Z--Conlon Creek Culvert Removal & Restoration, GOGA

Active
140P8626R0003Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Department of the Interior’s National Park Service at Golden Gate National Recreation Area is soliciting proposals for a firm-fixed-price contract dedicated to the Conlon Creek Culvert Removal and Restoration project. This project addresses long-term stabilization of a tributary to Redwood Creek, repairing damage caused by a 2015 culvert blowout and subsequent emergency work in 2016. The work involves removal of an 80-foot buried rusted corrugated metal culvert, construction of an engineered rock ramp with three rock step pools to enhance aquatic habitat, and stabilization and filling of an adjacent 75-foot gully that contributes sediment to Redwood Creek. The contractor is responsible for mobilization, dewatering and water diversion systems, selective demolition, constructing permanent erosion control treatments, and plantings along a project footprint of up to 250 feet of creek. Existing bank and bed materials will be reused where appropriate, with supplemental rock slope protection materials transported to the site as specified. In-channel work is confined to the period from June 15 to October 15, 2026, to protect environmental resources. This acquisition is a total small business set-aside under NAICS code 237990, with eligibility limited to firms that meet the SBA’s size standard of $45 million in annual receipts. Proposals will be evaluated on a best value basis under FAR Part 15 negotiated acquisition procedures, balancing price against non-price factors including technical approach, schedule, project and key personnel experience, possession of a California State Contractor License, and past performance. Contractors must obtain all applicable local, state, and federal permits prior to work. Option items include hauling excess soil offsite, preparation of as-built drawings, and importing engineered rock materials. An organized, though non-mandatory, site visit will be conducted to familiarize offerors with the work area. The solicitation is anticipated to be released electronically around May 18, 2026, with proposals due within 30 days; offerors are advised to monitor the federal Contracting Opportunities website for updates and amendments prior to submission. All work will be inspected and accepted at the project site in Marin County, California, with the government retaining oversight and approval authority.

General Info

Golden Gate NPS seeks small business for Conlon Creek culvert removal, restoration, June-October 2026.

Agency

Department Of The Interior → Pwr GOGA(86000)

NAICS

237990 - Other Heavy and Civil Engineering Construction View NAICS

Place of Performance

CA

Set-Aside

SBA

Documents

(20)

B08_Att_01_Specifications_140P8626R0003_REVISED_11_June_2026

PDFspecifications

Project Experience Questionnaire for Solicitation 140P8626R0003

DOCXproject-experience-questionnaire

B08_Att_02_Drawings_140P8626R0003 - Construction Drawings for Conlon Creek Stream Stabilization

PDFdrawings

52.209-13 Violation of Arms Control Treaties Certification Provision

DOCXprovision

Key Personnel Qualifications Form for Solicitation 140P8626R0003

DOCXkey-personnel-form

Past Performance Questionnaire for Contract 140P8626R0003

DOCXpast-performance

RFP 140P8626R0003 Conlon Creek Culvert Removal & Restoration

DOCXrfp

Bid Bond for Invitation Number 140P8626R0003

PDFbid-bond

Pre-Solicitation Notice for Conlon Creek Culvert Removal RFP 140P8626R0003

PDFpresolicitation

Solicitation 140P8626R0003 for Conlon Creek Culvert Removal & Restoration

PDFifb

Site Visit Sign In Sheet for Project 140P8626R0003 Conlon Creek Culvert Removal & Restoration

PDFsite-visit-sign-in-sheet

General References Form for Solicitation B08_Att_10_PSP_Vol_II_GenRefs_140P8626R0003

DOCXgeneral-references

B08_Att_02 Construction Drawings for Conlon Creek Stream Stabilization Revised June 11, 2026

PDFdrawings

Compliance with Veterans' Employment Reporting Requirements - VETS-4212 Report

DOCXcompliance-report

Wage Determination CA20260007 Rev 23 Jan 2026

PDFwage-determination

140P8626R0003 Conlon Creek Culvert Removal & Restoration Q&A

PDFq-and-a

Amendment 0001 to Solicitation 140P8626R0003 for Conlon Creek Culvert Removal

PDFamendment

Report on Limitations on Subcontracting for Contract 140P8626R0003

XLSXreport-on-limitations-on-subcontracting

B08_Att_01_Specifications_140P8626R0003 - Conlon Road Stream Stabilization Technical Specifications

PDFspecifications

Amendment 0002 to Solicitation 140P8626R0003 for Conlon Creek Culvert Removal & Restoration

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseSolicitation
Amendment 2

Contract was updated

Posted

Solicitation

Amendment 0

Contract was updated

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Pwr GOGA(86000)
Contacts1 person available
OfficeSAN FRANCISCO, CA, 94123, USA
Organization / Agency
Department Of The Interior → Pwr GOGA(86000)
Office AddressSAN FRANCISCO, CA, 94123, USA
Contacts

Full Description

Show more
CONLON CREEK CULVERT REMOVAL & RESTORATION, GOLDEN GATE NATIONAL RECREATION AREA

This Amendment 0002 is to:
1. Include the site visit sign-in sheet.
2. Include Attachment 13 Questions & Answers.
3. Include revised Attachment 1 Specifications.
4. Include revised Attachment 2 Drawings.
5. No other changes have been made.


This Amendment 0001 is to:
1. CHANGE THE SITE VISIT DATE from June 15 to Thursday, June 4, 2026, at 10:00 AM PDT.
2. No other changes have been made.

HOW TO ACCESS SOLICITATION DOCUMENTS: The full solicitation package (Standard Form 1442 and all associated attachments) is available for download from the Attachments section on this page. You can download each attachment individually or download all attachments as a zip file. Refer to the provisions and clauses and other attachments for additional information about this requirement and instructions on how to submit a proposal.

SITE VISIT INFORMATION: A site visit is scheduled. Information is located in Section L of the solicitation. RSVP required. While not mandatory, offerors are urged and expected to inspect the site where the work will be performed. See Section L of the solicitation for detailed information about the site visit, including meeting location.

QUESTIONS? Submit any questions regarding this solicitation in writing to Contract Specialist, Quinn Rankin, at Quinn_Rankin@ios.doi.gov and include solicitation number 140P8626R0003 in the subject line of the email.