participation in this response or any informational session is not a promise of future business with the VA. The Government is not obligated, nor shall it pay for any information received from potential sources as a result of this Sources Sought Notice.

More opportunities from Department Of Veterans Affairs → Network Contract Office 23 (36C263)

Same awarding agency

NAICS: 811210
New
Federal
J065--Karl Storz Support Services IDIQ VISN 23
Solicitation # 36C26327Q0022
The Department of Veterans Affairs Network Contracting Office 23 is establishing a five-year Indefinite Delivery, Indefinite Quantity (IDIQ) contract for OEM-certified support, parts, software updates, and cybersecurity compliance for Karl Storz OR1 integrated operating room platforms across VISN 23 facilities. This brand-name only procurement covers OR1 NEO IP Video Integration Systems and OR1 AIR Systems, including various touch panels, converters, and surgical monitors. The contract has a guaranteed minimum value of 300,000.00 USD and a maximum lifetime cost limitation of 5,600,000.00 USD, with single order limitations ranging from a minimum of 2,500.00 USD to a maximum of 4,000,000.00 USD. Performance is required across multiple locations, including Black Hills, Sioux Falls, Iowa City, Fargo, St. Cloud, Minneapolis, and Central Iowa. Award will be based on a comparative evaluation process to determine the most advantageous offer, considering price and technical factors such as vendor qualifications, cybersecurity capability, and maintenance approach. The contractor must adhere to strict OEM standards, NFPA 99, and OSHA requirements, and must comply with VA Handbook 6500.6 for information security. Key deliverables include a Contractor Project Management Plan due within two weeks of award and comprehensive cybersecurity documentation, including VA Form 6550 and MDS2. Quality is monitored via a Quality Assurance Surveillance Plan where performance is rated based on the number of Contract Discrepancy Reports issued. All invoicing must be processed electronically through the VA Electronic Invoice Presentment and Payment System.
Electronic and Precision Equipment Repair and Maintenance

POSTED

about 5 hours ago

DEADLINE

in 7 days
View Details
NAICS: 238220
New
Federal
Reverse Osmosis System Modifications
Solicitation # 36C26327Q0053
Solicitation 36C26327Q0053 is a request for quotes for the Minneapolis VA Health Care System to perform modifications to its Reverse Osmosis and Deionization critical water systems. The project objective is to separate the Laboratory and Sterile Processing Service (SPS) Deionization loop, integrating the SPS loop into the existing Reverse Osmosis loop. Key requirements include separating the main critical water loop above room BA-101, removing unused dead legs, installing a new Ultraviolet sterilizer and multi-cartridge filtration system, and adding testing ports to the RO system and steam sterilizers in accordance with ST108 testing standards. The period of performance is scheduled from November 1, 2026, to January 31, 2027. This is a Women-Owned Small Business set-aside conducted under FAR Part 12 for commercial products and services, with a NAICS code of 238220. The government will make a single Firm Fixed Price award based on the Lowest Price Technically Acceptable (LPTA) basis. Prospective offerors must be registered in the System for Award Management and provide a technical proposal including manufacturer training certificates, plumbing certifications, and up to three past performance references from the last three years. All labor personnel are required to have OSHA 10 certification. Quotes must be submitted electronically to the contracting officer by 12:00pm Central time on October 23, 2026.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 5 hours ago

DEADLINE

in 2 days
View Details
NAICS: 333415
New
Federal
4120--SPECIAL Duplex Strainer - MPLS
Solicitation # 36C26327Q0054
Solicitation 36C26327Q0054 is a special, accelerated request for quotes issued by the Department of Veterans Affairs Network Contracting Office 23 for the supply and delivery of a brand name or equal Keckley duplex strainer and gasket for the Minneapolis VA Health Care System. This is a total small business set-aside conducted under FAR Part 12 for commercial products, utilizing NAICS code 333415. The government intends to award one firm fixed price contract based on the lowest price technically acceptable process. The required supplies include one 20 inch Keckley Basket Strainer (Part No. 2RFFD-FCS125P34-920) and one O-ring gasket (Part No. FT-920-Gasket), both of which must be new and unused. Technical specifications require a carbon steel shell (ASTM A 53 Grade B), a 304 stainless steel basket with 1/8 inch perforations, and a modular design where individual sections do not exceed 2,000 pounds. The period of performance is from November 9, 2026, to March 15, 2027, with all items delivered FOB Destination to Minneapolis, Minnesota, by the end date. Prospective offerors must be registered in the System for Award Management and the SBA Small Business Search. Quotes are due by 10:00 AM on October 30, 2026, and must be submitted via email to Robert Bennett. Submissions must be divided into two volumes: Volume I for pricing and administrative compliance (including a signed SF 1449 and UEI number), and Volume II for technical qualifications, including a narrative of the offeror's ability to complete the work and subcontractor details. Evaluation will be based on technical acceptability and a fair and reasonable total price.
Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing

POSTED

1 day ago

DEADLINE

in 9 days
View Details
NAICS: 531120
New
Federal
Expression of Interest - New Replacing Lease - Davenport CRRC
Solicitation # 36C26326R0069_2
The Department of Veterans Affairs, through Network Contract Office 23, is seeking Expressions of Interest for a new-replacing PACT compliant Community Residential Recovery Center (CRRC) leased premise in Davenport, Iowa. This market research effort aims to identify qualified business concerns for the design, construction, and management of a federal leased facility for a term of up to 20 years, with a planned occupancy date of October 2028. The government is specifically evaluating the availability of Service-Disabled Veteran Owned Small Businesses (SDVOSB) and Veteran Owned Small Businesses (VOSB) under NAICS code 531120 to determine if the project can be set aside for these entities. Eligible properties must meet strict pass/fail criteria, including being located outside a 100-year floodplain, providing at least 70 parking spaces within 500 feet of the entrance, and being within 0.5 miles of public transportation. The facility must be a contiguous ground-level space that adheres to ABAAS, VA Barrier Free Design Standards, and Department of Justice vulnerability assessments. Interested parties must submit a Capabilities Statement demonstrating experience with at least three similar federal or healthcare projects from the last five years, evidence of a $100,000 bid bond capacity, and proof of SDVOSB or VOSB status via VetCert and SAM.gov.
Lessors of Nonresidential Buildings (except Miniwarehouses)

POSTED

1 day ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS