Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on March 9, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--ADMINISTRATION BUILDING ROOF RESHINGLE

Awarded
W9128F-10-M-G008Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 6 hours ago

DEADLINE

in 3 days
NAICS: 238160
New
SLED
Request for Qualifications for Trade Contractors for 158 Spring Street - ROOFING AND FLASHING ONLY
Solicitation # COC-RFQ-FY27-31162RF
The City of Cambridge is seeking prequalified Trade Contractors for roofing and flashing services as part of a comprehensive renovation of the former Kennedy-Longfellow School, a 101,590 square foot structure located at 158 Spring Street. This procurement is conducted under M.G.L. c.149A Construction Management at Risk, with the specific roofing and flashing trade estimated at 55,571.00 dollars. The overall project duration is approximately 12 months from the notice to proceed. The selection process consists of two phases, beginning with a prequalification phase where firms must submit a Statement of Qualifications (SOQ) via the City's e-Procurement Portal by November 12, 2026. To be eligible for the subsequent bidding phase, firms must achieve a minimum total score of 70 points, with specific minimums required in references and project capacity categories. Mandatory requirements include a valid DCAMM Sub-bidder Certificate of Eligibility, a commitment letter for payment and performance bonds at 110 percent of the estimated contract value, and a 10-hour OSHA-approved safety certification. Applicants must submit a comprehensive package including Trade RFQ Form 1 prior to the SOQ application, along with various schedules detailing business ownership, management personnel, five years of similar project experience, and a three-year workers compensation modifier history. Additional compliance mandates include adherence to the Cambridge Employment Plan, the Responsible Employer Plan, the Living Wage Ordinance, and Minority Business Enterprise programs. All submissions must be electronically filed, and any packages received after the deadline will be rejected.
Capital Buildings Projects

POSTED

about 21 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

This contract involves the removal of 5,800 square feet of cedar shake roofing and the installation of a stone coated metal roof shake system, equivalent to or better than the DECRA Roofing System, for the US Army Corps of Engineers Administration Building near Yankton, South Dakota. The scope of work also includes replacing existing gutters and downspouts with brown 6 inch .032 gauge aluminum seamless gutters and 3 by 4 inch downspouts. The project must be completed within 30 days of the Notice to Proceed, including final cleanup. Award selection is based on best value rather than the lowest bid, with primary consideration given to past experience, supplied materials, and completion time. The contractor is responsible for all labor, materials, and the protection of existing facilities, and must adhere to EM 385 1 1 safety requirements and environmental regulations. Materials are subject to approval by the Contracting Officer's Representative and carry a one-year general guarantee, while the roofing manufacturer must provide a 50-year limited warranty. Payment will be issued within 30 days of government acceptance and receipt of a proper invoice.

General Info

Contract Value

$50,074

NAICS

238160 - Roofing Contractors

Place of Performance

NE, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
ContactsNo contacts available
OfficeOMAHA, NE, 68102-4901, USA
Office AddressOMAHA, NE, 68102-4901, USA
ContactsNo contact information available

Full Description

Show more
RESHINGLE ADMINISTRATION BUILDING ROOF FOR THE US ARMY CORPS OF ENGINEERS, GAVINS POINT PROJECT, LOCATED NEAR YANKTON SD. QUESTIONS CONTACT DAVID A. BECKER, CO, @ +1 (555) 000-0000. SCOPE OF WORK: 1. SCOPE OF WORK: Contractor shall be responsible for all labor and material required to remove the existing 5800 SF of Cedar Shake roofing material and properly dispose of such material. Replace that material with a stone coated metal roof shake (Shake XD no exposed fasteners) better than or equal to the DECRA Roofing System. All work shall be completed as per the enclosed drawings and specifications. Contractor will also be responsible for the removal of the existing gutters and downspouts and replaced with 6 .032 gauge aluminum seamless gutters and 3 in X 4 in downspouts, brown in color. 2. BEST VALUE: Award to the successful contractor shall be based on Best Value rather than low bid per FAR regulation 52.212-2 EVALUATION (JAN1999).The bids will be based on the following factors: a. Past experience of similar work b. Contractor supplied materials and equipment. c. Time for completion of contract. d. Price. Items a, b, and c when combined, are significantly more important than price. 3. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: The Contractor will be required to commence work under this contract on the date of receipt by him of Notice to Proceed, to prosecute said work diligently and to complete the entire work with in 30 days. The time stated for completion shall include final cleanup of the premises. 4. CONTRACT DRAWINGS AND SPECIFICATIONS: Omissions from the drawings or specifications or the misdescription of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or which are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work but they shall be performed as if fully and correctly set forth and described in the drawing and specifications. The Contractor shall check all drawings furnished him immediately upon their receipt and shall promptly notify the Contracting Officer of any discrepancies. 5. SITE VISIT: Offerors or quoters are urged and expected to inspect the site where the work will be performed. 6. APPROVAL OF MATERIALS: The Contracting Officers Representative shall approve all materials before being used in subject contract. 7. SPECIAL REQUIREMENTS: Improper submittal of items listed in line 2. Best Value and incomplete paper work required on the Request For Quotations section will be viewed as an incomplete submission and will not be considered for award. 8. TAXES Nebraska. 8.1. NEBRASKA SALES AND EXCISE TAX. Materials installed under this contract are not exempt and the tax must be included in the amount bid. Telephone: +1 (555) 000-0000 (Department of Revenue-Omaha). 9. PROTECTION OF EXISTING FACILITIES: Contractor shall be responsible for protection of the building from any damage that may occur to the building during the construction. Any damage done to the building due to the construction shall be repaired at the cost of the contractor. 10. ENVIRONMENTAL PROTECTION: In order to prevent, and to provide for abatement and control of any environmental pollution arising from the construction activities in the performance of this contract, the Contractor and his sub contractors shall comply with all applicable federal, state and local laws and regulations concerning environmental pollution control and abatement. a. Notification: The Contracting Officer will notify the Contractor in writing of any non compliance with the aforementioned federal, state or local laws or regulations. Such notice, when delivered to the Contractor or his authorized representative at the site of the work, shall be deemed sufficient for the purpose. The Contractor shall, after receipt of such notice, immediately inform the Contracting Officer of proposed corrective action and take such action as may be approved. If the Contractor fails or refuses to comply promptly, the contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall make the subject of a claim for extension of time or no part of the time lost due to any such stop orders for excess costs or damages. 11. SAFETY REQUIREMENTS: The Contractor shall ensure that safe working practices are utilized and that all equipment meets the requirements of the US Army Corps of Engineers, Safety and Health Requirements Manual, EM 385 1 1, September 1996, before work begins. A copy of the above manual is available at the Gavins Point Dam Project Office, Yankton, South Dakota. a. Ground Fault Circuit Interrupters: In addition to the requirements of paragraph 11.C.05 of EM 385 1 1, ground fault circuit interrupters are required for all extension cord systems. b. First Aid and Medical: First aid facilities shall be made available on the job site. Arrangements for emergency medical attention shall be made prior to start of work. All emergency numbers (doctor, hospital, ambulance, fire department) shall be posted, or made available at the work site. 12. HOUSEKEEPING: Daily clean up of all debris and waste materials are required. Adequate disposal containers shall be placed strategically around the site. Debris shall be removed on a regular basis. 13. AVAILABILITY AND USE OF UTILITY SERVICES: Use of public and private utilities will be as found available. The Contractor shall make his own arrangements for use of public and private utilities. 14. WORK AND MATERIALS GUARANTEE: The Contractor will guarantee materials for one year from the date the Government assumes use of the equipment or materials. 15. PAYMENT: Payment for subject work will be for entire work complete in conformance with this specification and drawings, and paid within 30 days of acceptance by the Government and receipt of a proper invoice. SECTION 07314 STONE COATED METAL ROOF SHAKE XD PART 1 GENERAL 1.1 SUMMARY A. Related Documents: Provisions established within General and Supplementary Conditions of the Contract, Division 1 - General Requirements, and the Drawings are collectively applicable to these Section. B. Section includes: Formed metal roofing panels with colored stone chip finish. C. Associated metal flashings. D. Related Sections: 1. Section383945 Rough Carpentry for framing and sheathing. 1.2 SUBMITTALS A. Submit under provisions of Section 01300 B. Product Data: Include construction details, material descriptions, dimensions of individual components and profiles, finishes, fasteners, accessories, and manufacturers written installation instructions. C. Samples for Initial Selection: Manufacturers colors, textures, and patterns available for each type of Shake indicated. 1.3 QUALITY ASSURANCE A. Regulatory Requirements: 1. Conform to applicable building code for roof assembly fire hazard requirements. 2. Conform to building code for minimum wind uplift resistance. 1.4 REFERENCES A. Fire Test-Response Characteristics; Provide Shake XD with fire-test-response characteristics indicated, as determined per test method ASTM E 108 Test for Fire Resistance of Roof Covering Materials, for application and slopes indicated. 1. Fire Test Exposure: Class A. B. ASTM A792/A792M: Sheet Steel, Aluminum-Zinc Alloy Coated by the Hot Dip Process, Structural (physical) Quality. C. UL 1897 and UL 580: Wind Uplift Resistance of Roof Assemblies. D. ASTM C920: Specification for Elastomeric Joint Sealants. E. Impact Resistance: UL 2218, Class 4. F. Appraisal Certificates: 1. International Code Council, Wittier California, Report Nos. ICC Legacy Report ER-4361 (UBC), EST-1753 (IBC), ESR-1754 (IBC). 2. Underwriters Laboratories, Inc., Northbrook, Illinois, USA File No. R14710. 3. Canadian Construction Materials Center, Ottawa, Ontario, CCMC#10241-R, Issued 1983 re-evaluated 2002-06-21 1.5 DELIVERY, STORAGE, AND HANDLING A. Store and handle roofing materials to ensure dryness. Store in a dry, well-ventilated, weather tight place. Protect from corrosion, staining and traffic and wind damage. 1.6 WARRANTY A. Manufacturing Warranty: Written, transferable, limited warranty provided by Roofing Manufacturer, covering manufacturing defects/excessive granule loss. Refer to warranty for specifics. 1. Warranty Period: 50 years from date of Substantial Completion. 2. Wind Warranty: 120 mph winds, full warranty period. 3. Hail Penetration: full warranty period. PART 2- PRODUCTS 2.1 MANUFACTURER A. Better than or equal to the DECRA Roofing Systems, 1230 Railroad Street, Corona, CA 92882 (+1 (555) 000-0000), (+1 (555) 000-0000 FAX). 2.2 MATERIALS A. Metal Shake XD: Shake interlocking panels resembling traditional roofing shakes. 1. Material: Pre-corrugated, pressure formed, Aluminum-Zinc Alloy Coated Steel with seven individual shake pans. 2. Finish: Ceramic Coated, colored stone chip finish. 3. Thickness: 26 Gage, .0179 inches 4. Size: 14-1/2 wide by 52-1/8 long 5. Exposure: 12-3/8 wide by 49-7/8 long 6. Weight: 150 pounds per square. 7. Color: (Antique Chestnut) (Pinnacle Grey) B. Flashing: 1. Valley Shake XD 26 Gage, .0179, Aluminum-Zinc Alloy Coated Steel sheet. Pressure formed into a valley with a stone coated valley cap. Finish: Match upper exposed stone coated surface of the valley cap to the roofing material color. 2. Fascia Metal: Shake XD Starter Clip with Drip Edge, Aluminum Zinc Alloy Coated Steel Sheet, 26 gage, .0179 3. Rake / Gable Channel: Shake XD, Rake/Gable Channel, Aluminum-Zinc Alloy Coated Steel Sheet, 26 gage, .0179 4. Short Course Clip: Shake XD Short Course Clip, Aluminum-Zinc Alloy Coated Steel Sheet, 26 gage, .0179. Pressure formed for use with starting a short course or when XD Starter Clip with Drip Edge will not conform to existing eave/fascia. 5. Side Flashing: Aluminum-Zinc Alloy Coated Steel sheet, 26 Gage, .0179, pressure formed to flash vertical roof surface transition. Finish: Ceramic coated colored stone chip finish to match roofing material. 6. Pipe Jack Flashing: 26 gage, .0179 galvanized or Aluminum-Zinc Alloy Coated Steel, clean, prime and paint to match roof material. 7. Underpans Shake: Aluminum-Zinc Alloy Coated Steel Sheet, 26 Gauge, .0179, pressure formed to counter flash roof penetrations matching shake material profile. 8. Roof-to-Wall Flashing: Shake XD Channel Aluminum-Zinc Alloy Coated Steel Sheet, 26 gage, .0179. Pressure formed to flash vertical roof surface transitions. Finish: Paint to match roofing material. C. Hip & Ridge: Shake Ridge and hip covers and XD Channel, matching shake material, color, and finish. 1. Hips / Ridges: Shake Hip & Ridge Aluminum-Zinc Alloy Coated Steel Sheet, 26 gage, .0179 Pressure formed to match roofing material, color, and finish to be applied along hips and ridges. 2. Roof to Wall Flashing: Shake XD Aluminum-zinc coated steel sheet, 26 Gauge, .0179 inches, pressure formed angle installed at first batten to cover build up. Finish: Paint to match exterior finish. 3. Fasteners: Corrosion Resistant Screws Minimum No. 8, of sufficient length to penetrate inch minimum, color coordinated to match the panels. 2.3 ACCESSORIES A. Sheet Metal Materials: Aluminum- Zinc Alloy Coated Steel sheet: ASTM A792/A 792M, Class AZ50 coating designation; minimum grade 37. B. Felt Underlayment: ASTM D 226, Type II, No. 30 unperforated asphalt-saturated organic felt. C. Perimeter Underlayment: ASTM D 1970; self-adhering, polymer-modified, bituminous sheet underlayment; 40 mils thick. Provide primer when recommended by underlayment manufacturer. D. Sealant: One-part elastomeric polyurethane, sealant as recommended in writing by the Shake XD manufacturer. Where sealant will be exposed, provide in color to match panels. 1. Standard: ASTM C920-86. E. Fasteners: Corrosion Resistant Screws Minimum No. 8, of sufficient length to penetrate substrate minimum, black or color coordinated to match the panels. 3.1 EXAMINATION A. Examine substrate and conditions for compliance with requirements for maximum moisture content, soundness of framing, and other conditions affecting performance of Metal Roofing. (Damaged, rotted or loose roofing materials shall be removed and the substrate corrected for re-roofing applications).This particular roof should be in excellent condition, roof is 18 years old. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Clean substrate of any projections and substances detrimental to metal panel roofing. Cover knotholes or other minor voids in substrate with sheet metal flashing secured with roofing nails. B. Coordinate installation of metal panels with flashing and other adjoining work to ensure proper sequencing. Do not install roofing until vent stacks and other penetrations through roofing have been installed, are securely fastened and flashing is in place. C. Inspect and verify exterior stucco and EIFS wall enclosures are completed. 3.3 INSTALLATION A. General: Comply with manufacturers written instructions for products and applications indicated, unless more stringent requirements apply. B. Underlayment: Apply number of plies required by governing code, but at least one ply, with each ply overlapping ply below a minimum 6 inch and ends lapped at least 18 inch 1. Omit felt underlayment at areas of perimeter underlayment. Lap felt underlayment over perimeter underlayment as recommended by manufacturer, but not less than 2inch. C. Perimeter Underlayment: Apply minimum 245 inch wide layer of perimeter underlayment along entire perimeter of surface to receive metal shakes, including at eaves, ridges, edges, hips, valleys, skylights, dormers, and around projections through roof. Extend perimeter underlayment a minimum of 36 inch inside exterior wall line at edges. D. Valleys: Install in accordance with manufacturers instructions with a minimum 6 inch overlap in direction of flow. E. Flashing: Install as indicated on approved submittals and in accordance with manufacturers written instructions. F. Shake XD Panels: Install Metal Shake XD, accessories, flashing, and hip & ridge level and plumb. Use fasteners per above specifications. 1. Install each Shake XD Panel left to right in accordance with manufacturers instructions. Do not create a pattern. 2. The right side of each panel must be pushed into position to engage the Side-Lap locking mechanism. 3. Fasten each panel with minimum (5) fasteners horizontally along the back flange of each panel at pre-punched tabs. Review manufacturers instructions for fastener placement. 4. First course of panels positioned at eave will clip into XD Starter Clip with Drip Edge. G. Cut Metal panels into each side of valleys in accordance with the manufacturers instructions straight and true to the line of the valley. H. Hip & Ridge: Install Hip & Ridge along hips, ridges and rakes as indicated on approved submittals and in accordance with manufacturers written instructions. Bend and fold exposed ends of hips ridges and neatly, cap with an end cap or a piece of similar material. 3.4 CLEANING AND PROTECTION A. Damaged Units: Replace panels and other components of the work that have been dented damaged or have deteriorated beyond successful repair by finish touchup with acrylic coating and stone chip granules. B. Cleaning: After completing installation, remove any debris from the roof. C. Foot Traffic: Avoid walking on sidelaps.

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 541990
New
Federal
Fort Campbell, KY - API 653 External Tank Inspection
Solicitation # W9128F27QA006
Solicitation W9128F27QA006 is a firm-fixed-price requirement issued by the US Army Corps of Engineers Omaha District for API 653 external above-ground storage tank inspections at Fort Campbell, Kentucky. The scope of work specifically covers facilities G7140 and H7140 and includes conducting a teleconference kick-off meeting, performing external tank and visual containment area inspections, and testing alarms and Automatic Tank Gauge equipment. The contractor is required to provide a certified API 653 Inspector and a Project Manager to ensure compliance with industry standards including API 653, API RP 575, NFPA 30, and NFPA 326. Key deliverables consist of draft and final reports for each facility along with completed API Std 653 checklists, with all work to be completed by March 20, 2027. This acquisition is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 541990. Proposals must be submitted as a single PDF document not exceeding five pages, excluding the price worksheet and administrative pages, and must be sent to Contracting Specialist Tony Manna and Contracting Officer Brent Bertrand by November 13, 2026. Award decisions will be based on the most advantageous offer, evaluating technical capability, inspector certifications, relevant project experience, and price reasonableness. Contractors must adhere to strict installation security requirements for personnel and vehicle access and comply with DFARS 252.204-7012 regarding the safeguarding of covered defense information.
All Other Professional, Scientific, and Technical Services

POSTED

1 day ago

DEADLINE

in 14 days
View Details
NAICS: 541330
New
Federal
USACE Omaha District - $249M Unrestricted Sentinel Construction Management Services (CMS) MATOC
Solicitation # W9128F26RA124
The USACE Omaha District is soliciting proposals for the Sentinel Construction Management Services (CMS) Multiple Award Task Order Contract (MATOC) under NAICS 541330. This unrestricted effort has a total estimated capacity of 249 million dollars, with the government intending to award four firm-fixed price Indefinite Delivery Contracts (IDCs). The contract supports the U.S. Air Force across the Northwestern Division, covering 15 states including Washington, Oregon, Idaho, Nevada, Utah, Montana, Wyoming, Colorado, North Dakota, South Dakota, Nebraska, Kansas, Iowa, Missouri, Minnesota, and Wisconsin. The performance period consists of a five-year base period with options extending the total duration up to seven years and six months. The scope of work involves providing professional, administrative, and management staff augmentation to oversee construction projects. Key responsibilities include performing Quality Assurance inspections per ER 1180-1-6, monitoring safety compliance according to EM 385-1-1, and managing project documentation through the Resident Management System or Construction Management Platform. Awards will be based on a best-value tradeoff process evaluating past performance, technical and management approach, key personnel resumes, small business participation, and cost. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) by November 10, 2026.
Engineering Services

POSTED

3 days ago

DEADLINE

in 11 days
View Details
NAICS: 237990
New
Federal
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Solicitation # W9128F27BA007
The Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2 project is a construction effort located along the left descending bank of Lake Sharpe near Big Bend, South Dakota. Managed by the USACE Omaha District, the project focuses on Reach 4 of the lake and involves the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path, and a 200-by-1,500-foot island in water up to three feet deep. Key technical requirements include the installation of a riprap revetment to protect against erosion and the planting of cottonwood trees and other culturally significant vegetation. These efforts are designed to create approximately 32 acres of riparian habitat and 5.17 acres of emergent wetland through tasks such as earth moving, grading, bank shaping, and topsoil placement. This procurement is a 100 percent Small Business Set-Aside under NAICS code 237990, with an estimated construction value between 10 million and 25 million dollars. The project is being solicited as a single-step sealed bidding process via an Invitation for Bid, with a required period of performance of 550 days following the Notice to Proceed. Bidders must be registered in the System for Award Management and submit their offers through the PIEE Solicitation Module. Additional requirements include the provision of performance and payment bonds and adherence to South Dakota Heavy and Highway wage determinations, with a specific note regarding a 4.5 percent Tribal Employment Rights Ordinance tax.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in about 1 month
View Details
NAICS: 541990
New
Federal
Vandenberg SFB Tank Inspection
Solicitation # W9128F27QA002
Solicitation W9128F27QA002 is a firm-fixed-price, non-personnel services contract for the inspection of Department of Defense fuel tanks at Vandenberg SFB, California. This 100 percent Service-Disabled Veteran-Owned Small Business set-aside under NAICS 541990 requires the contractor to perform API 653 internal inspections on aboveground storage tanks, specifically focusing on Tank 1702, a welded steel vertical Jet A storage tank. The scope of work includes fuel removal, disposal, tank cleaning, and the replacement of wiper seals. Contractors must provide a certified API 653 inspector and a project manager to ensure compliance with API 650, API 653, NFPA 30, and various Unified Facilities Criteria and military standards. The government will award the contract based on best value, evaluating technical capability, relevant experience in fuel tank draining and cleaning, and price reasonableness. Proposals are limited to five pages and must be submitted electronically by November 13, 2026. Key deliverables include draft and final inspection reports featuring non-destructive testing summaries, engineering calculations, and categorized repair recommendations. Due to the location on a military installation, all personnel must adhere to strict security vetting and base access requirements. The contract also includes an option for the removal and disposal of excess fuel up to 2,000 gallons per purchase order.
All Other Professional, Scientific, and Technical Services

POSTED

4 days ago

DEADLINE

in 14 days
View Details
NAICS: 237120
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, solicitation W9128F27RA045, is a design-build effort located at the Mather Army Aviation Support Facility in California. Managed by the USACE Omaha District, this firm-fixed-price contract is restricted as a total Small Business Set-Aside. The scope of work involves comprehensive repairs and upgrades to the AVGAS fueling system, including the installation of a sampling gauge hatch, a mechanical gauge, and an automatic tank gauge system. Physical improvements include recoating the tank exterior, replacing collision barriers, adding a full-length catwalk, and replacing audible and visual alarms. Additional requirements include repairing the remote containment basin drainage, replacing asphalt and concrete pavement in multiple areas, relocating a generator with a new concrete pad, and the demolition and replacement of the POL operation building. The project will be awarded using the Lowest Price Technically Acceptable (LPTA) method, with technical evaluations focusing on project experience—requiring three examples of projects exceeding 1 million dollars—and a detailed Gantt chart covering preconstruction, on-site construction, and post-construction phases. The projected period of performance is 365 days. Contractors must comply with the Davis-Bacon Act for prevailing wages and adhere to strict quality control standards, including a three-phase control process and final acceptance through punch-out, pre-final, and final inspections. Required deliverables include as-built drawings, and the contractor must provide performance and payment bonds within 10 days of award. Optional CLINs are included for the remediation of petroleum-contaminated soil, lead-based paint, and asbestos-containing materials.
Oil and Gas Pipeline and Related Structures Construction

POSTED

7 days ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS