This Government Contract opportunity from Department Of Veterans Affairs was posted on May 10, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y1DZ--Renovate Surgery Out-patient Clinic (436-23-104)

Awarded
36C25923R0026Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

about 7 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of the plant featuring a packaged Membrane Bioreactor, headworks, UV disinfection, SCADA systems, and various support buildings; decommissioning and demolition of existing facilities; and finish facilities including the Walnut Avenue extension and a second sludge handling unit. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and agree to the Overaa standard agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Performance and labor bonds for 100 percent of the subcontract price may be required, and all subcontractors must provide a waiver of subrogation endorsement for workers compensation insurance.
C. Overaa & Co.

POSTED

about 7 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The Department of Veterans Affairs Network Contract Office 19 awarded contract 36C25923C0069 to Copper Creek LLC for the renovation of the Surgery Out-patient Clinic at the Montana VA Health Care System in Fort Harrison, Montana. The project, valued at 358,888.00 dollars, involves the renovation of six rooms on Level 3 of Building 154, specifically Procedure Room 373 and Rooms 344, 345, 346, 371, and 372. The scope of work includes selective demolition and the installation of new interior finishes, LVT flooring, wall protection, casework, and acoustical ceiling systems. Additionally, the contractor is responsible for upgrading mechanical, electrical, plumbing, fire sprinkler, fire alarm, nurse call, security, and medical gas systems. All work must comply with ADAAG, ABAAS, and VA Barrier Free Design Standards, as well as NFPA, NEC, and Joint Commission Accreditation Standards. Because the project occurs within an occupied healthcare facility, strict Infection Control Risk Assessment (ICRA) Class III, Group 2, Type C measures must be maintained to minimize impact on patients and staff. The period of performance is 120 days from the issuance of the Construction Notice to Proceed. Deliverables include electronic as-built drawings in AutoCAD and PDF formats, operation and maintenance manuals, and a one-year warranty covering all work and materials.

General Info

Contract Value

$540,449.81

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

CO, USA

Set-Aside

SDVOSBC

Award Issued Date

Documents

14

36C25923R0026 Amendment 0002

DOCX, High priority: read this first2 pages · amendment
High

36C25923R0026 Renovate Surgery Outpatient Clinic - Contractor Q&A

PDF, High priority: read this first6 pages · q-and-a
High

36C25923R0026 - Surgery Out-Patient Clinic Renovations

DOCX, High priority: read this first57 pages · rfp
High

436-23-104 Specifications Divisions 21-28

PDF, High priority: read this first527 pages · specifications
High

436-23-104 Urology Level 3 Hospital Renovations Specifications

PDF, High priority: read this first310 pages · specifications
High

A-154.02 Level 03 Floor Plan - VAMC Fort Harrison

PDF, High priority: read this first1 page · specifications
High

Amendment 0001 to Solicitation 36C25923R0026

DOCX, High priority: read this first2 pages · amendment
High

Room 373 Notes and Measurements

PDF, High priority: read this first4 pages · specifications
High

S02+ DWG.3 373 Reno Notes - HVAC Floor Plans Systems

PDF, High priority: read this first19 pages · specifications
High

SOW - Renovate Surgery Out-Patient Clinic (VA Montana Healthcare System)

DOCX, High priority: read this first5 pages · sow
High

VAMC Project 436-23-104: Urology Level 3 Hospital Renovations CD Set

PDF, High priority: read this first14 pages · specifications
High

36C25923C0069 - Renovate Surgery Out-patient Clinic

DOCX, Low priorityaward
Low

Photos - Q&A No. 25

DOCX, Low priority4 pages · q-and-a
Low

Pre-Construction Site Visit Attendance - Renovate Surgery Out-patient Clinic (36C25923R0026)

PDF, Low prioritysite-visit-attendance
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline changed from Feb 9, 2023 to Feb 7, 2023. Set-aside added: Service-Disabled Veteran-Owned Small Business Set Aside.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Network Contract Office 19 (36C259)
Contacts1 person available
OfficeGreenwood Village, CO, 80111, USA
Office AddressGreenwood Village, CO, 80111, USA
Contacts
Jared DettonContracting Specialist

Full Description

Show more
Rocky Mountain Network 19 | Montana VA Health Care System (436) 3687 Veterans Drive | P.O. Box 1500 Fort Harrison, MT 59636-1500 1.877.468.8387 | 406.442.6410 www.montana.va.gov Statement of Work Renovate Surgery Out-Patient Clinic Scope: The VA Montana Healthcare System requires the services of a General Contractor for the renovation of six rooms on Level 3 of Building 154 as indicated in the drawings. Americans with Disabilities Act (ADAAG Standards), Architectural Barriers Act Accessibility Standard (ABAAS) and the VA Barrier Free Design Standards will be implemented throughout the renovation. Renovation work is to include but not limited to all new interior finishes, wall protection, replacement doors and hardware, mechanical and electrical system upgrades, fire sprinkler, fire alarm, building integrated medical equipment, nurse call, security and medical gasses. The Contractor shall also be responsible for all damages to persons or property that occurs as a result of the Contractor s fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract. Existing Site Conditions. Construction will occur on Level 3 of Building 154 just West of the main hospital elevator. ICRA Requirements: The project will take place in an occupied healthcare facility and the construction activities will require construction to be phased in such a way as to minimize impact to staff and patients. Infection Control measures will be required at all times as defined in ICRA assessment, Class III, Group 2, Type C. Construction activity will require constant coordination with VA personnel. Work shall be completed in conformance with the time schedule requested by the VA Contracting Officer s Representative (COR). The Contractor is solely responsible for preparing all necessary regulatory notifications to meet the time schedule. Site Investigation is required for this project to ensure accuracy of design. The Contractor shall be responsible for field verifying all conditions and quantities that may affect the project work prior to bid of this project. The final construction shall conform to all VA requirements outlined in the FGI Guidelines for Design and Construction of Hospitals, Facilities Guideline Institute (FGI), ADA, Joint Commission Accreditation Standards, ANSI, SMACNA, IBC, NEC, NFPA as well all requirements of the VA design manuals posted by discipline in the VA Technical Information Library at the following web address: http://www.cfm.va.gov/til/dManual.asp Due to requirements in NFPA 101 Life Safety Code, a minimum of two egress routes for each occupied space must be maintained after an allowable common path of travel distance of 100 feet (per NFPA 101 Paragraph 18.2.5.3. To ensure the safety of VA patients, staff, and tenants, work is to be structured to allow for egress routes to be maintained throughout the course of construction. Work requiring relocation of tenants, is subject to notification requirements. If Contractor provides a schedule resulting in any violations of NFPA 101 Life Safety Code during any work, they must also submit proposed interim life safety measures for VA review. Any action necessitated by NFPA 101 Life Safety Code will be the responsibility of the Contractor. Background and Facility: Existing Site Conditions, the project will take place in an occupied healthcare facility and the construction activities will require construction to be phased in such a way as to minimize impact to staff and patients. Construction activity will require coordination with VA Contracting Officers Representative (COR) and designated VA personnel. All demolition shall be required to remove abandoned utilities back to active main (e.g., medical gases, water); site investigative efforts are to facilitate that component of the work. Construction Requirements: Construction of the above documented project scope must meet all applicable codes, regulations, and standards. This includes but is not limited to NFPA Codes, NEC, EPA (specifically conduction of NEPA), MT DEQ Regulations, OSHA 1926, ASTM and TJC Standards. Additionally, the General Contractor and its Sub-Contractors are required to meet all applicable laws and regulation not explicitly stated in this document. All efforts and products shall be conducted and produced in compliance with VA Publications including Master Construction Specifications, Design Guides, and CAD Standards (http://www.cfm.va.gov/TIL). Submittals issued during construction will be limited to all MEP components. Associated architectural submittals will be agreed upon prior to commencing construction. Upon completion of construction, contractor will produce As-Built drawings to the VA. As-Built drawings to be provided electronically in both AutoCAD and PDF. These drawings are to be stamped as AS-BUILT . Operational and Maintenance manuals provided are to include a single hard copy and a complete three electronic copies. Projects are to be assessed for impact to Patient Care utilizing an Infection Control Risk Assessment (ICRA) in advance. Where the ICRA is found to represent significant impact to the means and methods of construction of individual tasks, the requirements of the ICRA will be included on a drawing sheet for each tasking. Additional impacts identified by the VA may be required to be included in the drawing sets to address other impacts to construction as a means of ensuring continuation of operations is maximized throughout the construction period. 4. Schedule All work efforts as related to construction are to be completed in duration not to exceed 90 calendar days (i.e., see Period of Performance section for full details). 5. As-Builts Drawings Following Construction, the General Contractor and its Sub-Contractors shall complete as-built drawings and furnish them electronically in PDF format on a removable storage format to the VA. 6. Post-Construction Quality Validation Within the specification, the General Contractor is to specify a one-year warranty period covering defects related to all work and materials/equipment included in the project. The General Contractor is to review the project in its entirety and determine oversight or resource requirements to enhance sustainment and limit need for warranty period services. Factory start-up is required of all applicable equipment included in the project. Where failures during the warranty period are attributable to an element of the design, the General Contractor and their sub-contractors are to provide consultation and re-design services at no cost to allow for remediation. Mandatory Tasks: Required Submittals Construction and Phasing Schedule Proposed Utility Shut-off Schedule Mechanical equipment, mechanical equipment layout, ductwork and ducting layouts and diffusers. Electrical power, Low Voltage and Lighting layouts. Plumbing Fixtures and associated appurtenances. Fire suppression and installation layouts. Fire alarm and smoke detection device and installation layout. Roofing materials, roof installation details, roof penetration and curb details and warranty information. Interior and wall protection finishes. Submittals must be reviewed and approved by the VA prior to the start of work. All demolition shall be required to remove abandoned utilities back to active main. All selective demolition will be performed at the time of each proposed phase of construction. Any additional selective demolition outside of the current phase of work will need to be approved by the COR. All selective demolition is to occur after normal working hours and limited to a single work shift. Contractor shall be responsible for all construction debris removal. The contractor shall provide their own dumpster as needed. Dump carts are to be sealed with a tight-fitting lid during travel to and from the jobsite to the designated dumpster location. Dumpster location and debris removal pathway to be approved by the VA COR. Work area and debris removal pathways from the jobsite to the dumpster to be kept vacuum clean at all times. All damage to floors, walls, ceilings, or any other VA property to be repaired/replaced by the contractor. Installation shall minimize penetrations in finished walls to the extent possible and with any such penetrations repaired to match existing construction or meet and/or exceed required sound transmission coefficient (STC), smoke/fire partition rating requirements after completion of work. Any new construction shall match surrounding finishes unless indicated otherwise. Any new electrical power and lighting work shall tie into closest available circuit or panel. Contractor and their Sub-contractors are to provide necessary submittals and plans for approval prior to commencing with any new work not shown/provided in the construction documents. The intent is for existing mechanical systems to be reused as much as possible without significant modification or alteration to the existing system. Contractor and their Sub-contractors are to provide necessary submittals and plans for approval prior to commencing with any new work not shown/provided in the construction documents. Temporary egress and life safety signage to be provided by contractor and any ILSMs required shall be coordinated with VA COR and VA safety personnel. Fire sprinkler protection must be maintained at all times. Sprinkler heads located within ceiling tiles must be re-installed at the end of every work shift. Contractor shall coordinate the removal of existing ceilings with the installation of new ceiling grid and new ceiling tiles. If not, the installation of temporary upright sprinklers will be required. After work is complete, new pendent sprinklers must be installed as sprinklers which are removed cannot be reinstalled. To maintain the use of non-rated construction barriers, fire sprinkler coverage must be maintained at all times. If for any reason planned sprinkler outages cannot be limited to a single work shift, the installation of fire rated barriers will be required to separate the affected construction area. Temporary barriers, as indicated on the proposed Phasing Plan, are just that, temporary. Temporary barriers are to be considered non-rated construction barriers. Temporary barriers are limited to a single work shifts only. Temporary barriers will be erected at the beginning of the work shift and dismantled in their entirety at the end of the work shift. Temporary barriers should seal tightly at walls and ceilings. Entry doors should have either magnetic or zipper seal. Temporary barriers should be able to withstand the use of negative air pressure within the work zone/containment area. Use of pre-manufactured, re-usable barriers panels is acceptable. Use of fire-retardant sheet plastic barriers is acceptable as long as the plastic barrier is free from punctures, rips or tears. Use of tape or similar patches will not be allowed. The entire plastic barrier is to be replaced at the contractor s expense. See Section 01 35 26 Safety Requirements for additional information and clarity. Hard wall barriers, as indicated on the proposed Phasing Plan are to be interior partitions constructed to a minimum 1 Hour rating throughout the duration of the proposed phase. Hard wall barrier to meet/exceed UL U419 assembly, interior partition Steel stud, Non-Load bearing. See Section 01 35 26 Safety Requirements for additional information and clarity. At no time will Hard wall barriers be allowed to span a corridor unless indicated on the Phasing Plan and/or approved by the COR during construction. Description of Work: Level 3 of Building 154 Selective Demolition (as indicated in drawings) - Procedure Room 373: vinyl composite tile flooring, headwall units and associated medical gasses, power devices, data devices, nurse call devices, miscellaneous low voltage devices, recessed light fixtures, abandoned junction boxes, mechanical radiator units, handwash sink and faucet set, tile finishes, ACP ceiling system, ceiling light fixtures and existing linear diffusers. Selective Demolition (as indicated in drawings) Rooms 344, 345, 346 371 and 372: vinyl composite tile flooring, headwall units and associated medical gasses, power devices, lighting control devices, data devices, nurse call devices, miscellaneous low voltage devices, recessed light fixtures, abandoned junction boxes, shower and tile, handwash sink and faucet set, tile finishes, ACP ceiling system, ceiling light fixtures and existing linear diffusers. Existing patient lift system to be removed by the General Contractor and returned to the VA COR or VA COR s designated representative. Procedure Room 373 (as indicated in drawings): Work to include but not limited to LVT flooring, flooring transitions, wall base, partitions, interior wall finishes, privacy curtains, window treatments, wall protection, pre-manufactured casework and countertops, acoustical ceiling tile and ceiling grid, light fixtures, lighting controls, mechanical diffusers, mechanical controls, electrical power devices, plumbing fixtures and faucet controls, fire suppression, fire alarm devices, nurse call devices. Coordinate associated MEP trades as needed to complete the work as needed for clinic occupancy. Rooms 344, 345, 346, 371 and 372 (as indicated in drawings): Work to include but not limited to LVT flooring, flooring transitions, wall base, partitions, interior wall finishes, privacy curtains, window treatments, wall protection, pre-manufactured casework and countertops, acoustical ceiling tile and ceiling grid, light fixtures, lighting controls, mechanical diffusers, mechanical controls, electrical power devices, plumbing and faucet controls, fire suppression, fire alarm devices, nurse call devices. Coordinate associated MEP trades as needed to complete the work as needed for clinic occupancy. Period of Performance: Upon award of this project, the Contractor is required to attend the pre-construction meeting where it will be determined whether an Administrative Notice to Proceed (ANTP) will be issued. During this time all required pre-construction submittals such as, safety plans, quality control plan, phasing, schedules, materials submittals, certifications, etc. shall be provided for VA review and approval. Additionally, the ANTP is when the Contractor will place orders for any required equipment and materials due to increases in lead times, fuel surcharges and material costs. Following satisfactory submission of all pre-construction submittals and the arrival of required equipment and materials, a Construction Notice to Proceed (CNTP) will be issued. Thus, the period of performance for this project is 120 days from the CNTP. Work Performed After Hours: Work is expected to be performed after hours to maintain construction schedule and to provide access to the hospital during normal working hours. All Work that is to occur after Normal working hours and limited to a single work shift. After Hours, Single work shift hours, Monday - Friday, are from 4:30 PM to 7:30 AM. If portions of the afterhours Work need to be extended to be completed during Normal working hours, work performed during Normal working hours will need to be approved and coordinated by the VA Contracting Officers Representative (COR). In order to maintain schedule, work performed over the weekend, particularly overhead and new ceiling work will be allowed. Contractor to coordinate these efforts with VA COR with a minimum 48-hour notice. Privacy Statement Information Security: The C&A requirements do not apply; a Security Accreditation Package is not required. Incidental exposure to protected health information may occur from accessing the work site. Staff will follow all Privacy & Security policies and procedures. Appendix DWG.1 Urology L-3 Hospital Renovations Combined CD Set 11.10.22 DWG.2 B154_Architectural _Third_Floor DWG.3 373 Reno Notes HVAC_FloorPlans Systems DWG.4 Room 373 Notes and Measurements 436-23-104 Specifications Divisions 1-13 436-23-104 Specifications Divisions 21-28

More opportunities from Department Of Veterans Affairs → Network Contract Office 19 (36C259)

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS