Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on June 25, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Yakima Delta 1135 Causeway Removal

Closed
W912EF25RSS32Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 12 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualifications from Design Build Entities for the design and construction of eight new pickleball courts with lighting at Garden Grove Park. This project, estimated to cost between 1,000,000 and 1,200,000 dollars, includes all labor, materials, engineering, and construction services, including site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to California Public Contract Code Section 20164 and Garden Grove Municipal Code. While the contractor is responsible for most testing and inspections, the City will retain a third-party consultant specifically for soil compaction testing. The procurement follows a two-step process where the City will first shortlist the three highest-scoring firms based on experience, technical capabilities, safety records, and financial capacity. These shortlisted firms will then be invited to submit a proposal for final selection based on best value. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a Certification Form, a Firm Information Form, and a Surety Declaration Form confirming the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 13 hours ago

DEADLINE

in 24 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Richland, WA, 99352, USA

Set-Aside

NONE

Documents

1

Plan Causeway Removal - Draft Design

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → US Army Engineer District Walla Wal
Contacts2 people available
OfficeWALLA WALLA, WA, 99362-1876, USA
Office AddressWALLA WALLA, WA, 99362-1876, USA

Full Description

Show more
Yakima Delta 1135 Causeway Removal Sources Sought Notice: W912EF25RSS30 The US Army Corps of Engineers, Walla Walla District is seeking interested sources for a construction project entitled: Yakima Delta 1135 Causeway Removal. The North American Industry Classification System (NAICS) code for this project is 237990 Other Heavy and Civil Engineering Construction and the associated small business size standard is $45,000,000.00. Performance and payment bonds will be required. The magnitude of construction is estimated to be between $10,000,000 and $25,000,000. This sources-sought announcement is a tool to identify businesses with the capability to accomplish the work. This is not a solicitation. Only those firms who respond to this announcement by submitting the following information will be used in determining whether to set aside this requirement. A). A list of current or past projects demonstrating technical experience with work of a similar nature to that listed in the Summary Scope of Work. For each project submitted, provide a brief narrative statement of the work involved, your firm's role in the project, performance period, the dollar value and the completion date. Include a statement detailing any special qualifications and certifications, applicable to the scope of this project, held by your firm and/or in-house personnel. If any of the experience is that of a subcontractor, please specify that information in your response. Also include in your response answer to the following questions: How much time preparation of site is anticipated before in-water construction start date? Provide a list of your Key Personnel that would be part of the team on this work with in your narrative and what roles they would support during this type of project. B). A reference list for each of the projects submitted in A) above. Include the name, title, phone number and email address for each reference. C). Provide a statement of your firm's business size (Large Business, Small Business, HUBZone, Service Disabled Veteran Owned, 8(a), small disadvantaged, or woman-owned) with regards to the NAICS code listed above. D). Provide a statement that your firm intends to submit an offer on the project when it is advertised. E). Provide a statement of your firm's bonding capacity. A statement from your surety is NOT required. F). UEI number and Cage Code. Submit this information to LeAnne Walling, Contract Specialist, via email to contact@example.gov and contact@example.gov. Your response to this notice must be received on or before 3:00 p.m. (PST) on 9 July 2025 Summary of Scope of Work: This construction project includes removal of causeway material, selective demolition and removal of existing features, earthwork, concrete, vegetation, and in-water work necessary to restore the aquatic habitat. Earthwork is required to grade, stabilize, and install material along the shoreline. Avoidance of Bateman Island is necessary to minimize impacts to culturally sensitive areas. Material will be hauled offsite to an approved disposal site within 10 miles of construction site. Approximately 30,000 CY of material will require hauling from the causeway removal. See below for 60% design detail. See Attached Sketch titled: Sketch 25RSS30 In-water work window: Dec 1, 2025-Feb 28, 2026 Anticipated Award date is early-mid Dec. 2025 Physical Completion anticipated March 2026 All on-site work shall be performed in accordance with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1). The Contractor will be responsible for establishing and managing an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance. In addition, the Contractor will be required to develop and submit for Government acceptance Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that comply with EM 385-1-1. A Site Safety and Health Officer (SSHO) employed by the prime contractor shall be required for each shift of the contractor's on-site operations. The SSHO shall possess a minimum of 5-years experience in construction safety on similar projects, shall have completed the 30-Hour OSHA Construction Safety training within the last 5-years, and shall have completed at least 24-hours of formal safety training each year for the past 5-years. The Contractor will be responsible for establishing and managing an effective Contractor Quality Control (CQC) System that will require the development and submission of a comprehensive project specific CQC Plan for Government acceptance. A CQC System Manager employed by the prime contractor shall be required to be on-site for each shift of the Contractor's operations. The CQC System Manager must possess a minimum of 5-years relevant experience in a supervisory or management position such as Quality Control Manager, Quality Assurance Manager, or Construction Manager directly involved in the management of construction quality at the project site. In addition, the CQC System Manager shall have completed the course entitled - Construction Quality Management for Contractors within the last 5-years. The Contractor will be required to use the Government-furnished Construction Contractor Module (referred to as QCS) of the Resident Management System (RMS) to record, maintain, and submit various information throughout the contract period. QCS is a Windows-based program that can be run on a stand-alone personal computer or on a network. The Government will make the QCS software available to the Contractor after contract award. The project will involve the development and management of Contractor furnished submittals for items such as pre-construction plans, product data, test reports, and contract close-out documentation as required by the technical specifications of the contract. Miscellaneous work within the project includes the delivery of As-Built Drawings.

More opportunities from Department Of Defense → US Army Engineer District Walla Wal

Same awarding agency

NAICS: 332812
New
Federal
Dworshak Skeleton Bay Draft Tube Bulkhead Rehabilitation
Solicitation # W912EF27QA0020001
The US Army Corps of Engineers, Walla Walla District, is soliciting bids for the rehabilitation of twelve draft tube bulkheads and associated seal keeper bars at Dworshak Dam. This total small business set-aside project, under solicitation W912EF27QA0020001, requires the contractor to provide all personnel, materials, and equipment necessary to transport the bulkheads from the dam to their repair facility and return them upon completion. The scope of work includes the removal of existing coatings, performing weld repairs, and applying new coatings. The project is divided into phases with specific pickup and return windows occurring between November 2026 and July 2027. All transportation must be coordinated with the Contracting Officer at least 15 calendar days in advance and conducted Monday through Thursday during specified hours. Technical requirements are stringent, requiring 100 percent inspection of all welds using Visual Testing and Magnetic Particle Testing in accordance with AWS D1./D1.M. Coating applications must meet specific dry film thickness standards, with a minimum average of 7.0 mils for the completed system. The contractor must provide a third-party certified coatings inspector and ensure all paint materials are certified by the CERL Lab. To be considered technically acceptable, bidders must submit specific pre-award documentation, including SSPC QP 3 or AISC Complex Coating Endorsements, paint product datasheets for System 5-E-Z, manufacturer warranties, and qualifications for both weld inspectors and welding operators. Government representatives will conduct internal inspections at the contractor's facility following the removal of existing coatings.
Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers

POSTED

about 17 hours ago

DEADLINE

in 3 days
View Details
NAICS: 811310
New
Federal
LLA Fish Pump - Motor Rewind
Solicitation # W912EF27QA006
Solicitation W912EF27QA006 is a combined synopsis and request for quotation issued by the US Army Engineer District Walla Walla for motor rewind and asbestos abatement services at the Lower Granite Dam in Pomeroy, Washington. The scope of work involves the rewinding, refurbishing, and addition of eight resistance temperature detectors to three polyphase AC squirrel cage induction motors used for fish pumps. This includes one Hitachi dual winding motor and two Ideal Electric single-winding motors. To ensure operational continuity, the project will be executed by rewinding one motor per year, with a total performance period extending through December 2029. The contract is a firm-fixed-price acquisition and is not set aside for small business concerns, although evaluation preferences are provided for HUBZone small businesses. Key technical requirements include the use of a minimum class F motor insulation system and strict adherence to core loss and hot spot specifications. Deliverables include the refurbished motors, final operation and maintenance manuals, and on-site commissioning support. The government has established a seven-business-day window for the acceptance or rejection of services following delivery. Liquidated damages are specified for delays, with daily rates increasing annually from FY28 through FY30. Offerors must comply with various federal regulations, including the Buy American and Balance of Payments Program, E-Verify personnel screening, and DFARS cybersecurity reporting standards.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

6 days ago

DEADLINE

in 27 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS