This Solicitation opportunity from Department Of The Interior was posted on August 19, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--PAINT THE POINT BONITA SUSPENSION BRIDGE

Closed
140P8624R0017Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 04, 2026. A critical component of this contract is strict adherence to DBE Good Faith Effort (GFE) requirements to secure project financing. Bidders must demonstrate comprehensive outreach and recruitment, including posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must utilize the services of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to provide proof of these specific postings and agency utilizations within the bid package will result in the proposal being deemed non-responsive. Prime contractors are further required to flow these GFE obligations down to any subcontractors they award.
RT CONTRACTOR CORP

POSTED

about 10 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility, along with an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, standing-seam roofing, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 10 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located at 41901 Walnut Avenue in Greenfield, California. The project is scheduled for completion within 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and utility relocation; construction of the plant featuring a packaged Membrane Bioreactor system, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing wastewater treatment plant in service during the first two phases of construction. Managed by C. Overaa & Co., the solicitation encourages participation from small and disadvantaged businesses, including DBE, DVBE, MBE, WBE, and SBE certified firms. There is a specific local hiring goal requiring that 50 percent of the total construction workforce consist of residents from Monterey, San Benito, and Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are required to accept the standard Overaa agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026.
C. Overaa & Co.

POSTED

about 10 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements feature reinforced concrete floors, grounding and lightning protection, intrusion detection systems, and specialized foundation work using rigid inclusions and load transfer mats. The project encompasses a wide range of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. Site work is extensive, requiring clearing, rock excavation, grading, and the mitigation of impacts on existing wetlands. Infrastructure improvements include the installation of primary and secondary electrical distribution systems, telecommunications, access roads, and paved loading areas. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026, by contacting the primary point of contact to receive the formal bid invitation and documents.
J & J Contractors, Inc

POSTED

about 10 hours ago

DEADLINE

in 9 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC has issued a price-based Request for Bid for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes structural modifications such as saw cutting reinforced concrete walls and installing headers, as well as exterior excavation and the construction of retaining walls. A critical requirement of the project is the creation of an ADA-accessible route featuring the necessary ramps, landings, and handrails to reach the existing grade or sidewalk. The contractor is also responsible for weatherproofing the installation and restoring all disturbed interior and exterior surfaces. Bids are due by November 20, 2026, with a projected contract award date of December 4, 2026, and a completion target of March 31, 2027. This is a firm fixed-price solicitation where the lowest responsive and qualified bidder will be selected, subject to budgetary limits and Indian preference requirements under Chapter 10-3 of the Colville Tribal Code. Preference-eligible bidders may be awarded the contract even if their bid is higher than the lowest responsive bid, provided it falls within specific allowable differentials based on the total project cost. Qualified bidders must demonstrate technical and financial capacity, provide a detailed project schedule, and submit a subcontracting plan. Mandatory insurance requirements include Commercial General Liability of at least 1 million dollars per occurrence, Business Automobile Liability of 1 million dollars per accident, and Worker's Compensation as required by Washington state law. Final project acceptance by Colville Fuels is contingent upon the exit being fully operational and receiving all necessary approvals from the Authority Having Jurisdiction.
Confederated Tribes of the Colville Reservation

POSTED

about 10 hours ago

DEADLINE

in 30 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

CA

Set-Aside

SDVOSBC

Documents

22

140P8624R0017 Amendment 0001

PDF, High priority: read this firstamendment
High

140P8624R0017 Amendment 0002

PDF, High priority: read this first2 pages · amendment
High

140P8624R0017 Amendment 0003

PDF, High priority: read this first5 pages · amendment
High

140P8624R0017 Attachment 8 - General References

DOCX, High priority: read this first1 page · past-performance
High

140P8624R0017 Bid Schedule - Paint the Point Bonita Suspension Bridge

XLS, High priority: read this first2 pages · bid-schedule
High

140P8624R0017 - Bid Schedule: Paint the Point Bonita Suspension Bridge

XLS, High priority: read this firstspecifications
High

140P8624R0017 GOGA Paint Point Bonita Bridge

PDF, High priority: read this first49 pages · rfp
High

140P8624R0017 GOGA Paint Point Bonita Bridge Solicitation

PDF, High priority: read this first48 pages · rfp
High

140P8624R0017 - Point Bonita Suspension Bridge Protective Coating

PDF, High priority: read this first51 pages · rfp
High

140P8624R0017 - Relevant Experience Questionnaire

PDF, High priority: read this first5 pages · past-performance
High

CA20240007 Wage Determination - California

PDF, High priority: read this first45 pages · wage-determination
High

Point Bonita Lighthouse Bridge Stamped Plans

PDF, High priority: read this firstspecifications
High

Point Bonita Suspension Bridge Photographs and Technical Appendix

PDF, High priority: read this firstspecifications
High

Point Bonita Suspension Bridge Project Specifications

PDF, High priority: read this first60 pages · specifications
High

Point Bonita Suspension Bridge Project Specifications

PDF, High priority: read this first56 pages · specifications
High

Point Bonita Suspension Bridge Project Specifications

PDF, High priority: read this first60 pages · specifications
High

Structure No. 8140-006T - Point Bonita Suspension Bridge Inspection Report

PDF, High priority: read this first19 pages · specifications
High

140P8624R0017 Attachment 6 - Limitations on Subcontracting Report

XLSX, Low priority1 page · supporting-documents
Low

140P8624R0017 Past Performance Questionnaire

DOCX, Low priority3 pages · past-performance
Low

FAR 52.209-13 Violation of Arms Control Treaties or Agreements Certification

PDF, Low priority2 pages · certification
Low

RFP 140P8624R0017 - Responsibility Matters (FAR 52.209-7)

PDF, Low priority2 pages · supporting-document
Low

Site Visit Sign In Sheet - Point Bouita Bridge (14098624R0017)

PDF, Low prioritysite-visit-log
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice title changed.

Deadline changed

Response deadline changed from Aug 13, 2024 to Aug 20, 2024.

Deadline changed

Response deadline changed from Aug 20, 2024 to Aug 22, 2024.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Pwr GOGA(86000)
Contacts1 person available
OfficeSAN FRANCISCO, CA, 94123, USA
Office AddressSAN FRANCISCO, CA, 94123, USA

Full Description

Show more
The National Park Service (NPS) at Golden Gate national Park (GOGA) has requirement to apply a new protective coating to the Point Bonita Bridge at Golden Gate National Recreation Area, Golden Gate national Park, San Francisco, CA.

More opportunities from Department Of The Interior → Pwr GOGA(86000)

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS