This Award Notice opportunity from Department Of The Interior was posted on August 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The National Park Service, under the Department of the Interior, is seeking a firm-fixed-price contract for the removal and restoration of a degraded culvert at Conlon Creek within the Golden Gate National Recreation Area in Marin County, California. The project requires the complete removal of an 80-foot buried and rusted corrugated metal culvert caused by a 2015 blowout, followed by comprehensive channel stabilization using an engineered rock ramp to address the failure footprint and head cut. Work includes the construction of three rock step pools to enhance aquatic habitat, stabilization and filling of a 75-foot adjacent gully reducing sediment input into Redwood Creek, and limited in-channel work along up to 250 feet of the creek. All materials must be handled in accordance with environmental regulations, with existing bank and bed materials reused where possible and additional rock slope protection imported as needed. Performance is restricted to the in-channel work window between June 15 and October 15, 2026, to protect aquatic species, and the contractor must obtain all required permits and comply with local, state, and federal laws.
This solicitation is a total small business set-aside under NAICS code 237990, with size standards based on $45 million in average annual gross receipts over the past three years. Only small business concerns are eligible to respond. Offerors must hold a valid California State Contractor License, and key personnel experience will be evaluated alongside technical approach, schedule, project experience, past performance, and price in a best-value determination under FAR Part 15 procedures. A mandatory site visit requires RSVP, with details provided in Section L of the solicitation, and failure to attend may negatively impact proposal evaluation. All proposal submissions must be received by June 22, 2026, through www.sam.gov using the Standard Form 1442 and associated attachments, with questions directed to Contract Specialist Quinn Rankin at [email hidden], referencing solicitation number 140P8626R0003 in the subject line. The contract will include mobilization and demobilization, dewatering systems, selective demolition, construction of weirs and ramps, erosion control, soil haulage, as-built documentation, and rock importation as deliverables.
General Info
Golden Gate NPS seeks small business for Conlon Creek culvert removal, restoration, June-October 2026.
HighAI Summary for 140P8626R0003 Conlon Creek Culvert Removal & Restoration Q&A: This document is a Question & Answer (Q&A) file for solicitation 140P8626R0003 concerning the Conlon Creek Culvert Removal & Restoration project at Golden Gate National Recreation Area (GOGA). Dated June 11, 2026, it provides clarifications on project details such as site access, environmental protections, material handling, and construction requirements. Key topics include dumpster presence, water access, soil contamination, vegetation trimming, rock import criteria, sediment basin removal, equipment cleanliness inspections, and tree protection measures. The Q&A supports contractors in understanding project specifications and operational constraints.
PDF
PDF, High priority: read this firstq-and-a
HighAI Summary for 140P8626R0003 Conlon Creek Culvert Removal & Restoration Q&A REVISED 17 June 2026: This document is a revised Question & Answers (Q&A) file dated 17 June 2026 for solicitation 140P8626R0003 concerning the Conlon Creek Culvert Removal & Restoration project at Golden Gate National Recreation Area (GOGA). It provides clarifications on project details such as site access, environmental protections, equipment cleanliness, use of materials, and utility services. The Q&A addresses contractor concerns about site conditions, construction methods, and resource management, referencing specific plan sections and specifications to guide compliance and execution.
DOCX
DOCX, High priority: read this firstprovision
HighAI Summary for 52.209-13 Violation of Arms Control Treaties Certification Provision: This document contains the Federal Acquisition Regulation (FAR) provision 52.209-13, titled 'Violation of Arms Control Treaties or Agreements-Certification' dated November 2021. It requires offerors to certify whether they or their controlled entities have engaged in activities contributing to violations of arms control, nonproliferation, or disarmament agreements to which the United States is a party. The provision outlines certification options, procedures for reviewing relevant annual reports, submission requirements, and remedies for false certification. It applies to acquisitions above the simplified acquisition threshold and excludes commercial products and services. The document includes instructions for offerors to submit certifications or related information with their offers and provides contact information for inquiries.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 0001 to Solicitation 140P8626R0003 for Conlon Creek Culvert Removal: This document is Amendment 0001 to Solicitation 140P8626R0003 issued by NPS, PWR - GOGA MABO, effective May 22, 2026. It modifies the original solicitation by changing the site visit date from June 15 to June 4, 2026, at 10:00 AM PDT for the Conlon Creek Culvert Removal & Restoration project at Golden Gate National Recreation Area. No other changes are made. The amendment requires acknowledgment by offerors prior to the solicitation's receipt date.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 0002 to Solicitation 140P8626R0003 for Conlon Creek Culvert Removal & Restoration: This document is Amendment 0002 to Solicitation 140P8626R0003, effective 06/12/2026, issued by NPS, PWR - GOGA MABO. It modifies the original solicitation dated 05/22/2026 for the Conlon Creek Culvert Removal & Restoration project at Golden Gate National Recreation Area. The amendment includes the site visit sign-in sheet, Attachment 13 Questions & Answers, revised Attachment 1 Specifications, and revised Attachment 2 Drawings. No other changes have been made. Offers must acknowledge receipt of this amendment prior to the specified deadline.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 0003 to Solicitation 140P8626R0003: This document is Amendment 0003 to Solicitation 140P8626R0003, effective June 17, 2026. It modifies the original solicitation dated May 22, 2026, for the Conlon Creek Culvert Removal & Restoration project at Golden Gate National Recreation Area. The amendment includes Attachment 13 Questions & Answers and Attachment 2 Drawings, both revised on June 17, 2026. No other changes to the solicitation are made. The amendment requires acknowledgment by offerors prior to the solicitation's specified receipt date.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for B08_Att_01_Specifications_140P8626R0003 - Conlon Road Stream Stabilization Technical Specifications: This document contains the technical specifications for the Conlon Road Stream Stabilization project at Muir Woods National Monument, Golden Gate National Recreation Area, California. Dated January 2025 and edited February 8, 2026, it details the scope of work including site access, work zones, environmental protections, sequencing, and government-furnished materials. The specifications cover construction activities such as channel grading, rock and erosion control installations, and environmental safeguards. It includes a comprehensive table of contents outlining sections on project management, safety, quality, environmental protection, and construction procedures. This document is integral to the contract and guides the contractor on work restrictions, permissible work windows, and coordination requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for B08_Att_01_Specifications_140P8626R0003_REVISED_11_June_2026: This document is the Technical Specifications for the Conlon Road Stream Stabilization project at Muir Woods National Monument, Golden Gate National Recreation Area, California. Issued by the National Park Service in January 2025 and revised on June 11, 2026, it includes detailed work descriptions, project location, site access, environmental protections, sequencing, and government-furnished materials. The specifications cover work within the creek channel and banks, including removal and installation of structures, grading, erosion control, and environmental safeguards. It also outlines contractor use of premises, staging areas, and traffic control requirements, emphasizing the permissible work windows and coordination with other contractors.
PDF
PDF, High priority: read this firstdrawings
HighAI Summary for B08_Att_02 Construction Drawings for Conlon Creek Stream Stabilization Revised June 11, 2026: This document contains the revised construction drawings for the Conlon Creek Stream Stabilization project at Muir Woods National Monument, dated June 11, 2026. It includes a sheet index, detailed tables of areas and materials such as rock slopes, streambed materials, earthwork summaries, demolition instructions, and notes on site preparation, excavation safety, and traffic control. The drawings provide critical technical specifications and instructions for contractors, including excavation, grading, material handling, and environmental protection measures.
PDF
PDF, High priority: read this firstdrawings
HighAI Summary for B08_Att_02_Drawings_140P8626R0003 - Construction Drawings for Conlon Creek Stream Stabilization: This document is a set of construction drawings titled 'Conlon Creek Stream Stabilization Muir Woods National Monument' with drawing number GOGA 641 182805, sheet 1 of 10. It includes a sheet index, quality design certification, detailed earthwork summaries, erosion control, demolition instructions, and notes on site preparation, excavation safety, and contractor responsibilities. The drawings provide specifications for materials, areas, and construction methods for stream stabilization, including rock ramps, pools, weirs, and tributary streambed materials. The document is essential for guiding construction activities and ensuring compliance with safety and environmental standards.
PDF
PDF, High priority: read this firstdrawings
HighAI Summary for B08_Att_02_Drawings_140P8626R0003_REVISED_17_June_2026: This document is a revised set of drawings dated June 17, 2026, identified as B08_Att_02_Drawings_140P8626R0003. It includes a sheet index and detailed tables specifying areas, quantities of materials such as Class I-II RSP, engineered streambed material, and Class V-VIII RSP for various construction elements like chutes, pools, weirs, and rock ramps. The document also contains notes on excavation, earthwork, erosion control, demolition, and contractor responsibilities including safety, utility protection, traffic control, and site access. These drawings provide critical technical specifications and material quantities essential for project execution and contractor compliance.
PDF
PDF, High priority: read this firstbid-bond
HighAI Summary for Bid Bond for Invitation Number 140P8626R0003: This document is a Bid Bond form associated with Invitation Number 140P8626R0003 for construction services. It includes the legal obligations of the Principal and Surety(ies) to the U.S. Government, binding them to a penal sum for the bid. The bond ensures that the Principal will execute contractual documents and provide required bonds if their bid is accepted within specified timeframes. The form details the types of organizations involved, signatures, corporate seals, and instructions for completing the bond. It also outlines conditions under which the bond obligation is void and the responsibilities of sureties, including co-surety arrangements and individual surety affidavits. The document is authorized for use when a bid guaranty is required and includes instructions for proper execution and submission.
DOCX
DOCX, High priority: read this firstcompliance-report
HighAI Summary for Compliance with Veterans' Employment Reporting Requirements - VETS-4212 Report: This document outlines the requirements under FAR clause 52.222-38 for offerors to comply with Veterans' Employment Reporting. It mandates that offerors who have been awarded Federal Government contracts priced at or above $150,000 in the past year must have filed the most recent VETS-4212 Report online. Offerors not meeting this threshold must provide a written statement to that effect. The document includes a checklist for offerors to confirm their status and requires signature, date, typed name, company name, and Unique Entity ID for submission.
DOCX
DOCX, High priority: read this firstkey-personnel-form
HighAI Summary for Key Personnel Qualifications Form for Solicitation 140P8626R0003: This document is a Key Personnel Qualifications form associated with Solicitation 140P8626R0003. It is intended for offerors to list qualifications of all key personnel as required under Section L of the solicitation instructions. The form captures job-related training, certificates, licenses, honors, awards, and specialty skills relevant to the project. It includes fields for personnel information, education, professional registration, and proposed roles on the project. The form is critical for evaluating the qualifications of personnel proposed for the contract.
DOCX
DOCX, High priority: read this firstpast-performance
HighAI Summary for Past Performance Questionnaire for Contract 140P8626R0003: This document is a Past Performance Questionnaire intended for use as source selection information for contract number 140P8626R0003. It includes instructions for the offeror and reference to complete respective sections, with emphasis on confidentiality and non-endorsement by the government. The questionnaire covers contractor information, contract details, reference contact information, and a detailed evaluation section assessing quality, schedule, cost control, management, small business subcontracting, and regulatory compliance. Ratings range from Exceptional to Unsatisfactory with space for comments. The document also specifies the return deadline and contact details for the Contract Specialist, dated for return by June 17, 2026.
PDF
PDF, High priority: read this firstpresolicitation
HighAI Summary for Pre-Solicitation Notice for Conlon Creek Culvert Removal RFP 140P8626R0003: This presolicitation notice dated May 2026 announces the upcoming Request for Proposal (RFP) 140P8626R0003 for the Conlon Creek Culvert Removal and Restoration project at Golden Gate National Recreation Area, Marin County, California. The project involves long-term channel stabilization to repair damage from a 2015 culvert blowout, including engineered rock ramp construction, rock step pools, culvert removal, and gully stabilization. The notice outlines work scope, option items, environmental restrictions, and compliance with laws and permits. It specifies a total small business set-aside under NAICS code 237990 and provides procurement details such as the RFP release date (May 18, 2026), proposal submission period, evaluation criteria, and site visit information.
DOCX
DOCX, High priority: read this firstproject-experience-questionnaire
HighAI Summary for Project Experience Questionnaire for Solicitation 140P8626R0003: This document is a Project Experience Questionnaire associated with Solicitation 140P8626R0003. It requests offerors to submit responses demonstrating relevant experience completing projects of similar nature and scope. The questionnaire includes sections for company and project details, contractor roles, pricing, performance periods, and detailed questions about project work, changes in price and schedule, problem resolution, successful methods, and additional information. The document is intended to evaluate the offeror's past project experience as part of the solicitation process.
DOCX
DOCX, High priority: read this firstrfp
HighAI Summary for RFP 140P8626R0003 Conlon Creek Culvert Removal & Restoration: This document is the Request for Proposal (RFP) 140P8626R0003 issued by the Department of Interior, National Park Service for the Conlon Creek Culvert Removal & Restoration project at Muir Woods National Monument and Golden Gate National Recreation Area. It includes the proposal submission package with instructions and forms required for offerors, such as project experience and past performance questionnaires, bid bond, key personnel qualifications, and subcontracting information. The document emphasizes careful review of Section L of the solicitation for proposal preparation instructions. It serves as the official solicitation for contractors to submit proposals for this restoration project.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Solicitation 140P8626R0003 for Conlon Creek Culvert Removal & Restoration: This document is a sealed bid solicitation (IFB) issued on 05/22/2026 by the National Park Service for the Conlon Creek Culvert Removal & Restoration project at Golden Gate National Recreation Area, Marin County, California. The project involves channel stabilization, removal of a buried culvert, construction of rock ramps and pools, and erosion control. The contract is a firm-fixed price, total small business set-aside under NAICS code 237990. Offers are due by 06/22/2026 at 1200 local time. The contractor must begin work within 10 calendar days after notice to proceed and complete within 365 days. The solicitation includes detailed specifications, drawings, and requires compliance with local, state, and federal laws, including obtaining necessary permits. A site visit is scheduled, and proposals must be submitted via email as instructed.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Wage Determination CA20260007 Rev 23 Jan 2026: This document is the Wage Determination CA20260007 dated January 23, 2026, superseding CA20250007. It covers building, heavy, dredging, and highway construction projects in multiple counties in California. The document specifies prevailing wage rates and fringe benefits for various construction trades including asbestos workers, boilermakers, bricklayers, divers, and carpenters. It includes area-specific wage rates, specialty pay provisions, and depth pay for diving work. The wage rates are effective from various dates, with the latest modification published on January 23, 2026.
DOCX
DOCX, Low prioritygeneral-references
LowAI Summary for General References Form for Solicitation B08_Att_10_PSP_Vol_II_GenRefs_140P8626R0003: This document is a General References form intended for offerors to provide the Government with general references as part of a solicitation process. It includes sections for offeror information, surety details, corporate bank contacts, insurance company data, subcontractor contacts, and material supplier information. The form is designed to be filled out legibly with names, addresses, telephone numbers, emails, and types of accounts or materials as applicable. It supports the evaluation of the offeror's background and reliability in the context of the solicitation identified by the filename B08_Att_10_PSP_Vol_II_GenRefs_140P8626R0003.
LowAI Summary for Report on Limitations on Subcontracting for Contract 140P8626R0003: This document is a template report on limitations on subcontracting for contract number 140P8626R0003, a total small business set aside contract. It includes fields for total contract value, performance period of 365 days, and type of service categorized as construction by special trade contractors. The report tracks payments made by the government to the prime contractor and to similarly and non-similarly situated subcontractors, with calculations for limitation on subcontracting percentage. The document appears to be a reporting template rather than a solicitation or contract award.
PDF
PDF, Low prioritysite-visit-sign-in-sheet
LowAI Summary for Site Visit Sign In Sheet for Project 140P8626R0003 Conlon Creek Culvert Removal & Restoration: This document is a site visit sign-in sheet for the National Park Service Golden Gate National Recreation Area project 140P8626R0003, titled Conlon Creek Culvert Removal & Restoration. The site visit took place on Thursday, June 4, 2026, at 10:00 AM PDT at the Muir Woods Sewer Lift Station Dirt Lot in Mill Valley, California. The sheet lists participants including their names, companies, titles, and contact information. The purpose is to record attendance and participation during the site visit.
Pre-Solicitation Announcement: Conlon Creek Culvert Removal & Restoration, GOGA
The Department of the Interior, National Park Service (NPS) at Golden Gate National Recreation Area (GOGA) has a requirement to implement a long-term channel stabilization project that would repair damage caused by a 2015 culvert blowout on a tributary to Redwood Creek. Emergency stabilization efforts occurred in 2016. The current channel stabilization design represents input from National Marine Fisheries Service, Regional Water Quality Control Board, as well as NPS technical staff (geomorphologist, aquatic ecologist) and engineering hydrologic consultants.
The specifications and drawings call for stabilizing the footprint of the culvert failure and head cut with an engineered rock ramp, construction of three rock step pools to provide for some habitat for aquatic animals, and the removal of a buried and rusted corrugated metal culvert (80 ft). Work would occur along up to 250 ft of creek. In addition, an adjacent gully (75 ft) that is actively contributing sediments to downstream Redwood Creek would be stabilized and filled to reduce future contributions of fine sediments. Existing bank and bed materials would be re-used either in the channel or as fill for the adjacent gully. Rock slope protection would need to be purchased and transported to the site.
The Contractor shall provide all supervision, labor, equipment, testing, and supplies necessary to complete the work as identified in the project specifications and associated documents provided as attachments to the solicitation. Contract work includes: 1. Mobilization and Demobilization 2. Install, Operate, and Maintain Dewatering and Water Diversion Systems 3. Selective Demolition 4. Construction of Weirs, Ramp, and Apron 5. Permanent Erosion Control Treatments and Plantings
Option Items 1. Haul Excess Soils to Landfill 2. Prepare As-Built Drawings 3. Import Rock for Engineered Streambed Material
In channel work is restricted to between June 15, and October 15, 2026
All work shall be performed in accordance with local, state, and federal laws. The Contractor shall obtain all necessary permits required to successfully complete the work.
All work shall be performed in accordance with local, state, and federal laws. The Contractor shall obtain all necessary permits required to successfully complete the work. The North American Industry Classification System (NAICS) Code for this requirement is 237990, with a corresponding size standard of $45 million in annual gross receipts for the past three years.
This acquisition is a Total Small Business Set-Aside. Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall not be considered.
Federal Acquisition Regulation (FAR) 36.211(b) requires agencies to provide description of policies and procedures that apply to definitization of equitable adjustments for change orders under construction contracts and data on the time required to definitize equitable adjustments for change orders under construction contracts. This information can be found at: https://www.doi.gov/pam/acquisition/policy/constructioncontract.
The Request for Proposal (RFP) will be available on/about Monday, May 18, 2026, by electronic means only and can be downloaded along with all related attachments from the Contracting Opportunities website at ww.sam.gov. The RFP will close 30 days from the actual date of issuance. The offeror is responsible for periodically checking the website for any Amendments that may be issued prior to the closing date of the RFP.
The Government intends to award a single, firm-fixed-price contract. All responsible sources may submit a proposal which will be considered by the agency. Evaluation for award will be made in accordance with the negotiated acquisition procedures outlined in FAR Part 15. Award selection will be made on a Best Value determination made after consideration of price and factors other than price (Technical Approach, Schedule, Project Experience, Key Personnel Experience, California State Contractor License, and Past Performance) as listed in Section M of the Request for Proposal.
An organized site visit will be scheduled. While not mandatory, offerors are urged and expected to inspect the site where the work will be performed. See Section L of the RFP (when issued) for more information regarding the date, time, and location of the site visit.
More opportunities from Department Of The Interior → Pwr GOGA(86000)
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.