Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Z--GRPO - MILE CREEK STONE BRIDGE TRAIL

Awarded
140P6026B0005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract for the Mile Creek Stone Bridge Trail project, solicited under number 140P6026B0005 and issued by the National Park Service within the Department of the Interior, is a sealed bid procurement set aside exclusively for total small businesses under NAICS code 237310. The work involves the removal of abandoned roadway asphalt pavement near the historic Mile Creek Stone Bridge at Grand Portage National Monument in Minnesota to improve vehicular and pedestrian access to the Pines Picnic area. The period of performance is strictly limited to 60 calendar days from the Notice to Proceed, with a firm delivery schedule running from August 1, 2026, to October 1, 2026. All work must be performed by skilled personnel in compliance with industry standards, manufacturer specifications, and federal and state environmental regulations, utilizing environmentally safe materials for any pest control activities. The project scope includes complete site cleanup, documentation of all work through a photo log with dates and descriptions, and submission of a written certification of completion requesting a final inspection. The contract is awarded on a lump-sum basis, with pricing submitted through Section B and supported by a Schedule of Values that aligns total component costs with the contract price. The bid process requires strict adherence to submission guidelines, including electronic submission via email to Bridget Parizek at bridget_parizek@ios.doi.gov, using a PDF-labeled “BID PACKAGE” with a maximum email size of 25MB and specific subject line formatting. Bidders must complete SF 1442, correctly populate Blocks 14 through 20 with their UEI and total lump sum price, and include original signatures from authorized representatives. A bid guarantee of 20% of the proposed price, not exceeding $3 million, on Standard Form 24, is mandatory. Upon award, the contractor must provide performance and payment bonds in full contract value, submit a site-specific Accident Prevention Plan compliant with OSHA, conduct daily 15-minute toolbox safety meetings, and report all safety inspections within 24 hours. Environmental compliance and green procurement standards are required where applicable. The Contracting Officer holds sole authority for modifications, while the Contracting Officer’s Representative monitors technical performance without the power to obligate funds or alter terms. Invoicing must be processed electronically through the Treasury’s Invoice Processing Platform, requiring PDF vendor invoices, a completed pay application with approvals from the contractor, COR, and CO, and a signed

General Info

Enhance pedestrian access and vehicular safety at Mile Creek Bridge, Minnesota, starting Summer 2026.

Agency

Department Of The Interior → Mwr Midwest REGION(60000)View Agency

Contract Value

$350,000

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

NE

Set-Aside

NONE

Awardee

AIM HIGH CONSTRUCTION LLCView Profile

Award Issued Date

Documents

(11)

Sources Sought for Mile Creek Stone Trail Bridge Project 140P6026B0005

DOCXsources-sought

Amendment 0001 to Solicitation 140P6026B0005 for Mile Creek Stone Bridge Trail

PDFamendment

B08 Solicitation Attachment 1 Specifications for Mile Creek Stone Bridge Trail Improvements

PDFspecifications

Amendment 0003 to Solicitation 140P6026B0005

PDFamendment

B08 Solicitation Attachment 3 Submittal List

XLSsubmittal-list

B12 Miscellaneous Clarifications 0002

DOCXclarification

Minnesota Heavy and Highway Construction Wage Determination

PDFwage-determination

Solicitation 140P6026B0005 - Mile Creek Stone Bridge Trail Construction IFB

PDFifb

B09 Solicitation Amendments - Updated Drawings for Mile Creek Stone Bridge Trail Improvements

PDFamendment

Amendment 0002 to Solicitation 140P6026B0005

PDFamendment

B08 Solicitation Attachment 2 Drawings for Mile Creek Stone Bridge Trail Improvements

PDFdrawings

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseAwarded
Posted

Sources Sought

Type Changed

Sources Sought → Presolicitation

Type Changed

Presolicitation → Solicitation

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Mwr Midwest REGION(60000)
Contacts1 person available
OfficeOMAHA, NE, 68102, USA
Organization / Agency
Department Of The Interior → Mwr Midwest REGION(60000)
View Agency Profile
Office AddressOMAHA, NE, 68102, USA

Full Description

Show more
GRPO - MILE CREEK STONE BRIDGE TRAIL

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified SBE, VSBE, and DBE firms for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering heavy civil and infrastructure activities including site preparation, asbestos abatement, tunneling, underground piping, asphalt and concrete paving, electrical systems, and telecommunications. Interested firms must provide evidence of certification through the Department of General Services and the Port of Long Beach PlanetBids portal. Bidders are required to hold a valid California Contractor's license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades, including carpenters, laborers, cement masons, ironworkers, operating engineers, and teamsters. Funding is provided through multiple grants, including the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD 2021 Port Infrastructure Development Program, necessitating compliance with DBE Program requirements. Interested parties must contact Lead Estimator Cassandra Shore to receive an Invitation to Bid via the BuildingConnected system, with a response deadline of September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 8 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Department of Transportation

POSTED

about 14 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237310
New
SLED
ACADEMY OF RICHMOND COUNTY PARKING LOT PAVEMENT REPAIR and STRIPING
Solicitation # 26-214
The Richmond County Board of Education has issued RFP 26-214 for turnkey pavement repair and striping services at the Academy of Richmond County, located at 910 Russel St., Augusta, Georgia. The scope of work includes patching designated areas to match existing pavement, installing curb and gutter to enclose grease trap access manholes, and performing line striping. Specific technical requirements include the use of 3,000 FSI concrete with a fine broom finish, 98% compacted subgrade, and MPI #32 alkyd traffic-marking paint. All new striping and hatching must be yellow, while stop bars and existing crosswalks must be recoated in white, adhering to Georgia DOT Construction Standards. Asphalt top courses must cure for at least 14 days before painting. The contract will be awarded to the lowest responsible and responsive bidder, with an anticipated award date of October 20, 2026. Sealed bids are due by 3:00 PM on October 7, 2026, and must include turnkey pricing, a project lead time, company references, and a signed Sex Offender Acknowledgement Form. Contractors must maintain commercial general liability insurance of 2 million dollars and worker's compensation insurance of 1 million dollars. Compliance with Georgia state laws is mandatory, including E-Verify affidavits, periodic criminal history record inquiries under O.C.G.A. 35-3-34, and adherence to a smoke-free environment on school property. All work coordination and deliveries must be cleared through David Perry.
Richmond County Board of Education

POSTED

about 19 hours ago

DEADLINE

in 25 days
View Details

More opportunities from Department Of The Interior → Mwr Midwest REGION(60000)

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS