This Government Contract opportunity from Department Of Defense was posted on March 6, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--Shore Protection Project, Ft. Pierce, Florida, Beach Renourishment

Awarded
W912EP-09-B-0005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Tampa Harbor Improvements Industry Day
Solicitation # W912EP27Z1CUA
The U.S. Army Corps of Engineers, Jacksonville District, has issued a special notice for an Industry Day event scheduled for November 18, 2026, regarding the Tampa Harbor Improvements project. This notice is for preliminary planning purposes and is not a solicitation for proposals. The event aims to gauge the capabilities and interest of the construction community, including small businesses, for a requirement slated for a fiscal year 2028 award. The overall project is expected to span six contracts over an eight to ten-year period, with a construction magnitude estimated between 100 million and 500 million dollars under NAICS code 237990. The specific focus of this Industry Day is Contract 1, which involves construction dredging to deepen and widen various sections of the Tampa Harbor federal navigation channel. Key deliverables include deepening Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel, and Cut-D (HB) to 49 feet MLLW, the Port Sutton Terminal Channel to 44 feet MLLW, and East Bay Channel Extensions 1 and 2 to 41 feet MLLW. The scope includes widening the Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel, with an estimated dredging volume of 4.4 million cubic yards. All work will incorporate one foot of allowable overdepth, and dredged materials will be disposed of in the East Bay Placement Area, DMMA 2-D, and DMMA 3-D. Interested parties must be registered in the System for Award Management to be eligible for future awards.
W074 Endist Jacksnvlle

POSTED

about 6 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
Federal
JP Murtha Float Mooring Bitts Retrofit
Solicitation # W911WN27BA001
The United States Army Corps of Engineers, Pittsburgh District, is soliciting a Firm-Fixed-Price construction contract for the John P. Murtha Floating Mooring Bitts Retrofit at the John P. Murtha Locks and Dam in Westmoreland County, Pennsylvania. This project requires complex in-the-wet construction to install Government-furnished floating mooring bitts into contractor-fabricated embedded frames on the existing river chamber middle wall. The scope of work includes engineering design, the fabrication and installation of two structural steel dewatering boxes with a maximum 90-day duration, heavy concrete demolition using wire-sawing and core drilling, and the integration of cast-in-place concrete. The contractor must provide a fully compliant floating plant, certified commercial dive teams for underwater rigging and sealing, and adhere to EM 385-1-1 safety standards. The total period of performance is 730 calendar days following the Notice to Proceed. This is an unrestricted full and open solicitation under NAICS code 237990, with a small business size standard of 45 million dollars. Award will be granted to the lowest responsive and responsible offeror, with a 10 percent price evaluation preference provided to HUBZone firms. Bidders must be registered in the System for Award Management and the Procurement Integrated Enterprise Environment, where all electronic bids must be submitted. The contract is subject to the Davis-Bacon Act for wage determinations and requires a three-phase Quality Control System. Key deliverables include the fully operational mooring bitt assemblies and comprehensive quality control documentation. Performance and payment bonds are required, with the performance bond set at 100 percent of the original contract price.
W072 Endist Pittsburgh

POSTED

about 6 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The Ft. Pierce beach renourishment project involves placing beach material from the Capron Shoals offshore borrow area along the shoreline south of the Ft. Pierce Inlet. The base bid requires the placement of approximately 125,000 cubic yards of material from the south jetty to R-35, with three additional options for further placement extending to R-36A and a fourth option regarding sea turtle relocation procedures. The project specifies a berm elevation of +7.6 NAVD 1988 and a construction slope of 1 vertical to 10 horizontal, with a total estimated value between 1 million and 5 million dollars. All work must be completed by May 30, 2009, with strict environmental restrictions prohibiting beach activity from May 30 through October 31 to protect marine turtle nesting. Bidders must provide Coast Guard certification for vessels per the Seagoing Barge Act and must be registered in the Central Contractor Registration and the Online Representations and Certifications Application. Price preferences are available for certified HUBZone small business concerns. This unrestricted acquisition falls under NAICS code 237990.

General Info

Contract Value

$2,291,073.25

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

FL, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
ContactsNo contacts available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA
ContactsNo contact information available

Full Description

Show more
The Ft. Pierce beach project is located along the shore just south of the Ft. Pierce Inlet. The project includes a base bid with four options. The base bid includes the placement of approximately 125,000 cubic yards of beach material on 1,000 feet of shoreline from the south jetty (near R-34) to R-35. In Option A, the beach placement area includes 25,000 cubic yards of beach material and extends from R-35 to R-35 + 250 feet. In Option B, the beach placement area includes another 25,000 cubic yards of beach material extending from R-35 + 250 feet to R-35A (approximately 250 feet long). In Option C, the beach placement area of R-35A to R-36A which is about 1,000 feet in length will require approximately 50,000 cubic yards. The fourth option, Option D, concerns the special procedures for sea turtles should relocation trawling become necessary. The berm width varies along the shoreline with the berm having an Elevation +7.6 NAVD 1988 and a construction slope of 1 vertical on 10 horizontal. The material for the beach will come from an offshore borrow area (Capron Shoals) located about 3.5 nautical miles southeast of the project area. All work shall be completed by May 30, 2009 (R-34 to R-37). No work shall take place on the beach during the period of May 30 through October 31st for areas from R-37 to R-34. No construction activity or equipment shall be allowed on the beach during these periods. Staging areas and temporary storage of pipes shall be off the beach to the maximum extent practicable during that portion of the marine turtle nesting season from March 1st through May 30 for areas from R-37 to R-34, and November 1 through November 31. Construction vibration monitoring may take place at any time after receipt of Notice to Proceed. Magnitude of construction is between $1,000,000.00 and $5,000,000.00. THIS IS AN UNRESTRICTED ACQUISITION. COAST GUARD CERTIFICATION OF VESSELS IS REQUIRED IN ACCORDANCE WITH THE SEAGOING BARGE ACT. ALL RESPONSIBLE BIDDERS ARE ENCOURAGED TO PARTICIPATE. There will be a price preference for certified HUBZone small business concerns that comply with the requirements in the solicitation as stipulated in FAR 19.1307. The solicitation will be issued on or about January 14, 2009 with bids due on or about February 13, 2009. Solicitation will be issued in electronic format only and will be posted on the Army Single Face to Industry (ASFI) website at https://acquisition.army.mil/asfi/. In order to receive notification of any amendments to this solicitation, interested vendors must REGISTER AS AN INTERESTED VENDOR on the Federal Business Opportunities website at http://www.fedbizopps.gov/. If you are not registered, the Government is not responsible with providing you with notification of any changes to this solicitation. You must be registered in the Central Contractor Registration in order to be eligible to receive an award from this solicitation. Call +1 (555) 000-0000 for more information or visit the CCR website at http://www.ccr.gov. You also must be registered in Online Representations and Certifications Application (ORCA) in order to receive an award from this solicitation. The ORCA website is located at http://orca.bpn.gov. NAICS Code 237990, size standard $20 million.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 237990
New
Federal
St. Lucie South Jetty Repair Industry Day
Solicitation # W912EP27Z1CUE
The U.S. Army Corps of Engineers, Jacksonville District, is conducting a preliminary planning phase for the St. Lucie South Jetty Rehabilitation project in Martin County, Florida. This is currently a special notice for an Industry Day event scheduled for December 7, 2026, and is not a formal solicitation for proposals. The project is planned for a fiscal year 2027 award under NAICS code 237990, with a price target range between 25 and 50 million dollars and an estimated period of performance of 730 calendar days. The scope of work involves rehabilitating the seaward-most 400 to 500 feet of the south jetty structure. Key activities include excavating bed material to place a widened marine mattress foundation, installing 9- to 15-ton toe protection and armor stones, and removing the existing asphalt walkway. The project requires strict adherence to environmental protections for Endangered Species Act listed species, including turtle deterrents and turbidity control measures. The government is seeking industry feedback on construction methodologies, equipment, and safety constraints, specifically regarding water-control measures like cofferdams and operational strategies for winter coastal conditions. Interested parties are invited to submit capabilities statements and responses to a technical questionnaire by December 4, 2026.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
Federal
Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)
Solicitation # W912EP-27-Q-1CTH
The U.S. Army Corps of Engineers, Jacksonville District, intends to award a sole-source contract to the Fish and Wildlife Research Institute of the Florida Fish and Wildlife Conservation Commission. The project focuses on nekton monitoring within selected zones and tributaries of the Lower St. Johns River in Northeast Florida. This effort is categorized under NAICS code 541620 for Environmental Consulting Services and is designed to assess the ecological impacts of a 2022 channel deepening project that increased the river depth to 47 feet to accommodate larger vessels for the Jacksonville Port Authority. The primary objective is to evaluate how changes in salinity and water quality resulting from the deepening affect the spawning, recruitment, and population dynamics of commercially and recreationally important species, such as blue crab, white shrimp, and red drum. Monitoring will specifically target critical habitats between river kilometers 14 and 48, as well as areas upstream of Julington Creek, to determine if shifting salinity gradients are impacting nursery habitats or resident freshwater species. This long-term sampling will provide the necessary data to gauge the overall environmental effects of the channel modifications on the estuary's nekton assemblages.
Environmental Consulting Services

POSTED

6 days ago

DEADLINE

in 9 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS